Work Contract For Overhauling Of Tg Auxiliaries Including Cleaning Of Coolers , Tanks Strainers , Servicing Of Pumps , Repair Replacement Servicing Of Various Valves And Associated Works Of Unit No . 1And2 , 2X600mw At Sstpp , Mppgcl , Dongalia Ove
Tender Overview
Project Description
Work Contract For Overhauling Of Tg Auxiliaries Including Cleaning Of Coolers , Tanks Strainers , Servicing Of Pumps , Repair Replacement Servicing Of Various Valves And Associated Works Of Unit No . 1And2 , 2X600mw At Sstpp , Mppgcl , Dongalia Overhauling Of Tg Auxiliaries Including Cleaning Of Coolers , Tank Strainers , Servicing Of Pumps , Repair Replacement Servicing Of Various Valves And Associated Works Of Unit No . 1And2 , 2X600mw At Sstpp , Mppgcl , Dongalia
BOQ
| Name of Work: Work contract for Overhauling of TG auxiliaries including cleaning of coolers, tank's strainers, servicing of pumps, repair/ replacement/ servicing of various valves & associated works of unit no.1&2, 2X600MW at SSTPP, MPPGCL, Dongalia | |||||
|---|---|---|---|---|---|
| Sl.No. | WORK Description | work No. | Quantity | Units | |
| 1 | 1 | CLEANING OF STRAINERS | |||
| 2 | 1.1 | BP SUCTION STRAINER | work1 | 6 | Nos |
| 3 | 1.2 | BFP SUCTION STRAINER | work2 | 6 | Nos |
| 4 | 1.3 | ACW SELF CLEANING STRAINER / LINE STRAINER | work3 | 4 | Nos |
| 5 | 1.4 | CEP SUCTION STRAINER | work4 | 6 | Nos |
| 6 | 1.5 | DEBRIS FILTERS OF CW SYSTEM | work5 | 8 | Nos |
| 7 | 2 | CLEANING OF TANKS | |||
| 8 | 2.1 | DEAERATOR | work6 | 2 | Nos |
| 9 | 2.2 | DRAIN OIL TANK & CLEAN OIL TANK | work7 | 2 | Nos |
| 10 | 2.3 | MAIN OIL TANK | work8 | 2 | Nos |
| 11 | 2.4 | TDBFP OIL TANK | work9 | 4 | Nos |
| 12 | 2.5 | OVERHEAD MAKE-UP WATER TANK | work10 | 2 | Nos |
| 13 | 2.6 | HOTWELL CLEANING | work11 | 4 | Nos |
| 14 | 2.7 | FEED STORAGE TANK | work12 | 2 | Nos |
| 15 | 3 | CLEANING OF PLATE TYPE HEAT EXCHANGER | |||
| 16 | 3.1 | CORRUGATED SS PLATE TYPE HEAT EXCHANGER(SG) | work14 | 4 | Nos |
| 17 | 3.2 | CORRUGATED SS PLATE TYPE HEAT EXCHANGER(TG) | work15 | 6 | Nos |
| 18 | 4 | CLEANING OF COOLERS | |||
| 19 | 4.1 | MDBFP WORKING OIL COOLER | work16 | 4 | Nos |
| 20 | 4.2 | MDBFP LUBE OIL COOLER | work17 | 4 | Nos |
| 21 | 4.3 | VACUUM PUMP SEAL WATER COOLER/PHE | work18 | 8 | Nos |
| 22 | 4.4 | TDBFP LUBE OIL COOLER 3800 X 512 (L X OD) MM | work19 | 8 | Nos |
| 23 | 5 | AOH /REPAIR / REPLACEMENT OF VARIOUS VALVES IN TG HOUSE | |||
| 24 | 5.01 | HIGH PRESSURE VALVES (PRESSURE ABOVE 50 KG / Sq.CM) | |||
| 25 | 5.02 | SIZE 300 MM AND ABOVE | work20 | 12 | Nos |
| 26 | 5.03 | SIZE 200 MM AND ABOVE BUT LESS THAN 300 MM | work21 | 16 | Nos |
| 27 | 5.04 | SIZE BELOW 50 MM | work22 | 50 | Nos |
| 28 | 6 | MEDIUM PRESSURE VALVES (PRESSURE BETWEEN 10 TO 50 KG / Sq.CM) | |||
| 29 | 6.01 | Size 300 mm and above | work26 | 12 | Nos |
| 30 | 6.02 | SIZE BELOW 50 MM | work27 | 40 | Nos |
| 31 | 7 | LOW PRESSURE VALVES (PRESSURE BELOW 10 KG / Sq.CM) | |||
| 32 | 7.01 | SIZE 350 MM & ABOVE | work34 | 12 | Nos |
| 33 | 7.02 | SIZE 300 MM & ABOVE BUT LESS THAN 350 MM | work35 | 12 | Nos |
| 34 | 7.03 | SIZE 250 MM & ABOVE BUT LESS THAN 300 MM | work36 | 12 | Nos |
| 35 | 7.04 | SIZE 150 MM & ABOVE BUT LESS THAN 200 MM | work37 | 24 | Nos |
| 36 | 7.05 | SIZE 50 MM & BELOW | work38 | 20 | Nos |
| 37 | 8 | OVERHAULING OF LOW PRESSURE BUTTERFLY VALVES | |||
| 38 | 8.01 | BUTTERFLY VALVES 100 MM | work43 | 20 | Nos |
| 39 | 8.02 | BUTTERFLY VALVES 150 MM | work44 | 20 | Nos |
| 40 | 8.03 | BUTTERFLY VALVES 200 MM | work45 | 20 | Nos |
| 41 | 8.04 | BUTTERFLY VALVES 300 MM | work46 | 20 | Nos |
| 42 | 8.05 | BUTTERFLY VALVES 400 MM | work47 | 20 | Nos |
| 43 | 8.06 | BUTTERFLY VALVES 500 MM | work48 | 24 | Nos |
| 44 | 8.07 | BUTTERFLY VALVES 600 MM | work49 | 10 | Nos |
| 45 | 8.08 | BUTTERFLY VALVES 700 MM | work50 | 22 | Nos |
| 46 | 8.09 | BUTTERFLY VALVES 1800 MM | work51 | 16 | Nos |
| 47 | 9 | OVERHAULING OF PUMPS | |||
| 48 | 9.01 | ACW PUMP | work52 | 6 | Nos |
| 49 | 9.02 | TG DMCW PUMP | work53 | 6 | Nos |
| 50 | 9.03 | SG DMCW PUMP | work54 | 4 | Nos |
| 51 | 10 | HPH/LPH Overhauling | |||
| 52 | 10.01 | Overhauling of LP heaters | work57 | 8 | Nos |
| 53 | 10.02 | Overhauling of HP heaters | work58 | 8 | Nos |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender