Urban Development Department-UDD has published Construction Of Pcc Road From Kunj Bihar To Ashirwad Building At Ward No . 11 Under Adityapur Municipal Corporation. Submission Date for this Tender is 01-03-2021. Road Work Tenders in Ward No. 11 Jharkhand. Bidders can get complete Tender details and download the document.
Name of Work: Construction of PCC road from Kunj Bihar to Ashiwad Building at Ward No. 11 under Municipal Corporation, Adityapur | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts, leveling, ramming the foundation trenches removing root of trees, shrubs all complete as per approved design, building specification and direction of E/I. (5.1.1+5.1.2). | 168 | Per M3 | |
2 | 2 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layer not exceeding 150mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/I. (Mode of measurement compacted volume) (5.1.10) | 84 | Per M3 | |
3 | 3 | Providing designation 75B brick on edge soling in road (foundation) ------- do---- do---- as per building specification and direction of E/I. (5.6.4) | 560 | Per M2 | |
4 | 4 | Providing P.C.C. M-200 in nominal mix of (1:1.5:3) in foundation and plinth with approved quality of stone chips 20mm to 6mm size graded and clean coarse sand of F.M. 2.5 to 3 including screening, shuttering, mixing cement concrete in mixer and placing in position vibrating, striking curing taxes and royalty all complete as per building specification and direction of E/I. (5.3.2.1) | 112 | Per M3 | |
5 | 5 | Disposal of excavated earth in borrow area with 1KM(K) Lead | 168 | Per M3 | |
6 | 6 | Carriage of Materials | |||
7 | 6.1 | Cement | 47.12 | Per MT | |
8 | 6.2 | Sand | 148.96 | Per M3 | |
9 | 6.3 | Stone Chips | 96.32 | Per M3 | |
10 | 6.4 | Bricks | 30240 | Each | |
11 | 7 | Adding Labour Cess @ 1% | 1 | Each | |
12 | 8 | Add 12% GST | 1 | each | |
13 | 9 | Cost of Signboard | 1 | Nos. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail