Guniting The Damaged Rcc Structures In Nas Plant In Fertiliser Division At Fact Uc ., UDYOGAMNDAL-Kerala

Fertilisers And Chemicals Travancore Limited has published Guniting The Damaged Rcc Structures In Nas Plant In Fertiliser Division At Fact Uc .. Submission Date for this Tender is 15-03-2021. Structural Work Tenders in UDYOGAMNDAL Kerala. Bidders can get complete Tender details and download the document.




Tender Notice

27181289
Guniting The Damaged Rcc Structures In Nas Plant In Fertiliser Division At Fact Uc .
Open Tender
Indian
Kerala
UDYOGAMNDAL
15-03-2021

Tender Details

Guniting The Damaged Rcc Structures In Nas Plant In Fertiliser Division At Fact Uc .

Key Value

Document Fees
INR 50 /-
EMD
INR 12000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Guniting the damaged RCC Structures in NAS Plant in Fertiliser Division at FACT UC
Sl. No. ITEM DESCRIPTION. Item Code / Make QUANTITY UNITS
1 1 Guniting the damaged RCC Structures in NAS Plant in Fertiliser Division at FACT UC\n\n\n
2 1.01 Guniting the RCC/masonry structures after chipping the existing surfaces, removing the scales in the rusted rods , cleaning the surface with air and water under pressure, providing one layer 50 x 50 x 3mm (or nearest) weld mesh fabric as reinforcement and guniting with cement mortar 1:3 (one part of cement and 3 parts of sand) for an average thickness of 40mm including Providing scaffolding with all necessary materials, levelling the top surfaces ,finishing, curing and all other incidental charges etc. complete. The waste materials should be collected and disposed at places pointed out daily. The cost is inclusive of all materials like sand, weld mesh, hire for compressor gun, fuel/diesel, labour, scaffolding, curing etc. but excluding cost of cement (cement alone will be issued free of cost by the company at our stores.) Utmost care should be taken for controlling the consumption of cement. Recovery at doubel the issue rate will be effected on the cement consumed excess of the approved requirement.\n\n item1 200 M2
3 1.02 Guniting the existing concrete/masonry surfaces after chipping, removing the scales in the rusted rods , cleaning the surface by air and water under pressure with cement mortar 1:3 (one part of cement and 3 parts of sand) for an average thickness of 15mm including levelling the top surfaces finishing, curing and all other incidental charges etc. complete including providing scaffolding with all necessary materials, . The waste materials should be collected and disposed at places pointed out daily. The cost is inclusive of all materials like sand, hire for compressor gun, fuel/diesel, labour, scaffolding, curing etc. but excluding cost of cement (cement alone will be issued free of cost by the company at our stores. Utmost care should be taken for controlling the co sumption of cement. Recovery at double the issue rate will be effected on the cement consumed excess of the approved requirement.\n\n 60 M2
4 1.03 Cleaning the exposed surfaces of reinforcement bars embedded in the concrete at different heights with wire brush and applying two coats of epoxy zinc rich primer equivalent to Nitozinc primer as per instruction ( Payment will be made only for the treated surface area of reinforcement bars.) item3 10 M2
5 1.04 Chipping and removing portions of existing RCC work carefully without damaging the remaining structure and removing the debris at places pointed outwithin a distance of 150M and reclaiming the steel reinforcement and stacking the same at places as per instructions. item4 8 M3
6 1.05 Providing anti corrosive coatings to the gunited surfaces at all heights consisting of first coat with "Pro Epishield Floor Sealer" & second coat with "EPILUX 950 SUPER HIBUILD" of Berger or any other equivalent of approved quality and colour after cleaning the surface thoroughly by removing all loose particles ,dust etc. including cost of all materials labour charges scaffolding, removal of waste materials etc. Each coat should have distinctive colour shades to ensure that the entire surface is covered under each coat. Allow sufficient drying period in between coats as recommended by the manufacturer.\n item5 200 M2
7 1.06 Supplying, fabricating,and fixing reinforcement to RCC works at all levels with High strength deformed TMT bars of Fe 500 grade conforming to IS 1786 including all charges for uncoiling and straightening rods, cutting rods, bending cold, placing in position and tying with black annealed steel wire of 16 SWG, etc.complete.INCLUDING COST OF STEEL (The reinforcement steel shall be of M/s.RINL/SAIL/TISCO) item6 0.5 Qtl
8 1.07 Demolishing and removing old cement plaster and disposal of the debris at places pointed out within a distance of 150M. item7 60 M2
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail