| 1 | 1 | NAME OF WORK :- Construction of 30,000 litre capacity OHT in T.Pudupatty Village in Thirumangalam Block | | | |
|---|
| 2 | 2 | Earth work excavation and depositing on bank with an initial lead of 10m & lift of 2m in A. Hard stiff clay block cotton, hard red earth shales, murram, ordinary gravel etc., .SS20A | | 26.19 | Sqm |
|---|
| 3 | 3 | Refilling with excavated earth soil other than sand including consolidation etc., complete | | 8.375 | Cum |
|---|
| 4 | 4 | Sand filling for foundation with clear sand including consolidation etc., complete | | 1.73 | Sqm |
|---|
| 5 | 5 | Cement concrete 1:4:8 mix ( One cement four sand and eight aggregate )using 40mm HBGS for leveling course for foundation including curing etc., complete | | 3.47 | Cum |
|---|
| 6 | 6 | RCC 1:11/2:3 mix ( One cement One and half sand and three aggregate )using 20mm HBGS excluding cost of reinforcement, centering, shuttering, strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete | | | |
|---|
| 7 | 7 | a) FOOTING | | 3.24 | Cum |
|---|
| 8 | 8 | b) For items Below G.L | | 1.05 | Cum |
|---|
| 9 | 9 | c) Column above GL. up to 4.5mt from GL | | 1.79 | Cum |
|---|
| 10 | 10 | d) Column above 4.5m. up to 7.32m | | 0.2 | Cum |
|---|
| 11 | 11 | RCC 1:11/2:3 mix ( One cement One and half sand and three aggregate )using 20mm HBGS excluding cost of reinforcement, centering, shuttering, strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete | | | |
|---|
| 12 | 12 | a) For items above 4.5m & up to 7.32 from GL | | 4.55 | Cum |
|---|
| 13 | 13 | b)For items above 7.33m to 10.98m from G.L | | 4.78 | Cum |
|---|
| 14 | 14 | c)For items above 7.33m to 10.98m from G.L | | 1.44 | Cum |
|---|
| 15 | 15 | Centering to soffits for RCC works including shuttering, strutting charges and cost of cost of using MS Sheet and MS Angle etc., complete | | | |
|---|
| 16 | 16 | a) Below G.L. items | | 18.09 | Sqm |
|---|
| 17 | 17 | b) Above G.L. items | | 10.5 | Sqm |
|---|
| 18 | 18 | c) Brace @ 2.625m height above G.L Sides | | 7.97 | Sqm |
|---|
| 19 | 19 | d) Column from 2.85m to 3.3m ht | | 1.8 | Sqm |
|---|
| 20 | 20 | E) Column from 3.3m to 4.0m ht | | 2.8 | Sqm |
|---|
| 21 | 21 | F) Column from 4.0m to 4.30m ht | | 1.2 | Sqm |
|---|
| 22 | 22 | G) Column from 4.3m to 5.30m ht | | 4 | Sqm |
|---|
| 23 | 23 | H) For grid beam at 5.25m ht from G.L | | 36.18 | Sqm |
|---|
| 24 | 24 | g) Floor slab @ 5.64m (plain surface)including working platform | | | |
|---|
| 25 | 25 | Centering to soffits for RCC works using MS plates and MS angles complete | | 2.97 | Sqm |
|---|
| 26 | 26 | a) Floor slab curved surfaces (sides) | | 74.55 | Sqm |
|---|
| 27 | 27 | b) FOR SIDE WALL (curved surface) | | 1.37 | Sqm |
|---|
| 28 | 28 | c) Roof Slab | | 12.63 | Sqm |
|---|
| 29 | 29 | Plastic emulsion Painting two coats with approved cement paint over the exposed surface of the Reservoir including cleaning, preparing the surface and curing etc., complete | | 95.78 | Sqm |
|---|
| 30 | 30 | Supplying Fabrication and placing in position of MS /RTS rods for reinforcement including the cost of steel and binding wire etc., complete. | | 1.39 | MT |
|---|
| 31 | 31 | Supply, delivery and fixing of MS Ladder outside the S.R with locking arrangements. Including painting two coats with ready mixed enamel Approved TWAD TYPE Design | | 1 | No |
|---|
| 32 | 32 | Providing RCC ladder inside the tank | | 1 | No |
|---|
| 33 | 33 | Providing AC Ventilating arrangements with mosquito proof nylon net with 6\" A.C. Cowl | | 1 | No |
|---|
| 34 | 34 | Supply and fixing of C.I. Manhole cover of size 0.75m x 0.75m | | 1 | No |
|---|
| 35 | 35 | Providing For 50mm dia GI Pipe for Section and Delivery Pipe | | 6 | Rm |
|---|
| 36 | 36 | 50mm dia GI Coupling | | 1 | Nos |
|---|
| 37 | 37 | 50mm dia GI Flange | | 1 | Nos |
|---|
| 38 | 38 | 50mm dia GI Bend | | 1 | Nos |
|---|
| 39 | 39 | Bore well Arrangements | | | |
|---|
| 40 | 40 | Geo Physical Survey Charges | | 1 | No |
|---|
| 41 | 41 | Drilling of 165mm dia borewell in hardrock area including labour charges for insertion of casing pipes in to the drilled hole | | | |
|---|
| 42 | 42 | In soft soil | | 12 | M |
|---|
| 43 | 43 | In Hard rock | | 138 | M |
|---|
| 44 | 44 | Supply and delivery of 200mm dia PVC casing pipe | | 12 | m |
|---|
| 45 | 45 | Supply and Delivery of following materials | | | |
|---|
| 46 | 46 | Supply and delivary of 5.00 H.p submercible pump set 50lpm x 200m head | | 1 | No |
|---|
| 47 | 47 | Supply and fixing of panel board suitable for 5.00 HP submerciple pump set . | | 1 | No |
|---|
| 48 | 48 | 200mm Bore well cover | | 1 | No |
|---|
| 49 | 49 | Bore gitty | | 1 | No |
|---|
| 50 | 50 | 40mm dia UPVC Pipe | | 123 | Rm |
|---|
| 51 | 51 | Nilan Rope | | 126 | M |
|---|
| 52 | 52 | 40mm dia GI Adopter | | 1 | No |
|---|
| 53 | 53 | 40mm dia GI Elbow | | 2 | No |
|---|
| 54 | 54 | 40mm dia MS NRV | | 1 | No |
|---|
| 55 | 55 | 40mm dia MS gatevave | | 1 | No |
|---|
| 56 | 56 | 40mm dia GI Hex niple | | 2 | No |
|---|
| 57 | 57 | 40mm dia GI Union | | 1 | No |
|---|
| 58 | 58 | 40mm dia GI Pipe | | 1.65 | M |
|---|
| 59 | 59 | 40mm dia PVC Elbow | | 1 | No |
|---|
| 60 | 60 | 63mm dia GI Pipe | | 18 | M |
|---|
| 61 | 61 | 4.00sq.mm Submersible Cable | | 129 | M |
|---|
| 62 | 62 | 25mm dia PVC Pipe for Cable | | 5 | Rm |
|---|
| 63 | 63 | 25mm dia PVC Elbow | | 3 | No |
|---|
| 64 | 64 | 25mm dia PVC Bend | | 6 | No |
|---|
| 65 | 65 | 25mm dia GI Service Pipe SD NO 69 | | 1.8 | Rm |
|---|
| 66 | 66 | 50mm dia GI Pipe | | 18 | M |
|---|
| 67 | 67 | 50mm dia GI Coupling | | 2 | No |
|---|
| 68 | 68 | 50mm dia GI Bend | | 2 | No |
|---|
| 69 | 69 | 50mm dia GI Hex Nipple | | 1 | No |
|---|
| 70 | 70 | 50mm dia GI Flange | | 3 | No |
|---|
| 71 | 71 | 50mm dia GI Elbow | | 2 | No |
|---|
| 72 | 72 | 50mm dia MS Gate valve | | 2 | No |
|---|
| 73 | 73 | 50mm dia GI End Cap | | 1 | No |
|---|
| 74 | 74 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 A for Surface Dressing etc complete (For PVC Pipe line) | | 13.02 | Cum |
|---|
| 75 | 75 | Towards Labour charges for erection of submersible pumpset 5.00 HP Near School Bore | | 1 | No |
|---|
| 76 | 76 | Refilling excavated earth including all labour charges etc., | | 13.02 | Cum |
|---|
| 77 | 77 | Providing For Name Board and Photo Charges | | 1 | No |
|---|
| 78 | 78 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package}\n | BI01010001010000000000000515BI01000011120 | 1 | GST Amount (in Rupees) |
|---|