Agriculture Government Departments Closing in 0 days TDR #27184335

Tender For Electrical Non Schedule Items Cost Of Proposed 5 Mt Ripening Rooms

Issued by Government Departments · DDEM PRAYAGRAJ, Uttar Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
16 Mar 2021
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
DDEM PRAYAGRAJ → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Electrical Non Schedule Items Cost Of Proposed 5 Mt Ripening Rooms - 1 Supply, Erection, Testing And Commissioning Of 11Kv , 3Ph, 50Hz, 350 Mva, 630 Amps, Outdoor Type 1 Vcb Panel H.T.Control Panel Comprising Of 1 Vcb Fabricated Out Of 2 Mm Cold Rolled Mild Steel.Metal Clad, Free Standing Totally Enclosed Cubicle Type, Fully Compartmentalised & Suitable For Operation On 11 Kv, 3 Phase, 50 Hz Ac Earthed System And Comprising Of The Following As Per The Details Spectifications Below: Nvcb Panel Consisting Of : Na. 3P Vacuum Circuit Breaker, Horizontal Drawout, Horizontally Isolated Type, 630 Amps, 350 Mva.11 Kv, 26.3 Ka With All Standard Accessories Fitted With, Shunt Trip / Closing Coil, Motor:220V / 110V Ac Motor / Hand Operated Mechnism And Operation Counter-1No. Nb. Non Lockable Breaker Control ( Tnc ) Switch With Twistle Grip Handle And Spring Return To Neutral-1 Set. Nc. 3P, Non Directional Idmt 30 / C, 1 E / F Relay With Instantaneuous Elements Mc 31A-1 Set. Nd. Resin Cast Cts 15 / 7.5 Va Classs 1-3 Nos. Ne. Resin Cast Pts, 3P, 100Va Class 1-3Nos. Nf. Breaker On / Off Indication Lamps-1 Set. Ng. Voltmeter With Selector Swich-1No. Nh. Ammeter With Selector Swich-1No. Ni. Aluminium Busbar, Suitable Rating 3 Phase, Air Insulated With Heat Shrinkable Sleeves-1Set. Nj. Eatrth 25X3 Mm Tin Coated Copper Busbar-1Set. Nk. Busbar Supports Resin Cast With 33Kv Dielectric And Mechanical Strength-1 Set. N 2 Transformer N63 Kva 11Kv / 433V Dyn11 Oil Emmersed Type Transformer With Off Circuit Tap Links Of Rating +5% To -5% @2.5%. Class Of Insulation F With Letest Is 3 Supply, Installation, Testing & Commissioning Of Indoor Type Free Standing Main Lt Panel Including 56 Kvar Capacitor Section With Following Switch Gears:- 4 Diesel Generator Set Nsupply, Installation, Testing & Commissioning Of Diesel Generating Set Of 40Kva Rating Silent Type Radiator Type, Suitable For Of 415V, 3 Phase 4 Wire, 0.8 Pf. ( Lagging ) 50C / S A.C Supply Complete With Engine ( 1500 Rpm ) And Alternator Dg Set Controller With Accessories Including Residential Type Silencer And Manual Control Panel Fuel Service Tank As Per Standard, Battery And Battery Charger With All Associated Accessories Including Mccb Of Suitable Rating & Standard Set Of Tools And Anti-Vibration Mounting Pads Etc. The Specification Shall Be As Per Gem Specification Attached. The Instalation, Testing, Commissioning Shall Be Done As Per Gem. 5 Supply Of 12 ( 300Mm ) Dia ( 900 Rpm ) Single Phase Exhaust Fan With Louvres Complete As Required. 6 Supply Of 1200 Mm Dia Ceiling Fan Complete As Required Crompton Or Equivalent As Per Approved Makes. 7 Voltage Stabiliser Nsupply, Installation, Testing, Commissioning Of Servo Motor Operated Automatic Line Voltage Correctors Copper Bound Indoor Type, Continuous Duty, Conforming To Is9815 ( Part 1 ) / 1994 ( Reaffirmed 2009 ) Suitable For Phase Voltage Of 120-280V. 3 Phase Line Voltage Corrector Shall Comprise Of 3 Single Phase Line Voltage Correctors Conforming To Is 9815 ( Part 1 ) / 1994 ( Reaffirmed 2009 ) , Connected In Star And Enclosed In A Single Enclosure With Common Control Panel And Shall Be Suitable For Unbalanced Input Voltage. Rate Output Voltage Shall Be 240V For Single Phase Lvc And 415V For 3 Phase Lvc Respectively. Rating 63 Kva 3 Phase, 3Ph, 50 Hz. N 8 Supply And Fixing Of Puf Insulation Panel Of Thickness Of 100 Mm, For Cold Room Walls & Ceiling Including Common Walls Inclusive Of All Accessories As Per Specification For 05 Nos Of Cold Room With 100 Mt Capacity ( Dimenssion - 16.0X6.1X3.5 Mtr ) , 04 Nos Ripening Chmber With 10 Mt Capacity ( Dimenssion - 7.5X4.3X3.5 ) . Make - Lloyd Insulation, Sintex, Rinac, Jindal, Bnal ( Puf Panel Thickness Ncold Room - 100 Mm ( Walls ) 100Mm ( Ceiling ) Nante Chamber - 100Mm ( Walls & Ceiling ) Nb ) Density - 40 + / - 2 Kg / M3 Nc ) Closed Cell Content - 90 - 95% Nd ) Thermal Conductivity - 0.023 W / Mk Ne ) Compressive Strength - 2.1 Kg / M2 ( At 10% Deformation ) Nf ) Water Vapour Permeability - 0.8 -.12 Gms / Hr M2 Ng ) Fire Resistance - Self Extinguishing Nh ) Blowing Agent - Cfc Free Ni ) Sheet - 0.5 Mm Tct, Ppgi ) N 9 Supply And Fixing Of Cold Room Floor With, Insulation Material- Puf Slab Of 100Mm Thickness ( In 2 Layers Of 50 Mm Each ) , Vapour Barrier, Inclusive Of All Accessories As Per Specification. Make - Lloyd Insulation, Sintex, Rinac, Jindal, Bnal, Industrial Foam. ( A ) Insulation Material - Puf Slabb ) Density - 40 + / - 2 Kg / M3c ) No. Of Layers - 2 Layers ( 40 Mm Each ) D ) Total Thickness - 80 Mme ) Vapor Barrier - Tarfelt, Polythene Sheet As Per Dwgf ) Vdf Floor - Vdf As Per Dwg ) 10 Supply And Installation Of Cold Room Doors ( For Positive Temp ) Insulated Type Of Horizontal Manual Sliding Door, Dimensions -1500 Mm X 2100Mm ( Clear ) With Sandwich Panels Constructed Of A Core Of 80 Mm Puf Complete With All Accessories As Per Specification Make - Metaflex, Lloyd Insulation, Rinac, Hormann, Gandhi Automation ( A ) Type Of Door - Manual Sliding Door Nb ) Dimensions - 1500 X 2100Mm Nc ) Type Of Panel - Sandwich Panels Constructed Of A Core Of 100 Mm Npuf On Both Sides Covered With 0.6 Mm Galvanized Steel Plate Finished With 20Mucoating. The Panels Are Supplied With Thermal Bridge-Free Pvc Surrounding Profiles Nd ) Sealing - All Round With Triple Rubber Profile Ne ) Colour Outside - Ral 9002 ( White ) Nf ) Colour Inside - Standard Colour Ral 9002 ( White / Grey ) Ng ) Hardware - Galvanised Steel Nh ) Track Rail - Drop / Lift Rail System Ni ) Finish Of Opening - To Be Included Nj ) Door Operation - Manual ) N 11 Supply, Installation, Testing, Commissioning Of Refrigeration System Of Suitable Capacity ( Reference Capacity 10.00 Kw For Each Room ) Complete With All Spares As Per Specification For Each Of 4 Nos Ripening Rooms. Make - Carrier, Rinac, Blue Star, Voltas ( 1. Design Temp: Evaporation -5 Deg C, Condensing 53.5 Deg C 2. Compressor – Scroll ( 1 Per Ripening Room ) 3. Air Cooled Condenser, Air Volume 4500 M3 / Hr, 10 Fins / Inch, 1 Axial Fan To Be Controlled By Thermostatic Control Unit With Outside Temp Sensing Arrangement . Typical Dimensions : 1000Mm ( Length ) X 837Mm ( Height ) X 672Mm ( Depth ) ( Makes- Carrier, Bitzer, Bock, Frascold ) 4. Dual Discharge Cooler Of Capacity 11Kw ( 1 Per Ripening Room. With 5 Axial Fans Of 450Mm, Air Volume 5250 M3 / Hr, Fin Spacing 5 Fin / Sq. Inch Typical Dimensions : 2500Mm ( Length ) Height Of Individual Coil 325Mm ( Makes – Luve, Alfa Laval, Guntner, Star Coolers ) 5. Ventilation Fan 15”, 6. Controls , Dryer, Thermostat, Thermostatic Expansion Valve, Solenoid Valve, Valve, Sight Glass 7. Sensors & Allied Equipment Per Room -Ethylene Sensor ( 1 ) , Co2 Sensor ( 1 ) , Pulp Temperature ( 1 ) , Ventilation System Connected To Damper & Ventilation Fan ( 1 Each ) 8. Piping – Suction 11 / 8” And Liquid Line ½” With Insulation 9. Control Panel For Each Room At Rear Side Of Ripening Room 10. Control Panel ( Plc Control Type ) To Have Following Features – Starting Arrangement For Compressor ( Hp / Lp / Op Cut Out For Each Compressor ) Contractor For Condenser Fan, Thermostatic Controller From Danfoss For Controlling The Fan, Crankcase Heater To Operate When Compressor Is Stopped And Off When Running. Lighting Main Switch Also In The Panel. This Will Have All Starters With Interlocking System. Push Buttons For Start / Stop. Humidifier & Ethylene Generator Switches Also In The Panel. Overload Relays & Fuses & Name Plates ) N N 12 Supply, Installation, Testing & Commissioning Of Ultrasonic Type Humidification System In All Ripening Rooms With Automated Controls Capable Of Providing 90 - 95% Rh In Each Ripening Room To Ensure Uniform Humidity In The Room, System Should Be Complete With Rh Control Sensor And Digital Display For Monitoring And Control Of Rh In Each Room, Complete With All Connections In All Rooms As Per Specification - The Humidification System Offered Should Be Ultrasonic Type Humidification System In All Ripening Rooms With Automated Controls Capable Of Providing 90 - 95% Rh In Each Room To Ensure Uniform Humidity In The Room, System Should Be Complete With Rh Control Sensor And Digital Display For Monitoring And Control Of Rh In Each Room, , Complete With All Connections In All Rooms As Per Specification. 13 Supply, Installation, Testing And Commissioning Of Portable Ethylene Generator Connected To An Electrical Plug Point Inside The Room, The Ethylene Generator Should Be Suitable For Providing Suitable Levels Of Ethylene ( As Per The Fruit Category ) In Ripening Rooms Of Volume Around 60 Cum By Catalytic Dehydration Of Developing Liquid Into Ethylene Gas Complete With Suitable Developing Liquid Required For Commercial Ripening Applications For Each Of The Ripening Rooms As Per Specification Alongwith 5 Ltr Of Developing Liquid Ethylene With Each Generator. Make- Aseko, Catalytic, American Ripener ( The Provision For Ethylene Gas Dosage For Ripening In Each Room Shall Be By Placing A Portable Ethylene Generator Connected To An Electrical Plug Point Inside The Room. The Ethylene Generator Should Be Suitable For Providing Suitable Levels Of Ethylene ( As Per The Fruit Category ) In Ripening Rooms Of Volume Around 58 Cum By Catalytic Dehydration Of Developing Liquid Into Ethylene Gas Complete With Suitable Developing Liquid Required For Commercial Ripening Applications. ) 14 Supply, Installation, Testing And Commissioning Of Ethylene Gas Sensor Complete With Display In All 4 Ripening Rooms Of Catalytic Type With Measuring Range Upto 2000 Ppm For Ripening Room Application As Per Specification. Make- Aseko, Carel 15 Supply, Installation, Testing And Commissioning Of Co2 Gas Sensors Complete With Display In All 4 Ripening Rooms Of Infrared Type With Measuring Range 0 – 5% Suitable For Ripening Application As Per Specification. Make- Aseko, Carel 16 Supply, Installation, Testing And Commissioning Of Air Ventilation Systems Connected With Gas Control System For All Ripening Rooms Suitable For Ripening Application As Per Specification 17 Supply, Installation, Testing And Commissioning Of Ripening Controller System Sensors For Integration And Control Of All Ripening Activities Suitable For Minimum 4 Ripening Rooms With Display & All Accessories ( Make: Aseko, Interko, Felix ) 18 Supply And Fixing Of Puf Insulation Panel Of Thickness Of 40 Mm Having Density 40 Kg / Cu.M ( + / - 2 ) , 0.5 Mm Thick Ppgi Sheet, Thermal Conductivity [ 0.023 W / Mk ] , For Ceiling At Loading, Unloading And Admin Area ( 3.5 Mtr. Hight From Floor Level ) Inclusive Of All Accessories And Installation As Per Specification. Make - Lloyd Insulation, Sintex, Rinac, Jindal 19 Supply, Installation, Testing And Commissioning Of Platform Weighscale Of Electronic Digital Type Of 200 Kg Capacity As Per Specifications Make - Kantawala, Swastik, Dewlite, Avery ( A ) Capacity 200 Kg Nb ) Pan Size & Moc 400Mm X 500Mm Minimum ( Of Ss ) For 200 Kg Ne ) Least Count 20 Gm Maximum For 200 Kg Nh ) 100% Tare Through Keyboard Ni ) Stamping To Be Provided ) 20 Supply, Installation, Testing And Commissioning Of Plastic Crates Of Outer Dimensions 540Mm X 360Mm X 290Mm ( 48 Ltr Capacity ) For Storage Of Around 20 Kg Vegetables ( Side Perforated Type ) Made Of Hdpe 100% Virgin Material As Per Specifications 21 Supply, Installation, Testing And Commissioning Of Hand Pallet Truck With 2500 Kg Lifting Capacity As Per Specification Make - Godrej, Voltas, Mahindra, Jay, Maini ( A ) Load Capacity :2500Mm Fork Length 1100 Mm Nc ) Fork Width : 150 Mm Nd ) Out Side Fork Spread : 550 Mm Ne ) Inside Fork Spread : 250 Mm Nf ) Maximum Fork Height : 185 Mm Ng ) Minimum Fork Height : 75 Mm ) N 22 Supply, Installation, Testing And Commissioning Of Plastic Pallet Of Size : 1200 X 1000 X 150 Mm With 4 Way Entry Hdpe 100% Virgin Material 23 Providing Preventive Maintenance, Repair, Replacement For All Equipment For A Period Of 4 Years After Warranty Period 24 Providing Skilled Manpower In Two Shifts One No. In Each Shift For The Management Of Proposed Cold Room And Ripening Facility. The Agency Will Be Responsible For The Management Of Facility In Terms Of Accounting And Etc For The First Year. 25 Providing Skilled Manpower In Two Shifts One No. In Each Shift For The Management Of Proposed Cold Room And Ripening Facility. The Agency Will Be Resposible For The Management Of Facility In Terms Of Accounting And Etc For The 2Nd Year At The 9.66% Incremental Cost From Previous Year. 26 Providing Skilled Manpower In Two Shifts One No. In Each Shift For The Management Of Proposed Cold Room And Ripening Facility. The Agency Will Be Resposible For The Management Of Facility In Terms Of Accounting And Etc For The 3Rd Year At The 9.66% Incremental Cost From Previous Year. 27 Providing Skilled Manpower In Two Shifts One No. In Each Shift For The Management Of Proposed Cold Room And Ripening Facility. The Agency Will Be Responsible For The Management Of Facility In Terms Of Accounting And Etc For The 4Th Year At The 9.66% Incremental Cost From Previous Year. 28 Providing Skilled Manpower In Two Shifts One No. In Each Shift For The Management Of Proposed Cold Room And Ripening Facility. The Agency Will Be Responsible For The Management Of Facility In Terms Of Accounting And Etc For The 5Th Year At The 9.66% Incremental Cost From Previous Year 29 Providing Skilled Manpower In Two Shifts One No. In Each Shift For The Operation Of Proposed Cold Room And Ripening Facility. The Agency Will Be Responsible For The Operation Of Facility In Terms Of Suitable Technical Manpower And Etc For The First Year. 30 Providing Skilled Manpower In Two Shifts One No. In Each Shift For The Operation Of Proposed Cold Room And Ripening Facility. The Agency Will Be Responsible For The Operation Of Facility In Terms Of Suitable Technical Manpower And Etc For The 2Nd Year At The 9.66% Incremental Cost From Previous Year. 31 Annul Maintenance Contract Of Vapour Heat Treatment Plant, Ro Plant, Cold Stroge 02 No Pre Cold Room 02 No Riping Chamber 01 No Fruit Processing Line Hot Water Dip Treatment Unit Vegetable Processing Line And Electrical Pannel After Guaranttee Period Of 01 Year 32 Providing Skilled Manpower In Two Shifts One No. In Each Shift For The Operation Of Proposed Cold Room And Ripening Facility. The Agency Will Be Responsible For The Operation Of Facility In Terms Of Suitable Technical Manpower And Etc For The 3Rd Year At The 9.66% Incremental Cost From Previous Year. 33 Providing Skilled Manpower In Two Shifts One No. In Each Shift For The Operation Of Proposed Cold Room And Ripening Facility. The Agency Will Be Responsible For The Operation Of Facility In Terms Of Suitable Technical Manpower And Etc For The 4Th Year At The 9.66% Incremental Cost From Previous Year. 34 Providing Skilled Manpower In Two Shifts One No. In Each Shift For The Operation Of Proposed Cold Room And Ripening Facility. The Agency Will Be Responsible For The Operation Of Facility In Terms Of Suitable Technical Manpower And Etc For The 5Th Year At The 9.66% Incremental Cost From Previous Year.

BOQ

Name of Work: ELECTICAL NON SCHEDULE ITEMS COST OF PROPOSED 5 MT RIPENING ROOMS
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11Supply, erection,testing and commissioning of 11KV ,3Ph,50Hz,350 MVA,630 Amps,outdoor type 1 VCB panel H.T.Control panel comprising of 1 VCB fabricated out of 2 mm cold rolled mild steel.metal clad,free standing totally enclosed cubicle type,fully compartmentalised & suitable for operation on 11 KV,3 Phase,50 hz AC earthed system and comprising of the following as per the details spectifications below:\nVCB panel consisting of :\na. 3P vacuum circuit breaker,horizontal drawout,horizontally isolated type, 630 Amps, 350 MVA.11 KV, 26.3 KA with all standard accessories fitted with, shunt trip/closing coil,motor:220V/110V AC motor/hand operated mechnism and operation counter-1no.\nb. Non lockable breaker control (TNC) switch with twistle grip handle and spring return to neutral-1 set.\nc. 3P, Non directional IDMT 30/c, 1 E/F relay with instantaneuous elements MC 31A-1 set.\nd. Resin cast CT's 15/7.5 VA classs 1-3 nos.\ne. Resin cast PT's, 3P,100VA class 1-3nos.\nf. Breaker ON/OFF indication lamps-1 set.\ng. Voltmeter with selector swich-1no.\nh. Ammeter with selector swich-1no.\ni. Aluminium busbar,suitable rating 3 Phase,Air insulated with heat shrinkable sleeves-1set.\nj. Eatrth 25X3 mm Tin coated copper busbar-1set.\nk. Busbar supports resin cast with 33KV dielectric and mechanical strength-1 set.\nBI01010001010000000000000515BI01000011131Nos
22TRANSFORMER\n63 KVA 11KV/433V DYn11 oil emmersed type transformer with off circuit tap links of rating +5% to -5% @2.5%. class of Insulation F with letest ISBI01010001010000000000000515BI01000011131Nos
33Supply, Installation, Testing & Commissioning of indoor type Free standing main LT Panel including 56 KVAR capacitor section with following switch gears:-BI01010001010000000000000515BI01000011141Nos
44Diesel Generator set \nSupply, installation, testing & commissioning of Diesel Generating Set of 40KVA rating Silent Type Radiator type, suitable for of 415V, 3 phase 4 wire, 0.8 pf. (lagging) 50c/s A.C supply complete with engine (1500 RPM) and alternator DG Set controller with accessories including residential type silencer and manual control panel fuel service tank as per standard, battery and battery charger with all associated accessories including MCCB of suitable rating & standard set of tools and anti-vibration mounting pads etc. The specification shall be as per GEM specification attached. The instalation, testing, commissioning shall be done as per GEM.BI01010001010000000000000515BI01000011151set
55Supply of 12\" (300mm) dia (900 rpm) single phase Exhaust fan with louvres complete as required.BI01010001010000000000000515BI01000011161Nos
66Supply of 1200 mm dia ceiling fan complete as required Crompton or equivalent as per approved makes.BI01010001010000000000000515BI01000011181Nos
77Voltage Stabiliser\nSupply, installation, testing, commissioning of Servo motor operated automatic line voltage correctors copper bound indoor type, continuous duty, conforming to IS9815(Part 1)/1994 (Reaffirmed 2009) suitable for Phase voltage of 120-280V. 3 Phase line voltage corrector shall comprise of 3 single phase line voltage correctors conforming to IS 9815 (Part 1)/1994(Reaffirmed 2009), connected in star and enclosed in a single enclosure with common control panel and shall be suitable for unbalanced input voltage. Rate output voltage shall be 240V for single phase LVC and 415V for 3 phase LVC respectively. Rating 63 KVA 3 Phase, 3PH, 50 Hz.\nBI01010001010000000000000515BI01000011191Nos
88Supply and fixing of PUF Insulation panel of thickness of 100 mm, for Cold Room walls & ceiling including Common walls inclusive of all accessories as per specification for 05 Nos of Cold Room with 100 MT capacity (Dimenssion - 16.0x6.1x3.5 mtr) , 04 Nos Ripening Chmber with 10 MT capacity (Dimenssion - 7.5x4.3x3.5). Make - Lloyd insulation, Sintex, Rinac, Jindal, BNAL (PUF Panel Thickness \nCold Room - 100 mm (walls) 100mm (ceiling)\nAnte Chamber - 100mm (walls & ceiling)\nb) Density - 40 +/- 2 Kg/M3\nc) Closed cell content - 90 - 95%\nd) Thermal Conductivity - 0.023 W/mK\ne) Compressive Strength - 2.1 kg/ m2 (at 10% deformation)\nf) Water Vapour Permeability - 0.8 -.12 gms/hr m2\ng) Fire Resistance - Self extinguishing\nh) Blowing Agent - CFC Free\ni) Sheet - 0.5 mm TCT, PPGI)\nBI01010001010000000000000515BI01000011201Nos
99Supply and fixing of Cold Room Floor with, Insulation Material- PUF slab of 100mm thickness( in 2 layers of 50 mm each), Vapour Barrier, inclusive of all accessories as per specification. Make - Lloyd Insulation, Sintex, Rinac, Jindal, BNAL, Industrial Foam. (a) Insulation Material - PUF slabb) Density - 40 +/- 2 Kg/M3c) No. of Layers - 2 layers ( 40 mm each)d) Total Thickness - 80 mme) Vapor Barrier - Tarfelt, Polythene Sheet as per dwgf) VDF floor - VDF as per dwg)BI01010001010000000000000515BI01000011211Nos
1010Supply and Installation of Cold Room Doors (for positive temp) insulated type of Horizontal Manual Sliding Door, Dimensions -1500 mm x 2100mm ( clear) with Sandwich panels constructed of a core of 80 mm PUF complete with all accessories as per specification Make - Metaflex, lloyd insulation, Rinac, Hormann, Gandhi Automation (a) Type of Door - Manual Sliding Door\nb) Dimensions - 1500 X 2100MM\nc) Type of panel - Sandwich panels constructed of a core of 100 mm\nPUF on both sides covered with 0.6 mm galvanized steel plate finished with 20mucoating. The panels are supplied with thermal bridge-free PVC surrounding profiles\nd) Sealing - All round with triple rubber profile\ne) Colour outside - RAL 9002 (white)\nf) Colour inside - Standard colour RAL 9002 (white/grey)\ng) Hardware - Galvanised Steel\nh) Track Rail - Drop/Lift rail system\ni) Finish of opening - To be Included\nj) Door Operation - Manual)\nBI01010001010000000000000515BI01000011211Nos
1111Supply, Installation, Testing, Commissioning of Refrigeration System of suitable capacity (reference capacity 10.00 kw for each room) complete with all spares as per specification for each of 4 nos ripening rooms. Make - Carrier, Rinac, Blue Star, Voltas (1. DESIGN TEMP: EVAPORATION -5 DEG C, CONDENSING 53.5 DEG C 2. COMPRESSOR – SCROLL ( 1 PER RIPENING ROOM) 3. AIR COOLED CONDENSER, AIR VOLUME 4500 M3/HR, 10 FINS/INCH, 1 AXIAL FAN TO BE CONTROLLED BY THERMOSTATIC CONTROL UNIT WITH OUTSIDE TEMP SENSING ARRANGEMENT . TYPICAL DIMENSIONS : 1000MM (LENGTH) X 837MM (HEIGHT) X 672MM (DEPTH) (MAKES- CARRIER, BITZER, BOCK, FRASCOLD) 4. DUAL DISCHARGE COOLER OF CAPACITY 11KW ( 1 PER RIPENING ROOM. WITH 5 AXIAL FANS OF 450MM, AIR VOLUME 5250 M3/HR, FIN SPACING 5 FIN/ SQ. INCH TYPICAL DIMENSIONS : 2500MM (LENGTH) HEIGHT OF INDIVIDUAL COIL 325MM (MAKES – LUVE, ALFA LAVAL, GUNTNER, STAR COOLERS) 5. VENTILATION FAN 15”, 6. CONTROLS , DRYER, THERMOSTAT, THERMOSTATIC EXPANSION VALVE, SOLENOID VALVE, VALVE, SIGHT GLASS 7. SENSORS & ALLIED EQUIPMENT PER ROOM -ETHYLENE SENSOR (1), CO2 SENSOR (1), PULP TEMPERATURE (1 ), VENTILATION SYSTEM CONNECTED TO DAMPER & VENTILATION FAN (1 EACH) 8. PIPING – SUCTION 11/8” AND LIQUID LINE ½” WITH INSULATION 9. CONTROL PANEL FOR EACH ROOM AT REAR SIDE OF RIPENING ROOM 10. CONTROL PANEL (PLC CONTROL TYPE) TO HAVE FOLLOWING FEATURES – STARTING ARRANGEMENT FOR COMPRESSOR (HP/LP/OP CUT OUT FOR EACH COMPRESSOR) CONTRACTOR FOR CONDENSER FAN, THERMOSTATIC CONTROLLER FROM DANFOSS FOR CONTROLLING THE FAN, CRANKCASE HEATER TO OPERATE WHEN COMPRESSOR IS STOPPED AND OFF WHEN RUNNING. LIGHTING MAIN SWITCH ALSO IN THE PANEL. THIS WILL HAVE ALL STARTERS WITH INTERLOCKING SYSTEM. PUSH BUTTONS FOR START/ STOP. HUMIDIFIER & ETHYLENE GENERATOR SWITCHES ALSO IN THE PANEL. OVERLOAD RELAYS & FUSES & NAME PLATES)\n\nBI01010001010000000000000515BI01000011211Nos
1212Supply, Installation, Testing & Commissioning of Ultrasonic type humidification system in all Ripening rooms with automated controls capable of providing 90 - 95% RH in each Ripening room to ensure uniform humidity in the room, system should be complete with RH control sensor and digital display for monitoring and control of RH in each room, complete with all connections in all rooms as per specification - The humidification system offered should be Ultrasonic type humidification system in all Ripening rooms with automated controls capable of providing 90 - 95% RH in each room to ensure uniform humidity in the room, system should be complete with RH control sensor and digital display for monitoring and control of RH in each room, , complete with all connections in all rooms as per specification.BI01010001010000000000000515BI01000011211Nos
1313Supply, Installation, Testing and Commissioning of Portable Ethylene Generator connected to an electrical plug point inside the room, the Ethylene Generator should be suitable for providing suitable levels of ethylene (as per the fruit category) in ripening rooms of volume around 60 cum by catalytic dehydration of developing liquid into ethylene gas complete with suitable developing liquid required for commercial ripening applications for each of the ripening rooms as per specification alongwith 5 ltr of developing liquid ethylene with each generator. Make- Aseko, Catalytic, American Ripener (The provision for Ethylene Gas dosage for ripening in each room shall be by placing a Portable Ethylene Generator connected to an electrical plug point inside the room. The Ethylene Generator should be suitable for providing suitable levels of ethylene (as per the fruit category) in ripening rooms of volume around 58 cum by catalytic dehydration of developing liquid into ethylene gas complete with suitable developing liquid required for commercial ripening applications.)BI01010001010000000000000515BI01000011211Nos
1414Supply, Installation, Testing and Commissioning of Ethylene Gas sensor complete with display in all 4 Ripening Rooms of catalytic type with measuring range upto 2000 ppm for ripening room application as per specification. Make- Aseko, CarelBI01010001010000000000000515BI01000011211Nos
1515Supply, Installation, Testing and Commissioning of CO2 gas sensors complete with display in all 4 Ripening Rooms of infrared type with measuring range 0 – 5% suitable for ripening application as per specification. Make- Aseko, CarelBI01010001010000000000000515BI01000011211Nos
1616Supply, Installation, Testing and Commissioning of Air Ventilation Systems connected with gas control system for all Ripening Rooms suitable for ripening application as per specificationBI01010001010000000000000515BI01000011211Nos
1717Supply, Installation, Testing and Commissioning of Ripening Controller system sensors for integration and control of all ripening activities suitable for minimum 4 ripening rooms with display & all accessories (Make: Aseko, Interko, Felix)BI01010001010000000000000515BI01000011211Nos
1818Supply and fixing of PUF Insulation panel of thickness of 40 mm having Density 40 kg/cu.m (+/- 2), 0.5 mm thick PPGI sheet, thermal conductivity [ 0.023 W/mK], for ceiling at loading, unloading and Admin area (3.5 mtr. Hight from floor level) inclusive of all accessories and installation as per specification. Make - Lloyd Insulation, Sintex, Rinac, JindalBI01010001010000000000000515BI01000011211Nos
1919Supply, Installation, Testing and Commissioning of Platform weighscale of electronic digital type of 200 kg capacity as per specifications Make - Kantawala, Swastik, Dewlite, Avery (a) Capacity 200 Kg\nb) Pan Size & MOC 400mm X 500mm minimum (of SS) for 200 kg\ne) Least Count 20 gm maximum for 200 kg \nh) 100% Tare through Keyboard\ni) Stamping to be provided)BI01010001010000000000000515BI01000011211Nos
2020Supply, Installation, Testing and Commissioning of Plastic crates of outer dimensions 540mm x 360mm x 290mm (48 ltr capacity) for storage of around 20 kg vegetables (side perforated type) made of HDPE 100% virgin material as per specificationsBI01010001010000000000000515BI01000011211Nos
2121Supply, Installation, Testing and Commissioning of hand pallet truck with 2500 kg lifting capacity as per specification Make - Godrej, Voltas, Mahindra, Jay, Maini (a) Load Capacity :2500mm Fork Length 1100 mm\nc) Fork Width : 150 mm\nd) Out Side Fork Spread : 550 mm\ne) Inside Fork Spread : 250 mm\nf) Maximum Fork Height : 185 mm\ng) Minimum Fork Height : 75 mm)\nBI01010001010000000000000515BI01000011211Nos
2222Supply, Installation, Testing and Commissioning of Plastic Pallet of size : 1200 x 1000 x 150 mm with 4 way entry HDPE 100% virgin materialBI01010001010000000000000515BI01000011211Nos
2323Providing preventive maintenance, repair, replacement for all equipment for a period of 4 years after warranty periodBI01010001010000000000000515BI01000011211Nos
2424Providing skilled manpower in two shifts one no. in each shift for the Management of proposed cold room and ripening facility. The agency will be responsible for the management of facility in terms of accounting and etc for the first year.BI01010001010000000000000515BI01000011211Nos
2525Providing skilled manpower in two shifts one no. in each shift for the Management of proposed cold room and ripening facility. The agency will be resposible for the management of facility in terms of accounting and etc for the 2nd year at the 9.66% incremental cost from previous year.BI01010001010000000000000515BI01000011211Nos
2626Providing skilled manpower in two shifts one no. in each shift for the Management of proposed cold room and ripening facility. The agency will be resposible for the management of facility in terms of accounting and etc for the 3rd year at the 9.66% incremental cost from previous year.BI01010001010000000000000515BI01000011211Nos
2727Providing skilled manpower in two shifts one no. in each shift for the Management of proposed cold room and ripening facility. The agency will be responsible for the management of facility in terms of accounting and etc for the 4th year at the 9.66% incremental cost from previous year.BI01010001010000000000000515BI01000011211Nos
2828Providing skilled manpower in two shifts one no. in each shift for the Management of proposed cold room and ripening facility. The agency will be responsible for the management of facility in terms of accounting and etc for the 5th year at the 9.66% incremental cost from previous yearBI01010001010000000000000515BI01000011211Nos
2929Providing skilled manpower in two shifts one no. in each shift for the Operation of proposed cold room and ripening facility. The agency will be responsible for the Operation of facility in terms of suitable Technical manpower and etc for the first year.BI01010001010000000000000515BI01000011211Nos
3030Providing skilled manpower in two shifts one no. in each shift for the Operation of proposed cold room and ripening facility. The agency will be responsible for the Operation of facility in terms of suitable Technical manpower and etc for the 2nd year at the 9.66% incremental cost from previous year.BI01010001010000000000000515BI01000011211Nos
3131Annul maintenance contract of vapour heat treatment plant, RO plant, cold stroge 02 no pre cold room 02 no riping chamber 01 no fruit processing line hot water dip treatment unit vegetable processing line and electrical pannel after guaranttee period of 01 yearBI01010001010000000000000515BI01000011211Nos
3232Providing skilled manpower in two shifts one no. in each shift for the Operation of proposed cold room and ripening facility. The agency will be responsible for the Operation of facility in terms of suitable Technical manpower and etc for the 3rd year at the 9.66% incremental cost from previous year.BI01010001010000000000000515BI01000011211Nos
3333Providing skilled manpower in two shifts one no. in each shift for the Operation of proposed cold room and ripening facility. The agency will be responsible for the Operation of facility in terms of suitable Technical manpower and etc for the 4th year at the 9.66% incremental cost from previous year.BI01010001010000000000000515BI01000011211Nos
3434Providing skilled manpower in two shifts one no. in each shift for the Operation of proposed cold room and ripening facility. The agency will be responsible for the Operation of facility in terms of suitable Technical manpower and etc for the 5th year at the 9.66% incremental cost from previous year.BI01010001010000000000000515BI01000011211Nos

AI Tender Summary

OUR REF NO 27184335
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 16-03-2021
Authority
Authority Name Rajya Krishi Utpadan Mandi Parishad
Work Description Tender For Electrical Non Schedule Items Cost Of Proposed 5 Mt Ripening Rooms - 1 Supply, Erection, Testing And Commissioning Of 11Kv , 3Ph, 50Hz, 350 Mva, 630 Amps, Outdoor Type 1 Vcb Panel H.T.Control Panel Comprising Of 1 Vcb Fabricated Out Of 2 Mm Cold Rolled Mild Steel.Metal Clad, Free Standing Totally Enclosed Cubicle Type, Fully Compartmentalised & Suitable For Operation On 11 Kv, 3 Phase, 50 Hz Ac Earthed System And Comprising Of The Following As Per The Details Spectifications Below: Nvcb Panel Consisting Of : Na. 3P Vacuum Circuit Breaker, Horizontal Drawout, Horizontally Isolated Type, 630 Amps, 350 Mva.11 Kv, 26.3 Ka With All Standard Accessories Fitted With, Shunt Trip / Closing Coil, Motor:220V / 110V Ac Motor / Hand Operated Mechnism And Operation Counter-1No. Nb. Non Lockable Breaker Control ( Tnc ) Switch With Twistle Grip Handle And Spring Return To Neutral-1 Set. Nc. 3P, Non Directional Idmt 30 / C, 1 E / F Relay With Instantaneuous Elements Mc 31A-1 Set. Nd. Resin Cast Cts 15 / 7.5 Va Classs 1-3 Nos. Ne. Resin Cast Pts, 3P, 100Va Class 1-3Nos. Nf. Breaker On / Off Indication Lamps-1 Set. Ng. Voltmeter With Selector Swich-1No. Nh. Ammeter With Selector Swich-1No. Ni. Aluminium Busbar, Suitable Rating 3 Phase, Air Insulated With Heat Shrinkable Sleeves-1Set. Nj. Eatrth 25X3 Mm Tin Coated Copper Busbar-1Set. Nk. Busbar Supports Resin Cast With 33Kv Dielectric And Mechanical Strength-1 Set. N 2 Transformer N63 Kva 11Kv / 433V Dyn11 Oil Emmersed Type Transformer With Off Circuit Tap Links Of Rating +5% To -5% @2.5%. Class Of Insulation F With Letest Is 3 Supply, Installation, Testing & Commissioning Of Indoor Type Free Standing Main Lt Panel Including 56 Kvar Capacitor Section With Following Switch Gears:- 4 Diesel Generator Set Nsupply, Installation, Testing & Commissioning Of Diesel Generating Set Of 40Kva Rating Silent Type Radiator Type, Suitable For Of 415V, 3 Phase 4 Wire, 0.8 Pf. ( Lagging ) 50C / S A.C Supply Complete With Engine ( 1500 Rpm ) And Alternator Dg Set Controller With Accessories Including Residential Type Silencer And Manual Control Panel Fuel Service Tank As Per Standard, Battery And Battery Charger With All Associated Accessories Including Mccb Of Suitable Rating & Standard Set Of Tools And Anti-Vibration Mounting Pads Etc. The Specification Shall Be As Per Gem Specification Attached. The Instalation, Testing, Commissioning Shall Be Done As Per Gem. 5 Supply Of 12 ( 300Mm ) Dia ( 900 Rpm ) Single Phase Exhaust Fan With Louvres Complete As Required. 6 Supply Of 1200 Mm Dia Ceiling Fan Complete As Required Crompton Or Equivalent As Per Approved Makes. 7 Voltage Stabiliser Nsupply, Installation, Testing, Commissioning Of Servo Motor Operated Automatic Line Voltage Correctors Copper Bound Indoor Type, Continuous Duty, Conforming To Is9815 ( Part 1 ) / 1994 ( Reaffirmed 2009 ) Suitable For Phase Voltage Of 120-280V. 3 Phase Line Voltage Corrector Shall Comprise Of 3 Single Phase Line Voltage Correctors Conforming To Is 9815 ( Part 1 ) / 1994 ( Reaffirmed 2009 ) , Connected In Star And Enclosed In A Single Enclosure With Common Control Panel And Shall Be Suitable For Unbalanced Input Voltage. Rate Output Voltage Shall Be 240V For Single Phase Lvc And 415V For 3 Phase Lvc Respectively. Rating 63 Kva 3 Phase, 3Ph, 50 Hz. N 8 Supply And Fixing Of Puf Insulation Panel Of Thickness Of 100 Mm, For Cold Room Walls & Ceiling Including Common Walls Inclusive Of All Accessories As Per Specification For 05 Nos Of Cold Room With 100 Mt Capacity ( Dimenssion - 16.0X6.1X3.5 Mtr ) , 04 Nos Ripening Chmber With 10 Mt Capacity ( Dimenssion - 7.5X4.3X3.5 ) . Make - Lloyd Insulation, Sintex, Rinac, Jindal, Bnal ( Puf Panel Thickness Ncold Room - 100 Mm ( Walls ) 100Mm ( Ceiling ) Nante Chamber - 100Mm ( Walls & Ceiling ) Nb ) Density - 40 + / - 2 Kg / M3 Nc ) Closed Cell Content - 90 - 95% Nd ) Thermal Conductivity - 0.023 W / Mk Ne ) Compressive Strength - 2.1 Kg / M2 ( At 10% Deformation ) Nf ) Water Vapour Permeability - 0.8 -.12 Gms / Hr M2 Ng ) Fire Resistance - Self Extinguishing Nh ) Blowing Agent - Cfc Free Ni ) Sheet - 0.5 Mm Tct, Ppgi ) N 9 Supply And Fixing Of Cold Room Floor With, Insulation Material- Puf Slab Of 100Mm Thickness ( In 2 Layers Of 50 Mm Each ) , Vapour Barrier, Inclusive Of All Accessories As Per Specification. Make - Lloyd Insulation, Sintex, Rinac, Jindal, Bnal, Industrial Foam. ( A ) Insulation Material - Puf Slabb ) Density - 40 + / - 2 Kg / M3c ) No. Of Layers - 2 Layers ( 40 Mm Each ) D ) Total Thickness - 80 Mme ) Vapor Barrier - Tarfelt, Polythene Sheet As Per Dwgf ) Vdf Floor - Vdf As Per Dwg ) 10 Supply And Installation Of Cold Room Doors ( For Positive Temp ) Insulated Type Of Horizontal Manual Sliding Door, Dimensions -1500 Mm X 2100Mm ( Clear ) With Sandwich Panels Constructed Of A Core Of 80 Mm Puf Complete With All Accessories As Per Specification Make - Metaflex, Lloyd Insulation, Rinac, Hormann, Gandhi Automation ( A ) Type Of Door - Manual Sliding Door Nb ) Dimensions - 1500 X 2100Mm Nc ) Type Of Panel - Sandwich Panels Constructed Of A Core Of 100 Mm Npuf On Both Sides Covered With 0.6 Mm Galvanized Steel Plate Finished With 20Mucoating. The Panels Are Supplied With Thermal Bridge-Free Pvc Surrounding Profiles Nd ) Sealing - All Round With Triple Rubber Profile Ne ) Colour Outside - Ral 9002 ( White ) Nf ) Colour Inside - Standard Colour Ral 9002 ( White / Grey ) Ng ) Hardware - Galvanised Steel Nh ) Track Rail - Drop / Lift Rail System Ni ) Finish Of Opening - To Be Included Nj ) Door Operation - Manual ) N 11 Supply, Installation, Testing, Commissioning Of Refrigeration System Of Suitable Capacity ( Reference Capacity 10.00 Kw For Each Room ) Complete With All Spares As Per Specification For Each Of 4 Nos Ripening Rooms. Make - Carrier, Rinac, Blue Star, Voltas ( 1. Design Temp: Evaporation -5 Deg C, Condensing 53.5 Deg C 2. Compressor – Scroll ( 1 Per Ripening Room ) 3. Air Cooled Condenser, Air Volume 4500 M3 / Hr, 10 Fins / Inch, 1 Axial Fan To Be Controlled By Thermostatic Control Unit With Outside Temp Sensing Arrangement . Typical Dimensions : 1000Mm ( Length ) X 837Mm ( Height ) X 672Mm ( Depth ) ( Makes- Carrier, Bitzer, Bock, Frascold ) 4. Dual Discharge Cooler Of Capacity 11Kw ( 1 Per Ripening Room. With 5 Axial Fans Of 450Mm, Air Volume 5250 M3 / Hr, Fin Spacing 5 Fin / Sq. Inch Typical Dimensions : 2500Mm ( Length ) Height Of Individual Coil 325Mm ( Makes – Luve, Alfa Laval, Guntner, Star Coolers ) 5. Ventilation Fan 15”, 6. Controls , Dryer, Thermostat, Thermostatic Expansion Valve, Solenoid Valve, Valve, Sight Glass 7. Sensors & Allied Equipment Per Room -Ethylene Sensor ( 1 ) , Co2 Sensor ( 1 ) , Pulp Temperature ( 1 ) , Ventilation System Connected To Damper & Ventilation Fan ( 1 Each ) 8. Piping – Suction 11 / 8” And Liquid Line ½” With Insulation 9. Control Panel For Each Room At Rear Side Of Ripening Room 10. Control Panel ( Plc Control Type ) To Have Following Features – Starting Arrangement For Compressor ( Hp / Lp / Op Cut Out For Each Compressor ) Contractor For Condenser Fan, Thermostatic Controller From Danfoss For Controlling The Fan, Crankcase Heater To Operate When Compressor Is Stopped And Off When Running. Lighting Main Switch Also In The Panel. This Will Have All Starters With Interlocking System. Push Buttons For Start / Stop. Humidifier & Ethylene Generator Switches Also In The Panel. Overload Relays & Fuses & Name Plates ) N N 12 Supply, Installation, Testing & Commissioning Of Ultrasonic Type Humidification System In All Ripening Rooms With Automated Controls Capable Of Providing 90 - 95% Rh In Each Ripening Room To Ensure Uniform Humidity In The Room, System Should Be Complete With Rh Control Sensor And Digital Display For Monitoring And Control Of Rh In Each Room, Complete With All Connections In All Rooms As Per Specification - The Humidification System Offered Should Be Ultrasonic Type Humidification System In All Ripening Rooms With Automated Controls Capable Of Providing 90 - 95% Rh In Each Room To Ensure Uniform Humidity In The Room, System Should Be Complete With Rh Control Sensor And Digital Display For Monitoring And Control Of Rh In Each Room, , Complete With All Connections In All Rooms As Per Specification. 13 Supply, Installation, Testing And Commissioning Of Portable Ethylene Generator Connected To An Electrical Plug Point Inside The Room, The Ethylene Generator Should Be Suitable For Providing Suitable Levels Of Ethylene ( As Per The Fruit Category ) In Ripening Rooms Of Volume Around 60 Cum By Catalytic Dehydration Of Developing Liquid Into Ethylene Gas Complete With Suitable Developing Liquid Required For Commercial Ripening Applications For Each Of The Ripening Rooms As Per Specification Alongwith 5 Ltr Of Developing Liquid Ethylene With Each Generator. Make- Aseko, Catalytic, American Ripener ( The Provision For Ethylene Gas Dosage For Ripening In Each Room Shall Be By Placing A Portable Ethylene Generator Connected To An Electrical Plug Point Inside The Room. The Ethylene Generator Should Be Suitable For Providing Suitable Levels Of Ethylene ( As Per The Fruit Category ) In Ripening Rooms Of Volume Around 58 Cum By Catalytic Dehydration Of Developing Liquid Into Ethylene Gas Complete With Suitable Developing Liquid Required For Commercial Ripening Applications. ) 14 Supply, Installation, Testing And Commissioning Of Ethylene Gas Sensor Complete With Display In All 4 Ripening Rooms Of Catalytic Type With Measuring Range Upto 2000 Ppm For Ripening Room Application As Per Specification. Make- Aseko, Carel 15 Supply, Installation, Testing And Commissioning Of Co2 Gas Sensors Complete With Display In All 4 Ripening Rooms Of Infrared Type With Measuring Range 0 – 5% Suitable For Ripening Application As Per Specification. Make- Aseko, Carel 16 Supply, Installation, Testing And Commissioning Of Air Ventilation Systems Connected With Gas Control System For All Ripening Rooms Suitable For Ripening Application As Per Specification 17 Supply, Installation, Testing And Commissioning Of Ripening Controller System Sensors For Integration And Control Of All Ripening Activities Suitable For Minimum 4 Ripening Rooms With Display & All Accessories ( Make: Aseko, Interko, Felix ) 18 Supply And Fixing Of Puf Insulation Panel Of Thickness Of 40 Mm Having Density 40 Kg / Cu.M ( + / - 2 ) , 0.5 Mm Thick Ppgi Sheet, Thermal Conductivity [ 0.023 W / Mk ] , For Ceiling At Loading, Unloading And Admin Area ( 3.5 Mtr. Hight From Floor Level ) Inclusive Of All Accessories And Installation As Per Specification. Make - Lloyd Insulation, Sintex, Rinac, Jindal 19 Supply, Installation, Testing And Commissioning Of Platform Weighscale Of Electronic Digital Type Of 200 Kg Capacity As Per Specifications Make - Kantawala, Swastik, Dewlite, Avery ( A ) Capacity 200 Kg Nb ) Pan Size & Moc 400Mm X 500Mm Minimum ( Of Ss ) For 200 Kg Ne ) Least Count 20 Gm Maximum For 200 Kg Nh ) 100% Tare Through Keyboard Ni ) Stamping To Be Provided ) 20 Supply, Installation, Testing And Commissioning Of Plastic Crates Of Outer Dimensions 540Mm X 360Mm X 290Mm ( 48 Ltr Capacity ) For Storage Of Around 20 Kg Vegetables ( Side Perforated Type ) Made Of Hdpe 100% Virgin Material As Per Specifications 21 Supply, Installation, Testing And Commissioning Of Hand Pallet Truck With 2500 Kg Lifting Capacity As Per Specification Make - Godrej, Voltas, Mahindra, Jay, Maini ( A ) Load Capacity :2500Mm Fork Length 1100 Mm Nc ) Fork Width : 150 Mm Nd ) Out Side Fork Spread : 550 Mm Ne ) Inside Fork Spread : 250 Mm Nf ) Maximum Fork Height : 185 Mm Ng ) Minimum Fork Height : 75 Mm ) N 22 Supply, Installation, Testing And Commissioning Of Plastic Pallet Of Size : 1200 X 1000 X 150 Mm With 4 Way Entry Hdpe 100% Virgin Material 23 Providing Preventive Maintenance, Repair, Replacement For All Equipment For A Period Of 4 Years After Warranty Period 24 Providing Skilled Manpower In Two Shifts One No. In Each Shift For The Management Of Proposed Cold Room And Ripening Facility. The Agency Will Be Responsible For The Management Of Facility In Terms Of Accounting And Etc For The First Year. 25 Providing Skilled Manpower In Two Shifts One No. In Each Shift For The Management Of Proposed Cold Room And Ripening Facility. The Agency Will Be Resposible For The Management Of Facility In Terms Of Accounting And Etc For The 2Nd Year At The 9.66% Incremental Cost From Previous Year. 26 Providing Skilled Manpower In Two Shifts One No. In Each Shift For The Management Of Proposed Cold Room And Ripening Facility. The Agency Will Be Resposible For The Management Of Facility In Terms Of Accounting And Etc For The 3Rd Year At The 9.66% Incremental Cost From Previous Year. 27 Providing Skilled Manpower In Two Shifts One No. In Each Shift For The Management Of Proposed Cold Room And Ripening Facility. The Agency Will Be Responsible For The Management Of Facility In Terms Of Accounting And Etc For The 4Th Year At The 9.66% Incremental Cost From Previous Year. 28 Providing Skilled Manpower In Two Shifts One No. In Each Shift For The Management Of Proposed Cold Room And Ripening Facility. The Agency Will Be Responsible For The Management Of Facility In Terms Of Accounting And Etc For The 5Th Year At The 9.66% Incremental Cost From Previous Year 29 Providing Skilled Manpower In Two Shifts One No. In Each Shift For The Operation Of Proposed Cold Room And Ripening Facility. The Agency Will Be Responsible For The Operation Of Facility In Terms Of Suitable Technical Manpower And Etc For The First Year. 30 Providing Skilled Manpower In Two Shifts One No. In Each Shift For The Operation Of Proposed Cold Room And Ripening Facility. The Agency Will Be Responsible For The Operation Of Facility In Terms Of Suitable Technical Manpower And Etc For The 2Nd Year At The 9.66% Incremental Cost From Previous Year. 31 Annul Maintenance Contract Of Vapour Heat Treatment Plant, Ro Plant, Cold Stroge 02 No Pre Cold Room 02 No Riping Chamber 01 No Fruit Processing Line Hot Water Dip Treatment Unit Vegetable Processing Line And Electrical Pannel After Guaranttee Period Of 01 Year 32 Providing Skilled Manpower In Two Shifts One No. In Each Shift For The Operation Of Proposed Cold Room And Ripening Facility. The Agency Will Be Responsible For The Operation Of Facility In Terms Of Suitable Technical Manpower And Etc For The 3Rd Year At The 9.66% Incremental Cost From Previous Year. 33 Providing Skilled Manpower In Two Shifts One No. In Each Shift For The Operation Of Proposed Cold Room And Ripening Facility. The Agency Will Be Responsible For The Operation Of Facility In Terms Of Suitable Technical Manpower And Etc For The 4Th Year At The 9.66% Incremental Cost From Previous Year. 34 Providing Skilled Manpower In Two Shifts One No. In Each Shift For The Operation Of Proposed Cold Room And Ripening Facility. The Agency Will Be Responsible For The Operation Of Facility In Terms Of Suitable Technical Manpower And Etc For The 5Th Year At The 9.66% Incremental Cost From Previous Year.
Basic Detail
Tender No 64/2021/711
Bidding Type Tender
Location
City DDEM PRAYAGRAJ
State Uttar Pradesh
Key Dates
Publish Date 01 Mar 2021
Submission Date 16 Mar 2021
Open Date 16 Mar 2021
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
8F1E4CAA-BD92-4C23-B196-AC9087DBA4A8.html
Tendernotice_1.pdf
BOQ_856984.xls

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Mar 01, 2021
11:30 IST

Tender Published

Tender notice published.

Completed
Mar 16, 2021
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Mar 16, 2021

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

8F1E4CAA-BD92-4C23-B196-AC9087DBA4A8.html

pdf

Tendernotice_1.pdf

xls

BOQ_856984.xls

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders