| 1 | 1 | Dismantaling of old Brick work & R.B.Slab including cost of material, labour and T&P etc. | BI01010001010000000000000515BI0100001113 | 3.6 | M³ |
|---|
| 2 | 2 | Earth work in Mar, Ranker & Kankar mixed soil for excavation foundation i/c all cost of labour, materials and T&P etc. | | 60.77 | M³ |
|---|
| 3 | 3 | C.C. 1 : 3: 6 with Stone Grit (20-40 mm) size i/c all cost of labour, materials and T&P etc. | | 17.35 | M³ |
|---|
| 4 | 4 | Brick work in 1:3 cement, mortar including all cost of material, labour and T&P etc. | BI01010001010000000000000515BI0100001115 | 53.05 | M³ |
|---|
| 5 | 5 | C.C. 1 : 2 : 4 with Stone Grit(10-20 mm) size i/c all cost of labour, materials and T&P etc. | BI01010001010000000000000515BI0100001117 | 3.76 | M³ |
|---|
| 6 | 6 | Centering & Shuttering for R.C.C. work i/c all cost of labour, materials and T&P etc. | | 21.98 | M2 |
|---|
| 7 | 7 | Reinforcement for R.C.C work in slab binding placing in position with G.I wire i/c all cost of labour, materials and T&P etc.. | | 0.4 | M.T. |
|---|
| 8 | 8 | R.C.C. 1 : 1.5 : 3 with Stone Grit (10-20 mm) size i/c all cost of labour, materials and T&P etc. | | 5.43 | M³ |
|---|
| 9 | 9 | C.C. 1 : 1.5 : 3 with Stone Grit (10-20 mm) size i/c all cost of labour, materials and T&P etc. | | 1.93 | M³ |
|---|
| 10 | 10 | Deep struck Pointing 1:2 Cement, Mortar including cost of material, labour and T&P etc. | | 94.09 | M2 |
|---|
| 11 | 11 | Painting of Parapet | | 24.27 | M2 |
|---|
| 12 | 12 | P/ fabricating MS Sign board of size 4'x3' using Isa 40x40x5 to be fixed at a level of 3' from ground and 2' deep into the ground with 3\" angle cut and turned to opposite side to make to make a hold fast i/c all cost of labour, material, T&P etc. | | 20 | Kg. |
|---|
| 13 | 13 | Painting sign board i/c lettering & cost of paint. | | 1.08 | M2 |
|---|
| 14 | 14 | Earth work in making road bypass in Mar, Ranker and Kanker mixed soil including lead up to 30.0 M. and lift upto 1.50 M. with manual compaction and dressing etc. | | 261 | M2 |
|---|
| 15 | 15 | Earth work in Removing road bypass in Mar, Ranker and Kanker mixed soil including lead up to 30.0 M. and lift upto 1.50 M. With proper disposal & dressing etc. | BI01010001010000000000000515BI0100001118 | 261 | M2 |
|---|
| 16 | 16 | Proveding and Laying 1st class brick on edge soiling on approch road i/c all cost of Materials labour and T&P etc. | BI01010001010000000000000515BI0100001119 | 25.3 | M2 |
|---|