| 1 | 1 | Trenching in ordinary soil up to a depth of 60 cm including removal and stacking of serviceable materials and then disposing of surplus soil, by spreading and neatly levelling within a lead of 50 m and making up the trenched area to proper levels by filling with earth or earth mixed with sludge or / and manure before and after flooding trench with water (excluding cost of imported earth, sludge or manure). | 1 | 289 | cum |
|---|
| 2 | 2 | Supplying and stacking of good earth at site including royalty and carriage upto 5 km lead complete (earth measured in stacks will be reduced by 20% for payment | 2 | 22 | cum |
|---|
| 3 | 3 | Supplying and stacking sludge at site including royalty and carriage upto 5 km lead complete (sludge measured in stacks will be reduced by 8% for payment). | 3 | 22 | cum |
|---|
| 4 | 4 | Supplying and stacking at site dump manure from approved source,including carriage upto 5 km lead complete (manure measured in stacks will be reduced by 8% for payment) Screened through sieve of I.S. designation 16 mm cum | 4 | 22 | cum |
|---|
| 5 | 5 | Providing & laying Selection no. 1 grass turf with earth 50mm to 60mm thickness of existing ground prepared with proper level and ramming with required tools wooden and than rolling the surface with light roller make the surface smoothen and light watering the same maintenance for 30 days or more till the grass establish properly,as per direction of officer in chargeProviding & laying Selection no. 1 grass turf with earth 50mm to 60mm thickness of existing ground prepared with proper level and ramming with required tools wooden and than rolling the surface with light roller make the surface smoothen and light watering the same maintenance for 30 days or more till the grass establish properly,as per direction of officer in charge | 5 | 481 | sqm |
|---|
| 6 | 6 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 6 | 24 | cum |
|---|
| 7 | 7 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately)(a)Holes 45 cm dia, and 45 cm deep. | 7 | 30 | each |
|---|
| 8 | 8 | Edging with bricks laid dry length wise, including required excavation, refilling, consolidating with hand packing and spreading surplus earth neatly within a lead of 50 m : Common burnt clay F.P.S (non modular) bricks of Class designation 7.5 | 8 | 60 | meter |
|---|
| 9 | 9 | Supplying and stacking of well decayed cattle manure at site including royalty and carriage upto 5 k.m.lead complete (Cattle manure measured in stacks will reduced by 8% for Payment). Cum 230.452.25 Supplying and stacking of well decayed cattle manure at site including royalty and carriage upto 5 k.m.lead complete (Cattle manure measured in stacks will reduced by 8% for Payment). | 9 | 10 | cum |
|---|
| 10 | 10 | Providing Circular Cement Concrete pots of specified size, cast with cement concrete of nominal mix 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 6 mm nominal size), reinforced with 7 Nos ( 3 nos horizontal & 4 nos vertical “ U “ shape) M.S. wires of 3.5 mm dia as per design, including required form work, finishing with cement punning on exposed surface, curing for specified period and stacking in required rows & height, all complete as per direction of Officer-in-charge(A)Top inside dia 35 cm, outer bottom dia 25 cm, total height 35 cm with wall thickness of 25.4 mm | 10 | 100 | each |
|---|
| 11 | 11 | Filling of the following size empty pots with mixture of good earth & manure in the ratio of 2:1 (Two part of Good earth & one port of manure) and placing them on approprite place i/c carriage of earth, manure and pots up to 50 mtr, as per direction of officer incharge. (The cost of good earth, earthen pots & manure will be paid seperately.)Size of Empty Pots 35cm Top dia, 25cm Bottom Dia & 35cm Perpendicular height. | 11 | 100 | each |
|---|
| 12 | 12 | Providing and displaying of Araucaria cookie having ht. 60 cm to 75 cm, straight, well developed, fresh and healthy with lush green leaves from bottom to top in 20 cm size of Earthen pot/Plastic pot. & as per direction of the officer-in-charge. | 12 | 15 | each |
|---|
| 13 | 13 | Providing and displaying of Areca Palm having ht. 90 cm to 1.20 m with 4 to 5 suckers, well developed, fresh and healthy with lush green foliage in 25 cm size of Earthen pot/Plastic pot & as per direction of the officer-in-charge. Each | 13 | 20 | each |
|---|
| 14 | 14 | Providing and displaying of Livistona palm having ht. 30 cm to 45 cm, well developed with 5 to 6 leaves, fresh & healthy foliage in 25 cm size of Earthen pot/Plastic pot as per direction of the officer-in-charge. | 14 | 10 | each |
|---|
| 15 | 15 | Providing and displaying of Phoenix palm having ht. 75 cm to 90 cm with 10 to 15 or more leaves, well developed, fresh and healthy in 25 cm size of Earthen pot/Plastic pot & as per direction of the officer-in-charge | 15 | 20 | each |
|---|
| 16 | 16 | Providing and displaying of Raphis palm having ht. 75 cm to 90 cm with 12 to 15 equal suckers, well developed, full of fresh & healthy leaves from bottom to top in 25 cm size Earthen pot/Plastic pot & as per direction of the officer-in-charge. | 16 | 20 | each |
|---|
| 17 | 17 | Providing and Displaying Budded Rose (H.T. variety) 3 to 4 healthy branch 30 cm and above ht. well developed with one and above flower plant in 20 cm Earthen Pot, as per direction of the officer-in-charge. | 17 | 41 | each |
|---|
| 18 | 18 | Providing and Displaying Ficus nuda topiary well developed with fresh & healthy foliage 45 to 60cm spread 75 to 90 cm ht. bushy in 35 cm Cement Pot as per direction of the officer-in-charge. | 18 | 10 | each |
|---|
| 19 | 19 | Providing and stacking of Bottle palm of ht. 150-180 cm bottom girth 20-25 cm well developed in big poly bags of size 25 cm as per direction of the officer-in-charge. | 19 | 10 | each |
|---|
| 20 | 20 | Providing and stacking of Ficus benjamina (green) of height 120-135 cm. with 6-8 branches and lush green foliage in g. bags of size 25 cm as per direction of the officer-in-charge. | 20 | 10 | each |
|---|
| 21 | 21 | Providing and stacking of Ficus nuda of height 120-135 cm. with 6-8 branches and lush green foliage in g. bags of size 25 cm as per direction of the officer-in-charge. | 21 | 15 | each |
|---|
| 22 | 22 | Providing and stacking of Ficus shiela of height 150-165 cm. in big poly\nbags of size 25 cm as per direction of the officer-in-charge. Each 85.00 | 22 | 15 | each |
|---|
| 23 | 23 | Providing and stacking of Fishtail palm of ht. 150-180 cm bottom girth 15- 20 cm well developed in big poly bags of size 25 cm as per direction of the officer-in-charge. | 23 | 10 | each |
|---|
| 24 | 24 | Providing and stacking of Washingtonia filifea palm stem ht. 90-105 cm with 6-7 healthy leaves lush green leaves well developed in big size HDPE Bags as per direction of the officer-in-charge. | 24 | 10 | each |
|---|
| 25 | 25 | Painting with synthetic enamel paint of approved brand andmanufacture to give an even shade : Two or more coats on new work | 25 | 40 | sqm |
|---|
| 26 | 26 | Removal of garden waste by TATA 407 or equivalent including loading/ unloading and carriage upto 1 km lead,complete disposal upto designated place as per direction of officer-in-charge | 26 | 5 | per trip |
|---|