Kerala State Electricity Board-KSEB has published 11Kv Oh Work Constructing 1 . 95Km 11Kv Line Along Elivaly To Alamattam Road For Avoiding Cross Country Under Es Kollappally. Submission Date for this Tender is 09-03-2021. Overhead Line Tenders in Kollappally Elivally Kerala. Bidders can get complete Tender details and download the document.
Name of Work:Constructing 1.95kM 11kV line along Elivally to Alamattam road for avoiding cross country under Ele.section, Kollappally.WC-574034112000155 | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). | 56 | No | |
2 | 2 | Loading HT 'A' type pole from the stacking place and unloading the same at work site (transport by vehicle). | 10 | No | |
3 | 3 | Loading LT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). | 4 | No | |
4 | 4 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. | 17 | Trip | |
5 | 5 | Transporting poles by hired vehicle to a distance beyond 5km and carrying upto 4 poles. (Running km). | 20 | km | |
6 | 6 | Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. | 2 | No | |
7 | 7 | Drilling hole of various sizes on existing Channel/Cross Arm. | 9 | No | |
8 | 8 | Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. | 47 | No | |
9 | 9 | Fitting and erecting one HT 'A' type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. | 8 | No | |
10 | 10 | Additional rate for providing one disc set on any type of HT pole for making cut point. | 66 | No | |
11 | 11 | Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. | 2 | No | |
12 | 12 | Fitting and erecting one HT DP using 'A' type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. | 1 | No | |
13 | 13 | Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit. | 55 | No | |
14 | 14 | Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit. | 5 | No | |
15 | 15 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl. digging & back filling pits. | 3 | No | |
16 | 16 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. | 40 | No | |
17 | 17 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. | 22 | No | |
18 | 18 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Soft Rock. | 5 | No | |
19 | 19 | Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. cutting and removing tree branches wherever necessary. | 1.918 | km | |
20 | 20 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. | 58 | No | |
21 | 21 | Fitting one set AB switch and giving connection | 1 | No | |
22 | 22 | Conveyance of one km 11kV line materials from section store/stacking place to the work site (excluding poles). | 9.75 | km/ km | |
23 | 23 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials. | 28 | No | |
24 | 24 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials. | 6 | No | |
25 | 25 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. | 9 | No | |
26 | 26 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. | 31 | No | |
27 | 27 | Dismantling (without damage) LT stay incl. digging pit in all classes of soil and backfilling | 19 | No | |
28 | 28 | Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. | 17 | No | |
29 | 29 | Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. | 54 | No | |
30 | 30 | Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion. | 28 | No | |
31 | 31 | Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion. | 5 | No | |
32 | 32 | Erecting one LT PSC Pole in position incl. digging & back filling pit. | 4 | No | |
33 | 33 | Providing Stay for LT poles incl. digging & back filling pit. | 1 | No | |
34 | 34 | Stringing one km LT Sph 2 wire line (Rabbit) incl. fitting cross arm etc. removing touchings and conveyance of materials. | 0.12 | km | |
35 | 35 | Stringing one km LT 3ph 4 wire line (Rabbit for Ph, Weasel for N) incl. fitting cross arm etc. removing touchings and conveyance of materials. | 0.1 | km | |
36 | 36 | Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting. | 10 | No | |
37 | 37 | Cutting trees beyond 30cm but upto and incl. 60cm girth, cutting of trunks/branches, removing the root completely and stacking. | 28 | No | |
38 | 38 | Cutting trees beyond 60cm but upto and incl. 120cm girth, cutting of trunks/branches, removing the root completely and stacking. | 8 | No | |
39 | 39 | Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification). | 10 | No | |
40 | 40 | Providing one Earth using earth pipe incl. digging & backfilling pit and supply of charcoal, salt, sand etc. | 2 | No |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail