| 1 | 1 | Road Portion | | | |
|---|
| 2 | 1.01 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD . including contractors profit & Over head charges, but excluding GST etc., complete. | | 27510 | Sqm |
|---|
| 3 | 1.02 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with all lifts and lead upto 1000 m as per Technical Specification Clause 501.2.2 of MORD including contractors profit & Over head charges, but excluding GST etc., complete. | | 18937.5 | Sqm |
|---|
| 4 | 1.03 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including breaking clods, ramming, spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete. | | 11663.7 | Cum |
|---|
| 5 | 1.04 | Construction of embankment with approved material obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete. | | 6000 | Cum |
|---|
| 6 | 1.05 | Construction of Shoulders by providing selected earth having minimum CBR of 10%, MDD not less than 1.85 g/cc with LL & PI not more than 40% and 20 respectively and spreading in uniform layers with tractor grader on prepared surface, and compacted at OMC with vibratory roller 80-100 kN to meet requirement as per Technical Specification Clause 303 & 407 MORD, by using machinery including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete. | | 1310 | Cum |
|---|
| 7 | 1.06 | Providing, laying, spreading and compacting graded stone aggregate [HBG] to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete | | 3223.12 | Cum |
|---|
| 8 | 1.07 | Providing and laying bituminous macadam with 40-60 TPH hot mix plant using crushed aggregates [HBG] of grading as per Table 500.4 premixed with bituminous binder @ 3.3% by weight of mix, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieved the desired compaction as per Technical Specification Clause 504 MORD (using vibratory Roller 80-100 KN for intermediate rolling and 3 wheel roller 80-100 KN for initial and final rolling) including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete | | 946.89 | cum |
|---|
| 9 | 1.08 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM) ,including contractors profit & Over head charges, but excluding GST etc., complete for Prime Coat | | 18937.5 | Sqm |
|---|
| 10 | 1.09 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD, including contractors profit & Over head charges, but excluding GST etc., complete for Tack Coat | | 18937.5 | Sqm |
|---|
| 11 | 1.1 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates [HBG] (Table 500.9) either using viscous grade bitumen VG30 grade at the rate of 14.6 kg/10 sqm to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a Hot Mix plant of 30-40TPH, laying and rolling with a three wheel 0-100 kN static roller capacity, paver finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C including cost and conveyance of all materials from approved sources, , labour charges and hire and operational charges of power road roller and all other machinery, tools and plants, providing barricading for diversion of traffic, erecting red flags other incidental and operational charges etc., complete for finished item of work as per clause 506 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete | | 18937.5 | Sqm |
|---|
| 12 | 1.11 | Providing and laying bituminous premixed Seal coat (Type B) comprising of a thin application of fine aggregate premixed with bituminous binder; Crushed sand defined as passing through 2.36 mm sieve and retained on 180 micron seive applied @ 0.06 cum per 10 sqm.to be laid simultaneously along with the bitumunous course using 6.80 kgs of bitumen VG30 grade for 10 sqm and rolling with power roller including of required line, level, grade to serve as wearing course on previously prepared surface and finishing to rquired level and grades including cost and conveyance of all materials from approved sources and stacking at site to departmental gauge for premeasurements, seigniorage, labour charges and hire and operational charges of power road roller 8 to 10 tonnes capacity and all other machinery, tools and plants, providing barricading for diversion of traffic, erecting red flags other incidental and operational charges etc., complete for finished item of work as per technical specification clause 508 of MORD Using Hot mix plant including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete. (by Mechanical means) | | 18937.5 | Sqm |
|---|
| 13 | 1.12 | Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse [HBG] and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints, applying debonding strips, primer, sealant, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For 170mm thick with 3.25m joint spacing. | | 701.25 | Cum |
|---|
| 14 | 2 | Construction of single row 1000mm dia, Pipe Culverts - 1 No | | | |
|---|
| 15 | 2.01 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations | | 41.2 | Cum |
|---|
| 16 | 2.02 | Filling in foundation trenches / Pipe bedding with Stone Dust as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete. | | 0.88 | Cum |
|---|
| 17 | 2.03 | Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course | | 5.42 | Cum |
|---|
| 18 | 2.04 | Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Head walls and Parapet | | 19.37 | Cum |
|---|
| 19 | 2.05 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1101.6 MORD ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete - For Pipe Culverts with 1000mm dia NP3 pipes | | 10 | Rmt |
|---|
| 20 | 3 | Construction of 1000mm dia, Pipe Culverts of 3 rows - 2 Nos | | | |
|---|
| 21 | 3.01 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations | | 252.44 | Cum |
|---|
| 22 | 3.02 | Filling in foundation trenches / Pipe bedding with Stone Dust as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete. | | 5.14 | Cum |
|---|
| 23 | 3.03 | Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course | | 16.64 | Cum |
|---|
| 24 | 3.04 | Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Head walls and Parapet | | 58.54 | Cum |
|---|
| 25 | 3.05 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1101.6 MORD ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete - For Pipe Culverts with 1000mm dia NP3 pipes | | 45 | Rmt |
|---|
| 26 | 4 | Construction of side drains | | | |
|---|
| 27 | 4.01 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations | | 864 | Cum |
|---|
| 28 | 4.02 | Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course | | 216 | Cum |
|---|
| 29 | 4.03 | Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Head walls and Parapet | | 273.6 | Cum |
|---|
| 30 | 4.04 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1101.6 MORD ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete - For Pipe Culverts with 300mm dia NP3 pipes | | 100 | Rmt |
|---|
| 31 | 4.05 | Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1001 and 1202 MORD & 1100, 1600 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete - For Foundation | | 3 | MT |
|---|
| 32 | 4.06 | Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed for drain slabs complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD including contractors profit & Over head charges, GST and Seigneorage etc., complete | | 30 | Cum |
|---|
| 33 | 5 | Construction of retaining wall | | | |
|---|
| 34 | 5.01 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations | | 507 | Cum |
|---|
| 35 | 5.02 | Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course | | 71.64 | cum |
|---|
| 36 | 5.03 | Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Head walls and Parapet | | 485.5 | Cum |
|---|
| 37 | 6 | Road Furniture | | | |
|---|
| 38 | 6.01 | Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete (precast) for 5th KM Stone | | 1 | No |
|---|
| 39 | 6.02 | Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete (precast) for Ordinary KM Stone | | 6 | No |
|---|
| 40 | 6.03 | Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete (precast) for 200M Stone | | 24 | No |
|---|
| 41 | 6.04 | Providing & fixing of typical PMGSY informatory sign board with LOGO as per MORD secifications and drawing with Reretro reflective sheeting including lettering and signs as applicable background with epoxy paint . Three Alluminium Composite Material as per Drawings, top and middle plate duly welded with MS flat iron 25mmx5mm size on black on edges. The lower plate will be welded with MS angle iron frame of lower most plate and flate iron frame of middle plate will be welded to 2 nos 75mmx75mm of 12 SWG sheet tubes posts duly embedded in CC M15 grade blocks of 450mmx450mmx600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mmx47mm of 12 SWG sheet plate tube. All MS will be stove enmeled on both sides. Lettering and paining of superior quality in required shede and colour. All sections of framed posts and sheet tube will be painted with primer and two coats of epoxy paint as per drawing clause 1701 and annexure 1700.1 if MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete | | 7 | No |
|---|
| 42 | 6.05 | Providing and erecting direction and place identification retro-refectorised sign as per IRC:67 made of encapsulated lens type refective type sheeting vide clause 1701.2.3 MORD fixed over aluiminium sheeting,2 mm thick with area not exceeding 0.90 sqm supported on mild steel iron posts 75x75x6 mm firmly fixed to ground by means of propoerly designed foundation with M15 grade cement concrete 450x450x600 mm,600 mm below groubd level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work. | | 4 | No |
|---|
| 43 | 6.06 | Providing & fixing of typical PMGSY informatory sign board with LOGO (at every 2 km) as per MORD secifications and drawing with Reretro reflective sheeting including lettering and signs as applicable background with epoxy paint. Three Alluminium Composite Material , top and Bottom plate duly Revited with MS flat iron 25mmx5mm size on black on edges. The lower plate will be welded with MS angle iron frame of lower most plate and flate iron frame of middle plate will be welded to 1 nos 75mmx75mm of 12 SWG sheet tubes posts duly embedded in CC M15 grade blocks of 450mmx450mmx600mm, 600mm below ground level. The top most diamond plate and Bottom Plate will be made with 25mmX25mmX5mm MS Angles and welded MS tube tube. All MS painted Epoxy on Both sides. Lettering and paining of superior quality in required shede and colour. All sections of framed posts and sheet tube will be painted with primer and two coats of epoxy paint as per drawing clause 1701 and annexure 1700.1 if MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete | | 10 | No |
|---|
| 44 | 6.07 | Supply and Installation of Hazard Markers using M.S. Angle of size 55X55X6mm and 120 cm high above ground level painted with two coats of black & white stripes of 15cm wide with first quality synthetic enamel paint over one coat of appropriate primer of approved brand, colour, with 30cm X 90cm retro reflective sheeting type III/IV of yellow colour fixed at top over 1.5mm aluminium sheet with standard supports consisting of alternately black and yellow stripes, with black stripes in screen printing sloping downward at an angle of 45degree towards the side of the obstruction on which the traffic is pass and buried in to the ground in a trench of size 30cm X 30cm, and 50cm depth filled with CC 1:2:4 including cost and conveyance of all materials, equipment, machinery and labour with all lead and lifts, loading and unloading charges necessary for successful completion of works as directed by the Engineer-in-Charge and conforming to IRC 79-1981 & MoRTH specification no. 805 and approved drawings etc., complete for finished item of work including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work. | | 20 | No |
|---|