| 1 | 1 | SUPPLY OF STP POLES 11 METER LONG | | 67 | Nos. |
|---|
| 2 | 2 | SUPPLY OF 11KV (3X185)SQ MM XLPE CABLE | | 320 | MTR |
|---|
| 3 | 3 | SUPPLY OF 3X185 SQ MM 11 KV JOINTING KIT (OUT DOOR TYPE) | | 4 | Nos. |
|---|
| 4 | 4 | SUPPLY OF 3X185 SQ MM 11 KV JOINTING KIT (INDOOR TYPE) | | 6 | Nos. |
|---|
| 5 | 5 | SUPPLY OF11-KV PIN INSULATOR | | 162 | Nos. |
|---|
| 6 | 6 | SUPPLY OF 11-KV GI PIN WITH NUT | | 162 | Nos. |
|---|
| 7 | 7 | SUPPLY OF 11-KV DISK INSULATOR (T&C TYPE) | | 36 | Nos. |
|---|
| 8 | 8 | SUPPLY OF 11-KV DISK FITTING (T&C TYPE) | | 36 | Nos. |
|---|
| 9 | 9 | SUPPLY OF ACSR DOG CONDUCTOR | | 6798 | MTR |
|---|
| 10 | 10 | SUPPLY OF 11-KV V TYPE CROSS ARM | | 49 | Nos. |
|---|
| 11 | 11 | SUPPLY OF CROSS ARM CLAMP | | 49 | Nos. |
|---|
| 12 | 12 | SUPPLY OF F-BRACKET WITH NUT &BOLT | | 49 | Nos. |
|---|
| 13 | 13 | SUPPLY OF STAY SET COMPLETE | | 32 | Nos. |
|---|
| 14 | 14 | SUPPLY OF TOP CHANEL(125X65X2240)MM | | 10 | Nos. |
|---|
| 15 | 15 | SUPPLY OF T -OF CHANNNEL(125X65X1300)MM | | 4 | Nos. |
|---|
| 16 | 16 | SUPPLY OF DROPPER CHANNEL | | 10 | Nos. |
|---|
| 17 | 17 | SUPPLY OF CROSS BRACING SET | | 9 | Nos. |
|---|
| 18 | 18 | SUPPLY OF SUB STATION ANGLE(75X75X6X2028)MM | | 2 | Nos. |
|---|
| 19 | 19 | SUPPLY OF G. I. WIRE 8 SWG( FORGUARDING) | | 2700 | KG |
|---|
| 20 | 20 | SUPPLY OF EARTHING ROD OF 20X2500 MM FOR EARTHING OF POLE | | 67 | Nos. |
|---|
| 21 | 21 | SUPPLY OF11 KV VCB FOR I/G CTR 10/100/5A,350 MVA,(MAKE-ABB)24 VOLT | | 1 | Nos. |
|---|
| 22 | 22 | SUPPLY OF CLAMP WITH NAT&BOLT | | 68 | Nos. |
|---|
| 23 | 23 | SUPPLY OF GUARDING ANGLE | | 56 | Nos. |
|---|
| 24 | 24 | SUPPLY OF GUARDING ANGLE CLAMP | | 56 | Nos. |
|---|
| 25 | 25 | SUPPLY OF 6 MM DIA GI PIPE 10 FEET LONG | | 6.06 | MTR |
|---|
| 26 | 26 | SUPPLY OF STONE PAD | | 67 | Nos. |
|---|
| 27 | 27 | SUPPLY OF NUT &BOLT OFF SIZE | | 65 | KG |
|---|
| 28 | 28 | SAFE CARRAGE OF LINE MATERAIL FROM OUR STORE TO WORK SITE\nALL RESPECT | | 1 | JOB |
|---|
| 29 | 29 | ERECTION OFSTP POLES 11 METER LONG BY DIGGING OF PITS. COMPLETE IN\nALL RESPECT | | 51 | Nos. |
|---|
| 30 | 30 | ERECTION OF STP DOUBLE POLES 11 METER LONG BY DIGGING OF PITS.\nCOMPLETE IN ALL RESPECT | | 6 | Nos. |
|---|
| 31 | 31 | ERECTION OF STP FOUR POLES 11 METER LONG BY DIGGING OF PITS.\nCOMPLETE IN ALL RESPECT | | 1 | Nos. |
|---|
| 32 | 32 | GROUTING OF STP POLES 11 METER LONG BY CEMENT BRICK BALLAST AND\nRIVER SAND IN RATIO OF 1:4:8 INCLUDING PROVIDING GROUTING MATERIAL COMPLETE IN ALL RESPECT. | | 51 | Nos. |
|---|
| 33 | 33 | GROUTING OF STP DOUBLE POLES 11 METER LONG BY CEMENT BRICK BALLAST AND RIVER SAND IN RATIO OF 1:4:8 INCLUDING PROVIDING\nGROUTING MATERIAL COMPLETE IN ALL RESPECT. | | 6 | Nos. |
|---|
| 34 | 34 | GROUTING OF STP FOUR POLES 11 METER LONG BY CEMENT BRICK BALLAST AND RIVER SAND IN RATIO OF 1:4:8 INCLUDING PROVIDING GROUTING\nMATERIAL COMPLETE IN ALL RESPECT. | | 1 | Nos. |
|---|
| 35 | 35 | ERECTION AND GROUTING OF STAYS INCLUDING PROVIDING ALL REQUIRED GROUTING MATERIAL COMPLETE JOB AS PER RESSPO SPECIFICATION | | 32 | Nos. |
|---|
| 36 | 36 | LAYING OF 11 KV XLPE CABLE USING 6 MM GI PIPE ( GI PIPE WILL BE PROVIDED BY THE CONTRACTOR) AND 11 KV JOINTING KITS AS PER RESPO\nNORMS | | 160 | MTR |
|---|
| 37 | 37 | STRINGING AND SAGGING OF ACSR DOG CONDUCTOR ON POLE INCLUDING\nBINDING, JUMPERING, NOZLING COMPLETE IN ALL RESPECT. | | 6.789 | KM |
|---|
| 38 | 38 | EARTHING OF POLE BY MS EARTHING ROD 20*2500 MM AND 6 SWG EARTHING WIRE COMPLTE IN ALL RESPECT AS PER RESSPO SPECIFICATON | | 67 | No. |
|---|
| 39 | 39 | INSTALLATION OF GUARDING ANGLES AS PER RESSPO NORMS IN ALL REPECT | | 56 | NO. |
|---|
| 40 | 40 | INSTALLATION OF NUMBER PLATE | | 60 | NO. |
|---|
| 41 | 41 | INSTALLATION OF DANGER BOARD | | 60 | No. |
|---|
| 42 | 42 | INSTALLATION OF 11 KV VCB FOR I/C CTR 100/5A/350 MVA, MAKE ABB 24 V | | 1 | No. |
|---|
| 43 | 43 | INSTALLATION OF 3 PH 11 KV ENERGY METER WITH MAKING CONNECTIONS AS\nPER RESSPO NORMS IN ALL REPECT | | 1 | NO. |
|---|
| 44 | 44 | INSTALLATION OF 11 KV PILFER AS PER RESPO NORMS | | 1 | JOB |
|---|
| 45 | 45 | PAINTING OF POLES WITH RED OXIDE AND ALLUMINIUM PAINT AS PER RESPO\nNORMS | | 67 | No. |
|---|
| 46 | 46 | GUARDING OF LINE WHEREVER REQUIRED | | 25 | Job |
|---|