| 1 | 0 | Note : All unserviceable materials obtained out of demolition/dismantling/taking down (other than those for which credit catered under Schedule of credit) shall be disposed of outside MoD Land. Quoted rates against respective item shall deemed to include for same. | | | |
|---|
| 2 | 1 | Demolition of brick work/PCC block masonry or stone/ boulder masonry, built in cement mortar or cement lime mortar including all quoins, arches, pillars etc but excluding ashlar facing dressed stone work and precast concrete articles complete all as specified and directed. | | 5 | Cubic\nMetre |
|---|
| 3 | 2 | Demolition of cement concrete (un-reinforced) in ground floors and pavings not exceeding 15 cm thickness below or above ground level and removal all rubbish material complete all as directed. | | 5 | Cubic\nMetre |
|---|
| 4 | 3 | Demolition of reinforced cement concrete (reinforcement cut as required to facilitate demolition) in any position not otherwise specifically provided for and removal all rubbish material complete all as directed. | | 10 | Cubic\nMetre |
|---|
| 5 | 4 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises complete all as specified and directed. | | 88 | Square\nMetre |
|---|
| 6 | 5 | Taking down cement or cement lime plaster any description, on brick or stone walls, etc. including raking out joints, hacking for key & scrubbing down with water, etc. & removing rubbish off the premises, complete all as directed. | | 60 | Square\nMetre |
|---|
| 7 | 6 | Dismantling of PVC(SWR) drain pipe alongwith fittings and accessories and taking out from walls, floors or from trenches, if required complete all as specified and directed for following sizes:- \n(Note :- The length shall be measured along the centre line including fittings and accessoires}. | | | |
|---|
| 8 | 6.1 | 75mm dia | | 30 | Running Metre |
|---|
| 9 | 6.2 | 110mm dia | | 160 | Running Metre |
|---|
| 10 | 7 | Dismantling of cast iron (sand cast) soil, waste and vent pipe upto 100mm bore alongwith fittings and accessories jointed in cement mortar and taking out from walls, floors or from trenches, if required including removing vegetation growth around pipes as required, making good surface to match with existing including necessary scaffolding complete all as specified and directed. \n(Note :- The length shall be measured along the centre line including fittings and accessoires). | | 24 | Running Metre |
|---|
| 11 | 8 | Demolition and breaking up drain pipes (salt glazed stone ware, AC or reinforced concrete) set in cement mortar including PCC bedding and haunching etc complete all as specified and directed. | | | |
|---|
| 12 | 8.1 | 150mm bore SGSW pipe | | 250 | Running Metre |
|---|
| 13 | 9 | Excavation in trenches, n exc 1.5 m wide and n exc 1.5 m in depth or n exc 10 Sqm on plan and n exc 1.5 m in depth & getting out, for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, pipe lines etc. in soft/ loose soil, complete all as specified & directed. | | 50 | Cubic\nMetre |
|---|
| 14 | 10 | Excavation in trenches not exceeding 1.5m wide and exceeding 1.5m but not exceeding 3m in depth or not exc 10sqm on plan & getting out for foundation etc or for shafts wells, cesspits, manholes pier holes, sewage line etc in soft / loose soil complete all as specified and directed | | 5 | Cubic\nMetre |
|---|
| 15 | 11 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25 cms thick in soft / loose soil complete all as specified and directed. | | 50 | Cubic\nMetre |
|---|
| 16 | 12 | Removing excavated surplus material to a distance not exceeding 50 mtr and depositing where directed at a level not exceeding 1.5m above the starting point complete all as specified and directed. | | 5 | Cubic\nMetre |
|---|
| 17 | 13 | M & L for precast cement concrete block masonry 1:3:6 Type C-1 using 20mm graded stone aggregate with solid blocks, exc. 10 cm in width and setting in cement mortar 1:6 complete all as specified and directed.\n | | 5 | Cubic\nMetre |
|---|
| 18 | 14 | M & L for cement concrete type B-1, 1:2:4 (using 20 mm graded stone aggregate) as in lintels upto 1.5m clear span, steps, seismic and other similar bands, bed plates, road side kerbs, coping/cills, bed block for embedding hold fast etc including necessary form work, weathering, slightly rounded or chamfered angles and throating complete all as directed. | | 1.5 | Cubic\nMetre |
|---|
| 19 | 15 | M & L providing precast cement concrete 1:2:4 type B1 (using 20mm graded stone aggregate) as in landings, cover slabs (for man holes etc.) chullah hoods, chajjas, water troughs, mangers, shelves and similar articles with plain faces joint as directed and setting in CM 1:4 complete all as specified and directed.\n(Note :- Reinforcement shall be measured and paid for separately under respective items of the BOQ.) | | 10 | Cubic\nMetre |
|---|
| 20 | 16 | Supply only integral water proofing compound ISI marked as approved complete all as specified and directed. | | 15 | Kilogram |
|---|
| 21 | 17 | M & L for TMT bars 6mm to 8mm dia, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified and directed. | | 500 | Kilogram |
|---|
| 22 | 18 | M & L for screed bed or bedding layer of mortar, 15 mm thick, in cement mortar 1:6, for laying floor finishes complete all as specified and directed. | | 75 | Square\nMetre |
|---|
| 23 | 19 | M & L for non skid ceramic tiles (coloured) 7 to 8mm thick (square/rectangular) area of each tile exceeding 0.06 sqm but not exceeding 0.11 sqm as in floors, set and jointed in neat cement slurry and pointed in white or coloured cement to match the shade of tiles complete all as specified and as directed. | | 75 | Square\nMetre |
|---|
| 24 | 20 | M & L for rendering 10mm thick in cement mortar 1:3 on fair faces of brick or concrete surfaces finished even and rough for receiving wall tiles/dado complete all as specified and directed. | | 13 | Square\nMetre |
|---|
| 25 | 21 | M&L for 15mm thick rendering in cement mortar 1:4 on fair faces of brick work or concrete surfaces, surfaces mixed with WPC 3% by wt of cement and finished even and smooth without using extra cement complete all as specified and directed.\n(Note :- Supply only WPC shall be measured and paid separately) | | 85 | Square\nMetre |
|---|
| 26 | 22 | M & L for glazed ceramic tiles (coloured) 7 to 8mm thick (square/rectangular) area of each tile exceeding 0.11 sqm but not exceeding 0.18 sqm as on vertical surfaces such as skirting or dado set & jointed in neat cement slurry & pointed in coloured cement to match the shade of tiles complete all as specified and directed. | | 13 | Square\nMetre |
|---|
| 27 | 23 | S & F PVC (SWR) pipes single socketed in any length with rubber ring joints fixed to walls complete all as specified and directed for following sizes:- | | | |
|---|
| 28 | 23.1 | 75mm bore | | 30 | Running Metre |
|---|
| 29 | 23.2 | 110mm bore | | 160 | Running Metre |
|---|
| 30 | 24 | S & F PVC (SWR) bend of any radius with oval access door complete all as specified for following sizes:- | | | |
|---|
| 31 | 24.1 | 75mm bore | | 25 | EACH |
|---|
| 32 | 24.2 | 110mm bore | | 45 | EACH |
|---|
| 33 | 25 | S & F cast iron(sand cast), soil, waste and vent pipe in any length with or without ears with cement joints , fixed to wall complete all as specified and directed for following sizes :- | | | |
|---|
| 34 | 25.1 | 75 mm dia | | 6 | Running Metre |
|---|
| 35 | 25.2 | 100 mm dia | | 6 | Running Metre |
|---|
| 36 | 26 | S & F cast iron(sand cast), soil, waste and vent pipe in any length with or without ears with cement joints laid in trenches or in floors complete all as specified and directed for following sizes:- | | | |
|---|
| 37 | 26.1 | 75 mm dia | | 6 | Running Metre |
|---|
| 38 | 26.2 | 100 mm dia | | 6 | Running Metre |
|---|
| 39 | 27 | S & F in repairs PVC (SWR) junction, single (single T) equal or unequal complete all as specified and directed for following sizes:- | | | |
|---|
| 40 | 27.1 | 75 mm dia | | 15 | EACH |
|---|
| 41 | 27.2 | 100 mm dia | | 35 | EACH |
|---|
| 42 | 28 | S & F in repairs cast iron Nahani trap 100mm dia outlet with stainless steel grating suitable for floor trap including jointing to waste pipe fixed in cement concrete 1:2:4, type B-1 complete all as directed. | | 15 | EACH |
|---|
| 43 | 29 | M & L for salt glazed stoneware drain pipes grade 'A' ISI marked 150mm internal diameter laid in trenches and jointed complete all as directed. | | 250 | Running Metre |
|---|
| 44 | 30 | S & F reinforced concrete pipes, class NP-2, laid and jointed complete with collars and tested complete all as specified and directed for following bore pipes:- | | | |
|---|
| 45 | 30.1 | 300mm dia | | 250 | Running Metre |
|---|
| 46 | 31 | M & L for PCC 1:3:6 type C-2 (using 40 mm graded stone aggregate) as in bedding to SGSW/NP-2 drain pipe of any dia including packing under and haunching against the sides of the pipes after they are laid and tested complete all as specified and directed. | | 200 | Running Metre |
|---|
| 47 | 32 | M & L for cleaning and clearing of blocked pipe between floor/nahani trap and Gully trap or between water closet and First Manholes by removing accumulated sludge/mud including cleaning and clearing of floor/nahani trap and Gully trap or water closet and First Manholes on either side and disposing off the accumulated sludge/mud to a distance not exceeding 100m, buried in ground to maintain hygine complete all as directed. | | 185 | EACH\nJOB |
|---|
| 48 | 33 | Cleaning and clearing of underground sewage line (including manholes by taking off manholes covers and re-fixing the same after cleaning) of any description, underground and any depth by removing any type of blockage including de-silting and de-choking cleaning of blockage manually by rodding and removing the deposited sludge/solid/liquid material outside MD land complete. \nNote: 1. Contractor shall clean within 48 hours after the requirement has been notified. \n2. If contractor fails to attend and removev blockage within 48 hours then a penal recovery shall be charged as under:- \nDelay after 48 hours (a) one day - Rs. 1000/- \n(b) Two days - Rs 2000/-, \n(c ) Three days and more - Rs 5000/- | | 3500 | RM |
|---|
| 49 | 34 | M & L for cleaning and clearing of existing septic tanks any size/depth by bailing out effluent, removing the silt/sludge & other deposits mechanically with combined high pressure water jetting cum suction (vacuum) type machine mounted on LCV/HCV and having facilities of high pressure water thermoplastic fiber braided water jetting hose and through conical/round shape nozzle pipe and flushing after cleaning and removing the silt/sludge & other deposits and transporting the same in covered van/trolley outside MD land, excavating pit and safely buried the same in pit, top portion of pit covered with soil and excess soil spreaded evenly or removed to a distance not exceeding 50m, appllying bleaching powder to maintain hygine and writing particulars of cleaning done with synthetic enamel paint on septic tanks complete all as directed. \n(Notes :- (i) Volume occupied by silt/sludge & other deposits (Semi solids) shall only be measured and paid for against the item.\n(ii) Volume occupied by effluent (liquid above silt/sludge & other deposits) shall not be measured and paid. However quoted rates shall be deemed to be includde for bailing out of effluent.) | | 235 | Cubic\nMetre |
|---|