Tamil Nadu Generation And Distribution Corporation Limited-TANGEDCO has published Complete Design Engineering Procurement Manufacturing Assembly Inspection Testing At Manufacturers Works Packing Forwarding Transporting And Insurance Supply Of Complete Semi Dry Flue Gas Desulphurisation Fgd System And Auxiliaries Including Supply O. Submission Date for this Tender is 09-11-2023. Flue Gas Desulfurization System Tenders in Mettur Thermal Power Station I Tamil Nadu. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 21-Apr-2021 | Due date extension | Date | 19-05-2021 |
2 | 21-Apr-2021 | Due date extension | Date | 19-05-2021 |
3 | 17-May-2021 | Tender opening date extended | Date | 14-06-2021 |
4 | 17-May-2021 | Tender opening date extended | Date | 14-06-2021 |
5 | 08-Jun-2021 | Due date of tender opening extended - reg | Date | 07-07-2021 |
6 | 06-Jul-2021 | Drawing | Other | 04-08-2021 |
7 | 06-Jul-2021 | AUTOCADdrawing | Other | 04-08-2021 |
8 | 06-Jul-2021 | Plantdrawing | Other | 04-08-2021 |
9 | 06-Jul-2021 | Lay out Drawing | Other | 04-08-2021 |
10 | 06-Jul-2021 | Due date extension reg | Date | 04-08-2021 |
11 | 31-Jul-2021 | Extension of due date of tender opening | Date | 30-08-2021 |
12 | 26-Aug-2021 | Extension of Due date | Date | 06-09-2021 |
13 | 03-Sep-2021 | Due date extended | Date | 30-09-2021 |
14 | 23-Sep-2021 | Due date extd | Date | 11-10-2021 |
15 | 10-Oct-2021 | Due date extd - reg | Date | 01-11-2021 |
16 | 30-Oct-2021 | Date extension | Date | 29-11-2021 |
17 | 27-Nov-2021 | DDExtd10 | Date | 20-12-2021 |
18 | 17-Dec-2021 | DD Extn | Date | 12-01-2022 |
19 | 10-Jan-2022 | DDExtn12 | Date | 02-02-2022 |
20 | 29-Jan-2022 | DD Extn14 | Date | 24-02-2022 |
21 | 18-Feb-2022 | DD Extension | Date | 02-03-2022 |
22 | 01-Mar-2022 | Duedate extension | Date | 22-03-2022 |
23 | 19-Mar-2022 | Duedate extension 17 | Date | 18-04-2022 |
24 | 11-Apr-2022 | DD Extension18 | Date | 25-04-2022 |
25 | 23-Apr-2022 | DDExtension19 | Date | 19-05-2022 |
26 | 11-May-2022 | DD Extension20 | Date | 25-05-2022 |
27 | 21-May-2022 | Extension DD | Date | 17-06-2022 |
28 | 04-Jun-2022 | DDEXTN | Date | 27-06-2022 |
29 | 22-Jun-2022 | DDExtn | Date | 18-07-2022 |
30 | 08-Jul-2022 | ddextension | Date | 27-07-2022 |
31 | 13-Jul-2022 | Replytoprebidqueries | Technical Bid | 27-07-2022 |
32 | 26-Jul-2022 | Due date extension of FGD | Date | 24-08-2022 |
33 | 10-Aug-2022 | Extension of DD | Date | 29-08-2022 |
34 | 26-Aug-2022 | Extension of DD of opening | Date | 21-09-2022 |
35 | 12-Sep-2022 | DD Extended | Date | 29-09-2022 |
36 | 27-Sep-2022 | DD Extension29 | Date | 28-10-2022 |
37 | 25-Oct-2022 | DDEXTENSION11a | Date | 24-11-2022 |
38 | 04-Nov-2022 | DDExtension11 | Date | 28-11-2022 |
39 | 24-Nov-2022 | DDEXTENSION12a | Date | 21-12-2022 |
40 | 02-Dec-2022 | Extension of due date | Date | 28-12-2022 |
41 | 13-Dec-2022 | LIMITATIONS OF LIABILITIES for DJU | Other | 28-12-2022 |
42 | 23-Dec-2022 | DDEXTENSIONJAN | Date | 20-01-2023 |
43 | 03-Jan-2023 | DDEXTENSIONJANUARY | Date | 30-01-2023 |
44 | 21-Jan-2023 | DDEXTENSIONMARCH | Date | 17-02-2023 |
45 | 08-Feb-2023 | DD Extended March | Date | 01-03-2023 |
46 | 17-Feb-2023 | Due date of opening April | Date | 15-03-2023 |
47 | 06-Mar-2023 | Due date extension April | Date | 05-04-2023 |
48 | 29-Mar-2023 | DDEXTENSIONMAY | Date | 24-04-2023 |
49 | 13-Apr-2023 | DDEXTENSIONMAY23 | Date | 09-05-2023 |
50 | 03-May-2023 | Annexure23 | Other | 01-06-2023 |
51 | 03-May-2023 | DDEXTENSIONJUNE23 | Date | 01-06-2023 |
52 | 22-May-2023 | Due date of opening extension | Date | 13-06-2023 |
53 | 06-Jun-2023 | DDEXTENSIONJULY23 | Date | 03-07-2023 |
54 | 19-Jun-2023 | Due date extension 14 Julyl | Date | 13-07-2023 |
55 | 07-Jul-2023 | Due date extension Aug | Date | 03-08-2023 |
56 | 24-Jul-2023 | Due date extension Aug23 | Date | 17-08-2023 |
57 | 11-Aug-2023 | Installation of FGD - Due date extended - reg | Date | 07-09-2023 |
58 | 22-Aug-2023 | Due date extension Sept 23 | Date | 19-09-2023 |
59 | 16-Sep-2023 | Due date extension Oct23 | Date | 12-10-2023 |
60 | 25-Sep-2023 | Due date extended 201023 | Date | 19-10-2023 |
61 | 12-Oct-2023 | Due date extension Nov23 | Date | 09-11-2023 |
Name of Work: Engineering, Procurement and Construction (EPC) contract for Complete Design, Engineering, Manufacture/procurement, Assembly, Inspection, Testing at Manufacturer’s Works, Packing, Forwarding, Transporting and Insurance, Supply of Complete Machineries (Complete Mechanical, Electrical, Instrumentation & Control Systems and Civil, Structural & Architectural Works and Mandatory Spares at Site), Assembly, Erection, Testing, Commissioning, Trial/ Reliability Run, Conducting Performance Guarantee Tests and Handing over of Flue Gas Desulphurisation System and Auxiliaries for 4 X 210 MW Mettur thermal power station 1, METTUR DAM-636406, SALEM DIST., Tamil Nadu. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | (1.0) SUPPLY OF MAIN EQUIPMENT INCLUDING FACTORY FABRICATED STEEL STRUCTURES FOR SEMI DRY FLUE GAS DESULPHURISATION SYSTEM PACKAGE FOR4 X 210 MW METTUR DAM THERMAL POWER STATION\n(1.01) BOOSTER FAN AND DUCTING\nSYSTEM\n(1.0101) INDIAN COMPONENTS | item1 | 1 | Lot |
2 | 2 | (1.0) SUPPLY OF MAIN EQUIPMENT INCLUDING FACTORY FABRICATED STEEL STRUCTURES FOR SEMI DRY FLUE GAS DESULPHURISATION SYSTEM PACKAGE FOR4 X 210 MW METTUR DAM THERMAL POWER STATION\n(1.01) BOOSTER FAN AND DUCTING\nSYSTEM\n(1.0102) FOREIGN COMPONENTS | item2 | 1 | Lot |
3 | 3 | (1.02) ABSORBER / REACTOR SYSTEM \n(1.0201) INDIAN COMPONENTS | item3 | 1 | Lot |
4 | 4 | (1.02) ABSORBER / REACTOR SYSTEM \n(1.0202) FOREIGN COMPONENTS | item4 | 1 | Lot |
5 | 5 | (1.03) FABRIC/BAG FILTER SYSTEM\n(1.0301) INDIAN COMPONENTS | item5 | 1 | Lot |
6 | 6 | (1.03) FABRIC/BAG FILTER SYSTEM\n(1.0302) FOREIGN COMPONENTS | item6 | 1 | Lot |
7 | 7 | (1.04) LIME STORAGE, CONVEYING SYSTEM AND SLURRY PREPARATION SYSTEM\n(1.0401) INDIAN COMPONENTS | item7 | 1 | Lot |
8 | 8 | (1.04) LIME STORAGE, CONVEYING SYSTEM AND SLURRY PREPARATION SYSTEM\n(1.0402) FOREIGN COMPONENTS | item8 | 1 | Lot |
9 | 9 | (1.05) BY-PRODUCT COLLECTION AND CONVEYING SYSTEM\n(1.0501) INDIAN COMPONENTS | item9 | 1 | Lot |
10 | 10 | (1.05) BY-PRODUCT COLLECTION AND CONVEYING SYSTEM\n(1.0502) FOREIGN COMPONENTS | item10 | 1 | Lot |
11 | 11 | (1.06) COMPRESSED AIR & PLANT WATER SYSTEM\n(1.0601) INDIAN COMPONENTS | item11 | 1 | Lot |
12 | 12 | (1.06) COMPRESSED AIR & PLANT WATER SYSTEM\n(1.0602) FOREIGN COMPONENTS | item12 | 1 | Lot |
13 | 13 | (1.07) HVAC & FIRE FIGHTING SYSTEM\n(1.0701) INDIAN COMPONENTS | item13 | 1 | Lot |
14 | 14 | (1.07) HVAC & FIRE FIGHTING SYSTEM\n(1.0702) FOREIGN COMPONENTS | item14 | 1 | Lot |
15 | 15 | (1.08) ELECTRICAL, CONTROL & INSTRUMENTATION\n(1.0801) INDIAN COMPONENTS | item15 | 1 | Lot |
16 | 16 | (1.08) ELECTRICAL, CONTROL & INSTRUMENTATION\n(1.0802) FOREIGN COMPONENTS | item16 | 1 | Lot |
17 | 17 | (2.00) SUPPLY OF MANDATORY SPARES\n(2.01) Supply of Mandatory spares \n(as specified in Volume VI)\n(2.0101) INDIAN COMPONENTS | item17 | 1 | Lot |
18 | 18 | (2.00) SUPPLY OF MANDATORY SPARES\n(2.01) Supply of Mandatory spares \n(as specified in Volume VI)\n(2.0102) FOREIGN COMPONENTS | item18 | 1 | Lot |
19 | 19 | (3.0) SUPPLY OF MISCELLANEOUS ITEMS\n(3.0100) Supply of Miscellaneous items that are not covered in the above lists but finding place in Volume I & II of the Specification\n(3.0101) INDIAN COMPONENTS | item19 | 1 | Lot |
20 | 20 | (3.0) SUPPLY OF MISCELLANEOUS ITEMS\n(3.0100) Supply of Miscellaneous items that are not covered in the above lists but finding place in Volume I & II of the Specification\n(3.0102) FOREIGN COMPONENTS | item20 | 1 | Lot |
21 | 21 | (4.0) LOADING, TRANSPORTATION, INSURANCE CHARGES,\nUNLOADING Etc.\n(4.0100) Loading, Inland Transportation including port handling, port clearance, port chargess, Inland Transit Insurance charges, unloading, Storage at site, handling, preservation charges etc. for all E & M works\n(4.0101) BOOSTER FAN AND DUCTING SYSTEM | item21 | 1 | Lot |
22 | 22 | (4.0) LOADING, TRANSPORTATION, INSURANCE CHARGES,\nUNLOADING Etc.\n(4.0100) Loading, Inland Transportation including port handling, port clearance, port chargess, Inland Transit Insurance charges, unloading, Storage at site, handling, preservation charges etc. for all E & M works\n(4.0102) ABSORBER / REACTOR SYSTEM | item22 | 1 | Lot |
23 | 23 | (4.0) LOADING, TRANSPORTATION, INSURANCE CHARGES,\nUNLOADING Etc.\n(4.0100) Loading, Inland Transportation including port handling, port clearance, port chargess, Inland Transit Insurance charges, unloading, Storage at site, handling, preservation charges etc. for all E & M works\n(4.0103) FABRIC/BAG FILTER SYSTEM | item23 | 1 | Lot |
24 | 24 | (4.0) LOADING, TRANSPORTATION, INSURANCE CHARGES,\nUNLOADING Etc.\n(4.0100) Loading, Inland Transportation including port handling, port clearance, port chargess, Inland Transit Insurance charges, unloading, Storage at site, handling, preservation charges etc. for all E & M works\n(4.0104) LIME STORAGE, CONVEYING SYSTEM AND SLURRY PREPARATION SYSTEM | item24 | 1 | Lot |
25 | 25 | (4.0) LOADING, TRANSPORTATION, INSURANCE CHARGES,\nUNLOADING Etc.\n(4.0100) Loading, Inland Transportation including port handling, port clearance, port chargess, Inland Transit Insurance charges, unloading, Storage at site, handling, preservation charges etc. for all E & M works\n(4.0105) BY-PRODUCT COLLECTION AND CONVEYING SYSTEM | item25 | 1 | Lot |
26 | 26 | (4.0) LOADING, TRANSPORTATION, INSURANCE CHARGES,\nUNLOADING Etc.\n(4.0100) Loading, Inland Transportation including port handling, port clearance, port chargess, Inland Transit Insurance charges, unloading, Storage at site, handling, preservation charges etc. for all E & M works\n(4.0106) COMPRESSED AIR & PLANT WATER SYSTEM | item26 | 1 | Lot |
27 | 27 | 4.0) LOADING, TRANSPORTATION, INSURANCE CHARGES,\nUNLOADING Etc.\n(4.0100) Loading, Inland Transportation including port handling, port clearance, port chargess, Inland Transit Insurance charges, unloading, Storage at site, handling, preservation charges etc. for all E & M works\n(4.0107) HVAC & FIRE FIGHTING SYSTEM | item27 | 1 | Lot |
28 | 28 | (4.0) LOADING, TRANSPORTATION, INSURANCE CHARGES,\nUNLOADING Etc.\n(4.0100) Loading, Inland Transportation including port handling, port clearance, port chargess, Inland Transit Insurance charges, unloading, Storage at site, handling, preservation charges etc. for all E & M works\n(4.0108) ELECTRICAL, CONTROL & INSTRUMENTATION | item28 | 1 | Lot |
29 | 29 | (4.0) LOADING, TRANSPORTATION, INSURANCE CHARGES,\nUNLOADING Etc.\n(4.0100) Loading, Inland Transportation including port handling, port clearance, port chargess, Inland Transit Insurance charges, unloading, Storage at site, handling, preservation charges etc. for all E & M works\n(4.0109) ANY OTHER ITEMS | item29 | 1 | Lot |
30 | 30 | (4.0) LOADING, TRANSPORTATION, INSURANCE CHARGES,\nUNLOADING Etc.\n(4.0100) Loading, Inland Transportation including port handling, port clearance, port chargess, Inland Transit Insurance charges, unloading, Storage at site, handling, preservation charges etc. for all E & M works\n(4.0110) SUPPLY OF MANDATORY SPARES | item30 | 1 | Lot |
31 | 31 | (5.0) ERECTION, TESTING AND COMMISSIONING CHARGES INCLUDING STORAGE CUM ERECTION INSURANCE\n(5.0100) MAIN EQUIPMENT INCLUDING FACTORY FABRICATED STEEL\nSTRUCTURES\n | item31 | 1 | Lot |
32 | 32 | (5.0) ERECTION, TESTING AND COMMISSIONING CHARGES INCLUDING STORAGE CUM ERECTION INSURANCE\n(5.0200) CIVIL & ARCHITECTURAL WORKS | item32 | 1 | Lot |
33 | 33 | (5.0) ERECTION, TESTING AND COMMISSIONING CHARGES INCLUDING STORAGE CUM ERECTION INSURANCE\n(5.0300) INFRASTRUCTURE WORKS | item33 | 1 | Lot |
34 | 34 | (5.0) ERECTION, TESTING AND COMMISSIONING CHARGES INCLUDING STORAGE CUM ERECTION INSURANCE\n(5.0400) FGD FACILITIES | item34 | 1 | Lot |
35 | 35 | (5.0) ERECTION, TESTING AND COMMISSIONING CHARGES INCLUDING STORAGE CUM ERECTION INSURANCE\n(5.0600) OTHER WORKS \n(Not covered in the above items\nbut required to cover complete scope of works)\n | item35 | 1 | Lot |
36 | 36 | (6.0) TYPE TEST CHARGES\n(6.0100) Type Test charges for all\nElectro-Mechanical equipments\n | item36 | 1 | Lot |
37 | 37 | (7.0) IMPARTING TRAINING\n(7.0100) Imparting Training to\nOwner's personnal at project site\n | item37 | 1 | Lot |
38 | 38 | (8.0) ANY OTHER ACTIVITY NOT LISTED ABOVE\n(8.0100) Any other activity not listed above but required for the safe and successful operation of the plant as per\nthe scope of supply\n | item38 | 1 | Lot |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail