| 1 | 1 | Providing on hire basis installation of LT Panel Board comprising with 63A-1No as incoming & 32A-4Nos as outgoing main switches incl 100A Busbar, Indicator & measuring instrument etc. incl. earthing arrangement & dismantling after the work. | | 15 | Item |
|---|
| 2 | 2 | Do-Do- 4way Power MCB DB with required nos of 30A/way MCB as out going & 1no 32A TPN Isolator as incomer etc incl. earthing arrangement & dismantling after the work. | | 30 | No |
|---|
| 3 | 3 | Do-Do- 8way SP MCB DB with required nos of 16A/way MCB as out going & 1no 25A DP Isolator as incomer etc incl. earthing arrangement & dismantling after the work. | | 90 | Nos |
|---|
| 4 | 4 | Do-Do- drawing of Main Wiring by drawing 1.1 K.V grade 4Cx25sq.mm PVC/A Al. cable through wall/ floor/ pavement/Catenary system & dismantling after the work. | | 900 | Mtrs |
|---|
| 5 | 5 | Do-Do- drawing of 1.1KV grade 2x6sqmm + 1x4sqmm single core P.V.C insulated & unsheathed copper wire & dismantling after the work. | | 1800 | Mtrs |
|---|
| 6 | 6 | Do - Do - drawing of 1.1KV grade 2x2.5sqmm + 1x1.5sqmm single Core P.V.C insulated & unsheathed copper wire & dismantling after the work. | | 4040 | Mtrs |
|---|
| 7 | 7 | Do-Do-3x1.5 sqmm (for separate Plug & Fluorescent Light Fittings.) | | 4425 | Mtrs |
|---|
| 8 | 8 | Do-Do- 230V, 150W Metal halide / 100W LED Flood (white) light fitting - do - do - do | | 45 | Nos |
|---|
| 9 | 9 | Do-Do- 230V, 4ft 40watt box type single fluorescent light fittings with tube copmplete incl. replacement of fused lamp & dismantling after the work. | | 376 | Nos |
|---|
| 10 | 10 | Do-Do- 230V, 40/60W B.C Lamp incl. holder copmplete incl. replacement of fused lamp & dismantling after the work. | | 201 | Nos |
|---|
| 11 | 11 | Supplying & providing on hire basis 240V A. C. 1400 mm / 56\" sweep ceiling fan with down rod as required & dismantling the same | | 457 | Nos |
|---|
| 12 | 12 | Supplying & providing on hire basis 240V A. C. 600 mm / 24\" sweep Air Circulater and dismantling the same after the end of programme.(for upto 3 days) | | 202 | Nos |
|---|
| 13 | 13 | Do-Do- 230V, 5A 5pin Plug Socket, with switch, & dismantling after the work. | | 308 | Nos |
|---|
| 14 | 14 | Do-Do- 230V, 5/15A 6pin Plug Socket, with switch, & dismantling after the work. | | 202 | Nos |
|---|
| 15 | 15 | Earthing with 50mm dia G.I pipe and 6/8 ,S.W.G G.I earth wire with galv,nut bolt washer etc.below ground level on hire basis & dismantling after the work. | | 60 | Nos |
|---|
| 16 | 16 | Add. Extra charges beyond 3(three) days. @2% more of the basic rate per day for 11 days (on item no. 1 to 15 above). | | 11 | Days |
|---|
| 17 | 17 | Finishing the end of following cable by crimping method incl.supplying fixing solderless socket (dowels Make) tape anticorrosive paste & jointing materials.\na) 4xCore 25 sq.mm PVC armoured Al. cable. | | 60 | Sets |
|---|
| 18 | 18 | DIESEL GENERATOR SET \nProviding on hire basis the cost of 10KVA, 3-phase sound proof Diesel Generator set (for light load) with controlling panel, main switch, change over switch and necessary battery as per requirement with earthing complete. (15 Locations) | | 490 | Sets |
|---|
| 19 | 19 | Cost of Diesel Oil (For 10 KVA DG Set - 4 Ltrs/hour x 6 hrs per day) incl. fuel handling charge. (15 Locations for 14 days) | | 11760 | Ltrs |
|---|
| 20 | 20 | Maintenance, charges for maintenance of the whole electrical installation and cost of Diesel Generator operator for operation DG Set as & when required round the clock, by semi-skiled Labour, through out the programme. (15 Locations x 3 shift x 14 days) | | 630 | Shift |
|---|
| 21 | 21 | Transportation charge of Electrical Materials & DG Set from Kolkata to work site & back. [15 Locations] | | 3030 | km |
|---|
| 22 | 22 | Cost of Service Connection Charges Paid to WBSEDCL.\n (15 Locations) | | 15 | Job |
|---|
| 23 | 23 | Period: 22.03.2021 to 04.04.2021 (14 days) | | | |
|---|
| 24 | 24 | Locations: | | | |
|---|
| 25 | 25 | Path Mandir | Satjelia Natwar High School | | |
|---|
| 26 | 26 | Durbachati Milan Vidyapith | Santigachi Flood Centre | | |
|---|
| 27 | 27 | Dakshin Laxmi Narayanpur Judhisthir Vidyapith | Central Satjelia M.C High School (Dayapur) | | |
|---|
| 28 | 28 | Pathar Pratima Anandalal Adarsha Vidyapih | Dayapur PC Sen High School | | |
|---|
| 29 | 29 | Gada Mathura Haripriya High School | Chottomollakhali Flood Centre | | |
|---|
| 30 | 30 | Gada Mathura Adarsha Binoy Vidyapith | Baromollakhali Flood Centre | | |
|---|
| 31 | 31 | ITI College | Taranagar BTC High School | | |
|---|
| 32 | 32 | New Integrated Govt. School (Bengali Medium Co-Ed) Boys Hostel | Paschim Radganagar Kalibari High School | | |
|---|
| 33 | 33 | Dakshin Mahendrapur S B High School | Mangal Ch. High School | | |
|---|
| 34 | 34 | Seventh Day Adventist English Medium School | Amrita Nagar high School | | |
|---|
| 35 | 35 | Pathar Pratima Mass Education Primary Teachers' Training Institute | Kumirmari High School(HS) | | |
|---|
| 36 | 36 | kamdebpur Snehalata Milan Bidyapith | Jelekhali Flood Centre (Anandapur) | | |
|---|
| 37 | 37 | Laxmi Jaanardanpur High School | Taranagar Saraswati High School | | |
|---|
| 38 | 38 | Kedarpur Ram Nanda High school | Moukhali Flood centre | | |
|---|
| 39 | 39 | Dakshin Shibganj F P School | BTC Flood centre | | |
|---|
| 40 | 42 | Note: 1) All the above rates should be quoted inclusive of all taxes & duties, District charges, Riverine charges and LWC as applicable (except item no. 22). \n2) Total is rounded off to the nearest rupees.\n3) WBSEDCL Service connection charge will be paid as per actual quotation | | | |
|---|