| 1 | 1 | Earth work in excavation of foundation in all type of soil with lead up to 30 M lift up to 1.50 M with back filling i/c cost of all material Labour T & P etc. required. For proper completion of work. | BI01010001010000000000000515BI0100001113 | 645 | M³ |
|---|
| 2 | 2 | Hiring 5 HP Diesel pump for dewatering including suction pipe its cartage POL and operator etc. complete work. | BI01010001010000000000000515BI0100001114 | 320 | Hrs. |
|---|
| 3 | 3 | P/L Cement Concrete 1:3:6 in Foundation with (1 Cement, 3 Coarse sand & 6 Stone aggregate 20mm to 40mm size) including cost of all material Labour, T & P etc. required for proper completion of the work as per direction of E/I. | BI01010001010000000000000515BI0100001115 | 41 | M³ |
|---|
| 4 | 4 | Providing & Fixing Centering and shuttering for R.C.C work including rent of shuttering material, cost of nails and also i/c all labour and T&P required for proper completion of the work as per direction of E/I. | BI01010001010000000000000515BI0100001116 | 539 | M² |
|---|
| 5 | 5 | Providing, strengthening, cutting, bending, binding and placing of Tor steel reinforcement, including supply of all required material, labour and T&P required for proper completion of work as per direction of Engineer-in-charge. | BI01010001010000000000000515BI0100001124 | | |
|---|
| 6 | 5.01 | 20 mm dia Steel Bar | BI01010001010000000000000515BI0100001125 | 1870 | Kg |
|---|
| 7 | 5.02 | 16 mm dia Steel Bar | BI01010001010000000000000515BI0100001126 | 2454 | Kg |
|---|
| 8 | 5.03 | 12 mm dia Steel Bar | BI01010001010000000000000515BI0100001126 | 2040 | Kg |
|---|
| 9 | 5.04 | 10 mm dia Steel Bar | BI01010001010000000000000515BI0100001127 | 6123 | Kg |
|---|
| 10 | 5.05 | 8 mm dia Steel Bar | BI01010001010000000000000515BI0100001126 | 403 | Kg |
|---|
| 11 | 6 | P/L R.C.C. with cement coarse sand and 20 mm gauge approved stone aggregate in the proportion of 1:1.5:3 (1 Cement, 1.5 Coarse sand & 3 Stone aggregate 20mm size) in footings, vertical member and slab etc. excluding supply of reinforcement and its fixing and binding the same but including supply of all materials, labour and tools and plants etc. required for proper completion of the works. As per direction of E/I. Cost of binding wire shall also be included in this Item. | BI01010001010000000000000515BI0100001117 | 173 | M³ |
|---|
| 12 | 7 | Brick Work in 1:3 cement and c. sand mortar with M-150 Bricks including cost of all material, labour and T&P etc. all Complete the work as direction of Engineer-in-Charge. | BI01010001010000000000000515BI0100001115 | 19 | M³ |
|---|
| 13 | 8 | Providing and laying 19mm thick bituminous board for expansion joint. All complete the work as per direction of Engineer-in-charge. | BI01010001010000000000000515BI0100001116 | 4 | M² |
|---|
| 14 | 9 | Supply and fixing 100 mm dia P.V.C spout pipe i/c all required labour, material and T&P to complete the work. Class-B standard make Kisan or equivalent | BI01010001010000000000000515BI0100001117 | 14 | Rmt. |
|---|
| 15 | 10 | Providing and Laying 150 mm thick brick ballast 25 to 40 mm gauge as filter i/c cost of material labour, T&P etc. all complete the work. | BI01010001010000000000000515BI0100001125 | 25 | M³ |
|---|
| 16 | 11 | Providing and Laying Stone boulder 40 to 60 per kg. wt. i/c cost of material, Royalty, Carriage, toll box and labour, T&P etc. all complete the work. | BI01010001010000000000000515BI0100001126 | 50 | M³ |
|---|
| 17 | 12 | Earth work in correcting section of Canal i/c all lead and lift manual completion and proper dressing & also including all required labour and T&P all complete the work as per direction of E/I. | BI01010001010000000000000515BI0100001126 | 2016 | M³ |
|---|
| 18 | 13 | Earth work in excavation or embankment in Road Diversion including all labour, and T&P required for proper completion of the work as per direction of Engineer-in-charge | BI01010001010000000000000515BI0100001126 | 1950 | M³ |
|---|
| 19 | 14 | Supply and Fixing of NP3 Hume Pipe dia 1200mm including cost of all material, Labour T & P etc. As per direction of Engineer in charge | BI01010001010000000000000515BI0100001128 | 15 | Rm |
|---|