| 1 | 1 | Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). | | 50 | no |
|---|
| 2 | 2 | Loading HT 'A' type pole from the stacking place and unloading the same at work site (transport by vehicle). | | 13 | no |
|---|
| 3 | 3 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. | | 16 | trip |
|---|
| 4 | 4 | Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. | | 42 | no |
|---|
| 5 | 5 | Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. | | 1 | no |
|---|
| 6 | 6 | Fitting and erecting one HT 'A' type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. | | 9 | no |
|---|
| 7 | 7 | Fitting and erecting one HT DP using 'A' type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. | | 2 | no |
|---|
| 8 | 8 | Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit. | | 48 | no |
|---|
| 9 | 9 | Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit. | | 5 | no |
|---|
| 10 | 10 | Additional rate for providing one disc set on any type of HT pole for making cut point. | | 96 | no |
|---|
| 11 | 11 | Fitting one LT 2 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line. | | 3 | no |
|---|
| 12 | 12 | Fitting one LT 4 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line. | | 8 | no |
|---|
| 13 | 13 | Fitting one set AB switch and giving connection | | 2 | no |
|---|
| 14 | 14 | Dismantling one section fuse | | 3 | no |
|---|
| 15 | 15 | Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt&nut etc. | | 3 | no |
|---|
| 16 | 16 | Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. cutting and removing tree branches wherever necessary. | | 1.8 | km |
|---|
| 17 | 17 | Fitting one Additional V cross arm in existing single pole incl. conveyance of materials. | | 11 | no |
|---|
| 18 | 18 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials. | | 52 | no |
|---|
| 19 | 19 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials. | | 4 | no |
|---|
| 20 | 20 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl. digging & back filling pits. | | 1 | no |
|---|
| 21 | 21 | Fitting one additional HT pin with insulator | | 3 | no |
|---|
| 22 | 22 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. | | 45 | no |
|---|
| 23 | 23 | Dismantling (without damage) LT stay incl. digging pit in all classes of soil and backfilling | | 38 | no |
|---|
| 24 | 24 | Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. | | 35 | no |
|---|
| 25 | 25 | Reshackling one span LT 3ph 4 wire OH line, replacing insulators, tightening stay, cutting tree branches incl. conveyance. | | 26 | no |
|---|
| 26 | 26 | Reshackling one span LT Sph 2 wire OH line, replacing insulators, tightening stay, cutting tree branches incl. conveyance. | | 16 | no |
|---|
| 27 | 27 | Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling. | | 5 | no |
|---|
| 28 | 28 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. | | 57 | no |
|---|
| 29 | 29 | Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification). | | 13 | no |
|---|
| 30 | 30 | Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting. | | 30 | no |
|---|
| 31 | 31 | Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion. | | 57 | no |
|---|
| 32 | 32 | Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion. | | 5 | no |
|---|
| 33 | 33 | Fitting one Additional 2.4m/3m Channel cross arm (75x40x6mm), in existing 11kV DP incl. conveyance of materials. | | 19 | no |
|---|
| 34 | 34 | Providing Bucket type cradling for one span 11kV line. | | 4 | no |
|---|
| 35 | 35 | Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. | | 2 | no |
|---|
| 36 | 36 | Pole numbering using printed Aluminium sheets / Painting the surface of pole with anti algal yellow paint and painting Letters with black paint as specified incl. cost of paint. | | 57 | no |
|---|
| 37 | 37 | Traffic signal painting of pole 1.5m height using black and white paints in alternate rings of 25cm width incl. cost of paint as specified. | | 57 | no |
|---|