| 1 | 1 | Loading of 7.5 Mtr /8.0 Mtr poles | item 1 | 180 | E |
|---|
| 2 | 2 | Loading of 9.14 Mtr poles / 9 Mtr PSC pole | item 2 | 45 | E |
|---|
| 3 | 3 | Loading of 9M Square Poles / R.S.Joist /Tubular Poles upto 9.14 Mtr upto 32 feet | item 3 | 20 | E |
|---|
| 4 | 4 | Loading of R.S.Joist /Tubular Poles above 9.14 Mtr poles | item 4 | 11 | E |
|---|
| 5 | 5 | Unloading of 7.5 Mtr /8.0 Mtr poles | item 5 | 180 | E |
|---|
| 6 | 6 | Unloading of 9.14 Mtr poles / 9 Mtr PSC poles | item 6 | 45 | E |
|---|
| 7 | 7 | Unloading of 9M Square Poles / R.S.Joist /Tubular Poles upto 9.14 Mtr upto 32 feet poles | item 7 | 20 | E |
|---|
| 8 | 8 | Unloading of R.S.Joist /Tubular Poles above 9.14 Mtr poles | item 8 | 11 | E |
|---|
| 9 | 9 | Excavation of 7.5Mtr / 8.0 Mtr Poles (1.25 X 0.6 X 1.5M) (ORDINARY SOIL) | item 9 | 180 | Per / Pit |
|---|
| 10 | 10 | Erection of 7.5 Mtr/8.0 Mtr Poles (ORDINARY SOIL) | item 10 | 45 | E |
|---|
| 11 | 11 | Excavation of 9.14 Mtr Poles /9.0 Mtr PSC Poles- All Metal poles (1.25x 0.6x1.83M) (ORDINARY SOIL) | item 11 | 20 | Per / Pit |
|---|
| 12 | 12 | Erection of 9.14 Mtr Poles /9.0 Mtr PSC Poles-All Metal poles (ORDINARY SOIL) | item 12 | 11 | E |
|---|
| 13 | 13 | Excavation of poles pits for 9 mtr square poles/ above 9.14 mtr poles - all metal poles in ordinary soil | item 13 | 20 | Per / Pit |
|---|
| 14 | 14 | Erection of 9 mtr square poles/ above 9.14 mtr poles- all metal poles (ORDINARY SOIL) | item 14 | 20 | E |
|---|
| 15 | 15 | Mass concreting for pole 0.6Mx0.60Mx1.25M (Including Jelly, Sand Cement supplied by the Contractor) | item 15 | 24 | E |
|---|
| 16 | 16 | Sleeve concreting for poles 0.6M X 0.6M 0.3M (Including Jelly, Sand Cement supplied by the Contractor) | item 16 | 180 | E |
|---|
| 17 | 17 | Sleeve concreting for Stay set - 0.3M dia and 0.75 long (Including Jelly, Sand Cement supplied by the Contractor) | item 17 | 70 | E |
|---|
| 18 | 18 | Mass concreating with Coping of structure pole set (Including Jelly, Sand Cement supplied by the Contractor) | item 18 | 24 | E |
|---|
| 19 | 19 | Excavation of Stay Pit (0.95 X 0.6 X 1.2 M) Ordinary soil | item 19 | 70 | Per / Pit |
|---|
| 20 | 20 | Stay set Erection complete without stay pit Excavation | item 20 | 70 | Set |
|---|
| 21 | 21 | Stay erection without rod and pit | item 21 | 20 | Set |
|---|
| 22 | 22 | Stay rod erection | item 22 | 10 | Set |
|---|
| 23 | 23 | Numbering of poles with paint back ground and yellow letters incl cost of paint / pole | item 23 | 256 | per loc |
|---|
| 24 | 24 | Fixing of LT Sph Cross Arm/ HT TI Fitting / LT TI Fitting | item 24 | 70 | E |
|---|
| 25 | 25 | Fixing of LT 3ph Cross Arm | item 25 | 100 | E |
|---|
| 26 | 26 | Fixing of 3' - 6\" \"V\" Cross Arm | item 26 | 15 | E |
|---|
| 27 | 27 | Fixing of 4' - 6\" \"V\" Cross Arm | item 27 | 9 | E |
|---|
| 28 | 28 | Fixing of 5' \"V\" Cross arm | item 28 | 1 | E |
|---|
| 29 | 29 | Fixing of tapping Channel / Guarding Cross Arm | item 29 | 90 | E |
|---|
| 30 | 30 | Fixing of Top Channel | item 30 | 15 | E |
|---|
| 31 | 31 | Fixing of Cross bracing | item 31 | 6 | Set |
|---|
| 32 | 32 | Fixing of 11 KV Pin insulator | item 32 | 100 | E |
|---|
| 33 | 33 | Fixing of 11 KV Disc | item 33 | 15 | E |
|---|
| 34 | 34 | Fixing of 33KV Pin Insulator/PT insulator | item 34 | 1 | E |
|---|
| 35 | 35 | Fixing of 33KV Disc | item 35 | 1 | E |
|---|
| 36 | 36 | Fixing of LT Pin insulator | item 36 | 400 | E |
|---|
| 37 | 37 | Fixing of LT Shackle | item 37 | 50 | E |
|---|
| 38 | 38 | Fixing of Aluminium Knob | item 38 | 150 | E |
|---|
| 39 | 39 | Fixing of Double V X arm | item 39 | 25 | E |
|---|
| 40 | 40 | Converting pin point into cut point in HT Lines | item 40 | 15 | Loc |
|---|
| 41 | 41 | Converting pin point into cut point in LT Lines | item 41 | 50 | Loc |
|---|
| 42 | 42 | Double channel cross arm | item 42 | 6 | Loc |
|---|
| 43 | 43 | For 7/3.35 ACSR Rabbit (span length more than 30M) -HT / LT Line Stringing, sagging, binding, jumbering including transporting of materials from road site to site | item 43 | 10 | (Per span/ Wire) |
|---|
| 44 | 44 | For 7/3.35 ACSR Rabbit (span length less than 30M) -HT / LT Line Stringing, sagging, binding, jumbering including transporting of materials from road site to site | item 44 | 5 | (Per span/ Wire) |
|---|
| 45 | 45 | For 7/4.09 ACSR - Raccon(Per Span / Wire) (span length more than 30M) - HT Line Stringing, sagging, binding, jumbering including transporting of materials from road site to site | item 45 | 20 | (Per span/ Wire) |
|---|
| 46 | 46 | For 7/4.09 ACSR - Raccon(Per Span / Wire) (span length less than 30M) - HT Line Stringing, sagging, binding, jumbering including transporting of materials from road site to site | item 46 | 20 | (Per span/ Wire) |
|---|
| 47 | 47 | For 7/2.59 ACSR - Weasel (Per Span / Wire) (span length more than 30M) - LT Line Stringing, sagging, binding, jumbering including transporting of materials from road site to site | item 47 | 20 | (Per span/ Wire) |
|---|
| 48 | 48 | For 7/2.59 ACSR - Weasel (Per Span / Wire) (span length less than 30M) - LT Line Stringing, sagging, binding, jumbering including transporting of materials from road site to site | item 48 | 20 | (Per span/ Wire) |
|---|
| 49 | 49 | For line clear works | item 49 | 0.5 | works |
|---|
| 50 | 50 | Cradle guarding including earthing and earth pit excavation. | item 50 | 10 | per span |
|---|
| 51 | 51 | Flat guarding | item 51 | 25 | per span |
|---|
| 52 | 52 | Split Neutral guarding | item 52 | 5 | per span |
|---|
| 53 | 53 | Erection of Transformer above 25 KVA | item 53 | 12 | Nos |
|---|
| 54 | 54 | Erection of Transformer centre support (including of concrete) | item 54 | 3 | Nos |
|---|
| 55 | 55 | Erection of Transformer - metering set of various capacities with Departmental crane | item 55 | 3 | Nos |
|---|
| 56 | 56 | Transporting of Distribution transformer - Above 30 KM to 60 Km | item 56 | 12 | KM |
|---|
| 57 | 57 | Loading /Unloading of DTs upto 100KVA at field and stores with Department Crane | item 57 | 12 | E |
|---|
| 58 | 58 | Loading /Unloading of DTs Above 100KVA up to 250 KVA at field and stores with Department Crane | item 58 | 5 | E |
|---|
| 59 | 59 | Loading /Unloading of DTs Above 250KVA up to 500 KVA at field and stores with Department Crane | item 59 | 3 | E |
|---|
| 60 | 60 | Labour for manufacturing of back clamps / Stay clamps altering of clamps with holes and cutting | item 60 | 200 | E |
|---|
| 61 | 61 | Labour for Alterations of back clamps / Stay clamps with holes and cutting | item 61 | 200 | E |
|---|
| 62 | 62 | Providing of holes | item 62 | 200 | E |
|---|
| 63 | 63 | Gas Cutting of Flat/Pipes | item 63 | 150 | E |
|---|
| 64 | 64 | DOUBLE POLE DT STRUCTURE - Fixing of HT/LT LAS with jumpering and earthing | item 64 | 12 | E |
|---|
| 65 | 65 | DOUBLE POLE DT STRUCTURE - Erection of 11KV HG Fuse complete used for double pole structure | item 65 | 12 | Set |
|---|
| 66 | 66 | DOUBLE POLE DT STRUCTURE - Erection of 11KV AB Switch set complete for double pole structure | item 66 | 12 | E |
|---|
| 67 | 67 | DOUBLE POLE DT STRUCTURE - Erection of DT Structure Materials such as top channel, transformer seating channel, belting angle etc, complete | item 67 | 12 | E |
|---|
| 68 | 68 | DOUBLE POLE DT STRUCTURE - Erection of LT Open type fuse unit arrangements double | item 68 | 12 | Set |
|---|
| 69 | 69 | DOUBLE POLE DT STRUCTURE - Erection of support insulator angle and erection of 3Nos.Pin Insulators | item 69 | 12 | Set |
|---|
| 70 | 70 | DOUBLE POLE DT STRUCTURE - Erection of LT Busbar /cable wiring arrangement complete | item 70 | 12 | Set |
|---|
| 71 | 71 | DOUBLE POLE DT STRUCTURE - Erection of HT jumpering arrangement complete | item 71 | 12 | STR |
|---|
| 72 | 72 | DOUBLE POLE DT STRUCTURE - Erection of seating channel with stud arrangement | item 72 | 12 | Set |
|---|
| 73 | 73 | DOUBLE POLE DT STRUCTURE - Leveling of Transformer Structure yard and providing cut stone or brick on edge and spreading one layer of 40 mm metal etc, complete (Excluding material ) | item 73 | 12 | LS |
|---|
| 74 | 74 | Single pole DT Structure - Erection of HG Fuse 11KV solid core type | item 74 | 3 | Str |
|---|
| 75 | 75 | Single pole DT Structure - Erection of 11 KV 200 Amp single break GOS | item 75 | 3 | Str |
|---|
| 76 | 76 | Single pole DT Structure - Single pole TC set suitable for 25 KVA Transformer | item 76 | 3 | Str |
|---|
| 77 | 77 | Single pole DT Structure - Erection of LT protection kit | item 77 | 3 | Str |
|---|
| 78 | 78 | Single pole DT Structure - Numbering of poles with paint | item 78 | 3 | Pole |
|---|
| 79 | 79 | Single pole DT Structure - Erection of seating channel with stud suitable for 16KVA, 25KVA | item 79 | 3 | Nos |
|---|
| 80 | 80 | Single pole DT Structure - Erection of MCB box with fuse unit | item 80 | 3 | Nos |
|---|
| 81 | 81 | Tree clearance before executing the work (required labour may be for approved from concern EE's) | item 81 | 420 | loc |
|---|
| 82 | 82 | EARTHING - D.T Structure earthing and grounding complete including all works | item 82 | 75 | E |
|---|
| 83 | 83 | EARTHING - Excavation of earth pit and erection of 3Nos earth pipes and earth refilling with salt, coal etc., complete (including Cost of coal , salt and troughs supplied by the contractor) | item 83 | 75 | Set |
|---|
| 84 | 84 | Earthing of Pole including burrying, looping and binding | item 84 | 100 | Loc |
|---|
| 85 | 85 | Replacement of detoriated earth pipe only | item 85 | 100 | E |
|---|
| 86 | 86 | writing of danger board / Name board incl cost of thin seat & paint | item 86 | 50 | Loc |
|---|
| 87 | 87 | Painting of Transformer structure Materials complete (Double coat) | item 87 | 21 | Str |
|---|
| 88 | 88 | Painting of Distribution transformer only (Double coat) | item 88 | 21 | Each |
|---|
| 89 | 89 | Painting of Pole ( colour washing with emulsion on labour only) (double coat) | item 89 | 42 | Pole |
|---|
| 90 | 90 | Providing of Details of transformer name board including painting cost of MS Sheet writing etc complete and in the seating channel | item 90 | 21 | LS |
|---|
| 91 | 91 | ESI | item 91 | 3.25 | % |
|---|
| 92 | 92 | EPF | item 92 | 13.36 | % |
|---|
| 93 | 93 | GST | item 93 | 18 | % |
|---|