Maintenance/Upgradation Of Road No . 12 , Road Of Plot No . E-11 To E-20 ( Gopalpur ) And Road Cfc To Road No . 07 And Construction Of Rcc Drain ( Plot No . H-1 To H-7 ) And Culvert At I . A Sikandrabad Distt . Bulandshahar
Tender Overview
Project Description
Maintenance/Upgradation Of Road No . 12 , Road Of Plot No . E-11 To E-20 ( Gopalpur ) And Road Cfc To Road No . 07 And Construction Of Rcc Drain ( Plot No . H-1 To H-7 ) And Culvert At I . A Sikandrabad Distt . Bulandshahar
BOQ
| Name of Work: Maintenance/Upgradation of Road No. 12, Road of Plot No. E-11 to E-20 (Gopalpur) & Road CFC to Road No. 07 and Construction of RCC Drain (Plot No. H-1 to H-7) & Culvert at I.A. Sikandrabad, Distt.-Bulandshahar | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Supply & Stacking of 45-63 mm gauge approved stone ballast (10cm loose) for patches & inter coat duly stacked on road side true to template including dressing surface where materials is to be staked including cost of materials its cartage octoi royalty, labour T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge. | 641.63 | Cum | |
| 2 | 2 | Supply & Stacking of 22.4-53 mm gauge approved stone ballast (10cm loose) for patches & top coat duly stacked on road side true to template including dressing surface where materials is to be staked including cost of materials its cartage octoi royalty, labour T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge. | 699.31 | Cum | |
| 3 | 3 | Supply & Stacking of crushed stone dust for consolidation of stone ballast as screening material including octoi royalty, labour T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge. | 268.19 | Cum | |
| 4 | 4 | Consolidation of 45-63 mm gauge hard stone ballast for 10cm (loose) thick inter coat by road roller including hire and fuel charges of road roller excluding cost of stone ballast but including opening out stacks, sorting ballast into different sizes spreading making medhi to retain water also including labour for spraying screening material to be used for blinding purpose and also including cost of carriage of materials & water and T & P etc. required for proper completion of the work water for consolidation to be arranged by the contractor himself at his own cost as per direction of Engineer-in-charge. \n | 641.63 | Cum | |
| 5 | 5 | Consolidation of 22.4-53 mm gauge hard stone ballast for 10cm (loose) thick top coat by road roller including hire and fuel charges of road roller excluding cost of stone ballast but including opening out stacks, sorting ballast into different sizes spreading making medhi to retain water also including labour for spraying screening material to be used for blinding purpose and also including cost of carriage of materials & water and T & P etc. required for proper completion of the work water for consolidation to be arranged by the contractor himself at his own cost as per direction of Engineer-in-charge. | 699.31 | Cum | |
| 6 | 6 | Water allowance to be allowed between 15 November to 31st May required for proper completion of the work as per direction of Engineer-in-Charge. \n | 1340.94 | Cum | |
| 7 | 7 | Providing and laying factory made chamfered edge cement concrete paver blocks (80mm thick M-40 grade) in footpath, park & lawns driveway or light & traffic parking etc. of required strength thickness and size/shape, made by table vibratory method using PU mould, laid in required color and pattern over 50mm thick compacted bad of coarse sand, compacting and prober embedding/ laying of interlocking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size & pattern, finishing & sweeping extra sand, all complete as per manufacture specifications & direction of Engineer-in-Charge. | 7615.8 | Sqm | |
| 8 | 8 | Cement concrete with 4cm. gauge stone grit, coarse sand & cement in the proportion of 8:4:1 including supply of all materials, labour, T & P etc. required for proper completion of the work. | 197.6 | Cum | |
| 9 | 9 | Cement concrete with 2cm. gauge stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, T & P etc. required for proper completion of the work. | 107.92 | Cum | |
| 10 | 10 | Renewing parties 1.5metere wide including dressing, surface filling upto 8cm (3\") depth and making namunas, at every 15 metre apart on either side of the road true to parti template with side slopes of 1:2 etc. trenches for taking the earth to be so dug that they from a continuous side drain at boundary. | 2718 | RM | |
| 11 | 11 | Excavation in Foundation in ordinary soil (Loam clay, or sand) including lift upto 1.5meter and lead upto 30m. including filling, watering and ramming of excavated earth into the trenches or into the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30M. (100fts) from the foundation trenches. | 935.9 | Cum | |
| 12 | 12 | Same as above item but for 1 extra lead & lift. | 6.32 | Cum | |
| 13 | 13 | RCC in 1:1.5:3 in foundation including all material, labour, T & P etc. required for proper completion of the work as per direction of Engineer-in-Charge. | 239.3 | Cum | |
| 14 | 14 | M.S. (tor Steel or plain) in Plain work such as R.C.C. work including beding for proper shape including supply of all material, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge. | 283.15 | Qtl. | |
| 15 | 15 | M-150 Brick work in 1:3 one cement : 3 cement and coarse sand mortar in foundation & plinth including supply of all material, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge. | 34 | Cum | |
| 16 | 16 | 4cm thick 1:2:4 plain cement concrete floor with cement approved coarse sand & 2cm approved stone grit including supply of all material, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge. | 10 | Sqm | |
| 17 | 17 | Struck pointing with cement mortar consisting of 1 part cement and 2 part of fine sand of 1.25 fineness modulus including supply of all material, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge. | 8.36 | Sqm | |
| 18 | 18 | Flush pointing with cement mortar consisting of 1 part cement and 2 part of fine sand of 1.25 fineness modulus including supply of all material, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge. | 16 | Sqm | |
| 19 | 19 | Finishing wall with water proof cement paint of approved make on new work with three coats to give an even shade including supply of all materials, labour, and T&P etc. required for proper completion of the work. | 8.36 | Sqm |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender