| 1 | 1 | PART_A (Quoted % not allowed on PART-A) | a12 | | |
|---|
| 2 | 2 | Round the clock operation and minor maintenance of all Electro-mechanical equipments like fountain, deep tube-well pump, of Entire park (I,II & III) as per direction of the EIC. a)Total 7 nos semi skilled lobour for 01 month i.e 7 X 1 = 7 Man/month. (Category of labour i.e Skilled or Semi Skilled is case specific as per actual site condition.) | a13 | | |
|---|
| 3 | 2.01 | For the period of First year | a14 | 84 | Per Man/ Month |
|---|
| 4 | 2.02 | For the period of Second year | a15 | 84 | Per Man/ Month |
|---|
| 5 | 3 | Round the clock operation and minor maintenance for the additional 4 holidays of the Entire Park(I,II&III) with existing operators as per direction of the EIC. a) Total 7 nos semi skilled lobour for 4 days in a month i.e 7 X 1 = 7 Man /month. (Category of labour i.e Skilled or Semi Skilled is case specific as per actual site condition.) | a16 | | |
|---|
| 6 | 3.01 | For the period of First year | a17 | 84 | Per Man/ Month |
|---|
| 7 | 3.02 | For the period of Second year | a18 | 84 | Per Man/ Month |
|---|
| 8 | 4 | Checking of all the Electrical equipments like LT Panel, Feeder piller box, main switches, lighting pole, light fittings, fans including Fuse, MCB, MCCB etc. and preventive maintenance of all electrical installations as per technical specification and scope of work and direction of the EIC . (Twice a week) [104 nos.in 52 weeks or one year]. | a19 | | |
|---|
| 9 | 4.01 | For the period of First year | a20 | 104 | Each |
|---|
| 10 | 4.02 | For the period of Second year | a21 | 104 | Each |
|---|
| 11 | 5 | Supervision of all the staffs & look-after the entire Park to ascertain the overall condition of all the electro-mechnical equipments of the entire Park (I,II & III) and conveying the same to the EIC or his authorized representative and to carry out the instructions given by them within the stipulated time frame. (Twice a week) [ 104 nos.in 52 weeks or one year]. | a22 | | |
|---|
| 12 | 5.01 | For the period of First year | a23 | 104 | Each |
|---|
| 13 | 5.02 | For the period of Second year | a24 | 104 | Each |
|---|
| 14 | 6 | Add: Labour Welfare Cess @ 1% on Part-A | a25 | 1 | cess |
|---|
| 15 | 7 | PART_B | a26 | | |
|---|
| 16 | 8 | Supplying of the following consumable materials for minor maintenance of all the Electro-mechanical equipments | a27 | | |
|---|
| 17 | 8.01 | 125 Amp, 415 V TPN Main switch with fuse on L&N. (Make : HPL) | a28 | 3 | Each |
|---|
| 18 | 8.02 | Indicating Lamp for Panel only | a29 | 30 | Each |
|---|
| 19 | 8.03 | HRC fuse link (2-16) Amp | a30 | 20 | Each |
|---|
| 20 | 8.04 | HRC Fuse 32 Amp HF type | a31 | 20 | Each |
|---|
| 21 | 8.05 | Fuse Holder 20 Amp | a32 | 20 | Each |
|---|
| 22 | 8.06 | Fuse holder 63 Amp (both side cable) | a33 | 20 | Each |
|---|
| 23 | 8.07 | Single core Cu Conductor 2.5 mm | a34 | 4 | Roll |
|---|
| 24 | 8.08 | Supply of MCB (6-32) Amp | a35 | 10 | Each |
|---|
| 25 | 8.09 | Supply of Champion Brand 40 WT/L \n(PHE Schedule) | a36 | 30 | Each |
|---|
| 26 | 9 | S,F& replacement of 40 watt choke \nfor fluorescent tube light including removing and refixing of luminaries as required. | a37 | 20 | Each |
|---|
| 27 | 10 | S&F, replacement of starter for fluorescent tube light. | a38 | 20 | Each |
|---|
| 28 | 11 | Security Lighting Arrangement on hire and temporary basis for two times in a year and for the period of three calendar years :- | a39 | | |
|---|
| 29 | 11.01 | Supplying and providing on hire basis 400 Watt (white colour) metal halide / 200 watt LED luminaries complete with all accessories including lamp, wire, cable etc. and commissioning & dismantaling the same after stipulated period as per direction of the EIC. a) 1 st Night (55 set x 2 times per year x 2 years) | a40 | 220 | Set |
|---|
| 30 | 11.02 | b) Subsequent Nights ( 6 Nights x 220) | a41 | 1320 | Per Set Per Night |
|---|
| 31 | 12 | Add: Labour Welfare Cess @ 1% on Part B | a42 | 1 | cess |
|---|