| 1 | 1 | Pole pit excavation for 9.0M and 9.14 M PSC/RCC / all metal poles (each pit) 1.25 x 0.6 x 1.83 mtr - Ordinary soil by JCB | Item1 | 117 | Pit |
|---|
| 2 | 2 | Excavation of Stay pit in ordinary soil [0.95 x 0.6 x 1.2m] by JCB | Item2 | 126 | Pit |
|---|
| 3 | 3 | Erection of 9.00m / 9.14m RCC / PSC/Rail pole, Tubular pole and all Metal Poles (Including refilling of excavated earth) by JCB | Item3 | 117 | E |
|---|
| 4 | 4 | Erection stay set complete (Including refilling of excavated earth) | Item4 | 126 | Set |
|---|
| 5 | 5 | Loading of [ 9.14 mtr ] 9.0 mtr poles RCC /PSC Pole / Metal Pole [ per pole ] | Item5 | 117 | E |
|---|
| 6 | 6 | Unloading of [ 9.14 mtr ] 9.0 mtr poles RCC /PSC Pole / Metal Pole [ per pole ] | Item6 | 117 | E |
|---|
| 7 | 7 | TRANSPORTING FROM ROAD SIDE TO WORKSPOT - Transport of 9.0 mtr and above poles including R.S. Joist and Rail poles upto 1.0 Km | Item7 | 117 | E |
|---|
| 8 | 8 | Numbering of Pole | Item8 | 117 | E |
|---|
| 9 | 9 | Fixing of LTTI, HT TI Fitting | Item9 | 24 | E |
|---|
| 10 | 10 | Fixing of LT 3 ph Cross Arm | Item10 | 9 | E |
|---|
| 11 | 11 | Fixing of LT 1 ph Cross Arm | Item11 | 4 | E |
|---|
| 12 | 12 | Fixing of 3 ½ ” V Cross arm | Item12 | 194 | E |
|---|
| 13 | 13 | Fixing of tapping channel / guarding Cross arm | Item13 | 176 | E |
|---|
| 14 | 14 | Fixing of 11 KV Pin insulator with pin | Item14 | 574 | E |
|---|
| 15 | 15 | Fixing of 11 KV strain disc / polymer disc with hardware | Item15 | 343 | set |
|---|
| 16 | 16 | Fixing of LT Pin insulator with pin | Item16 | 15 | E |
|---|
| 17 | 17 | Fixing of Aluminium knob | Item17 | 91 | E |
|---|
| 18 | 18 | Paving Stringing and sagging of conductor including binding of pin and proper tight [including transport of condutor from Road side to work spot] per run - ACSR 7/3.35mm & 7/ 3.15 AAAC including PVC cable above 25 sqmm | Item18 | 0.445 | Km |
|---|
| 19 | 19 | Paving Stringing and sagging of conductor including binding of pin and proper tight [including transport of condutor from Road side to work spot] per run ACSR 7/4.09 mm | Item19 | 15.854 | Km |
|---|
| 20 | 20 | Earthing of poles | Item20 | 116 | E |
|---|
| 21 | 21 | Guarding Arrangement :- Flat guarding with 4 wire | Item21 | 44 | Span |
|---|
| 22 | 22 | Dismantling of 7.5m / 8.0m poles [RCC / PSC] using JCB | Item22 | 8 | E |
|---|
| 23 | 23 | Dismantling of 9.00m / 9.14m RCC / PSC/Rail pole, Tubular pole and all Metal Poles using JCB | Item23 | 48 | E |
|---|
| 24 | 24 | Dismantling of LT/HT TI Fitting | Item24 | 20 | E |
|---|
| 25 | 25 | Dismantling of 3 ½ ” V Cross arm | Item25 | 5 | E |
|---|
| 26 | 26 | Dismantling of tapping channel / guarding \"X\" arm | Item26 | 3 | E |
|---|
| 27 | 27 | Dismantling of 11 KV Pin insulator with pin | Item27 | 13 | E |
|---|
| 28 | 28 | Dismantling of 11 KV strain disc / polymer disc with hardware | Item28 | 11 | set |
|---|
| 29 | 29 | Dismantling of conductor ACSR 7/3.35mm & 7/ 3.15 AAAC including PVC cable above 25 sqmm | Item29 | 1.566 | Km |
|---|
| 30 | 30 | Dismantling of conductor 7/2.59 mm ACSR, 7/2.50 AAAC including PVC cable upto 25 sqmm | Item30 | 0.491 | Km |
|---|
| 31 | 31 | Sub Total | Item54 | 1 | Each |
|---|
| 32 | 32 | EPF @ 13% | Item55 | 1 | Each |
|---|
| 33 | 33 | ESI @ 3.25% | Item56 | 1 | Each |
|---|
| 34 | 34 | SGST % | Item57 | 1 | Each |
|---|
| 35 | 35 | CGST % | Item58 | 1 | Each |
|---|
| 36 | 36 | IGST % | Item59 | 1 | Each |
|---|