Tamil Nadu Generation And Distribution Corporation Limited-TANGEDCO has published Civil Circle Improvement Work Providing Plain Cement Concrete , Fly Ash Brick Pavement And Construction Of Damaged Existing Drain In Raw Water Pump House At Mtps I Mtps I Civil Circle Improvement Work Providing Plain Cement Concrete , Fly Ash Brick. Submission Date for this Tender is 25-02-2021. Water Pump Tenders in Mettur Thermal Power Station I / Mettur Dam Tamil Nadu. Bidders can get complete Tender details and download the document.
NAME OF WORK : MTPS I – Civil Circle - Improvement work - Providing plain cement concrete, fly ash brick pavement and construction of damaged existing drain in Raw Water Pump House at MTPS I | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Earth work excavation in all types of soils except hard rock requiring blasting without damaging the nearby structure and dumping nearby site with head load lead of 10 m and lift of 2m. This rate is inclusive of all labour charges, lead, lift etc., complete., | item1 | 120 | 1 m³\n(One Cubic metre)\n |
2 | 2 | Providing plain cement concrete 1:3:6 using 216kg/m3 cement, 40mm HBG metal including cost of all materials, labour charges, machine mixing, ramming, all lead lift, curing etc., complete as directed by the department engineer in charge. | item2 | 20.5 | 1 m³\n(One Cubic metre)\n |
3 | 3 | Random rubble masonry in CM 1:6 mix for foundation and basement as directed by the department Engineer, including transport charges, loading, unloading, cost of all materials, lead and lift etc., complete. | item3 | 21 | 1 m³\n(One Cubic metre)\n |
4 | 4 | Brick work in CM 1:5 using Second class Ground moulded chamber burnt bricks as directed by the Engineer at site including cost of all materials, labour charges, curing, lead, lift, conveyance of materials and etc., complete . | item3 | 13 | 1 m³\n(One Cubic metre)\n |
5 | 5 | Plastering with CM 1:3, 12 mm thick and finishing the surface neatly including cost of all materials, including chipping and removing the loose particles in the damaged wall, labour charges, curing, all lead, lift and conveyance of materials etc., complete | item3 | 66 | 1 m²\n(One Square metre)\n |
6 | 6 | Replacing existing damaged double leaf gate by new one by supplying, fabricating and placing in position of M.S plain sheeted (16G) double leaf door of required size using M.S. Angle 100x100x10mm for shutter frame, 75x75x8mm for bracing and shutter with 16gauge M.S. Sheet including cost of all materials, labour charges, lead, lift etc complete as directed by the department engineer at site. The dismantled M.S Gate to be devlouted at central stores of MTPS I | item3 | 10.4 | 1 m²\n(One Square metre)\n |
7 | 7 | Supplying and fixing Mosquito net using stainless steel wire mesh to cover window including cost of all materials, labours, lead & lift, fixing charges, Transporting, T&P, etc., and as directed by the department engineer at site. | item3 | 26 | 1 m²\n(One Square metre)\n |
8 | 8 | Painting two coats with enamel paint of approved quality & colour over one coat of red oxide primer to the steel work after thorough scrapping the old paint including cost of all materials, brushes, lead, lift, etc., complete as directed by the Engineer at site. | item3 | 31 | 1 m²\n(One Square metre)\n |
9 | 9 | Supplying and filling gravel for soil eroded area and levelling, watering and consolidation as per the standard specification etc., complete | item3 | 11 | 1 m³\n(One Cubic metre)\n |
10 | 10 | Transporting, filling and spreading the M sand as base course including transporting, filling and consolidation charges including cost of all labour charges, all lead and lift etc., complete. | item3 | 1.6 | 1 m³\n(One Cubic metre)\n |
11 | 11 | Providing dry fly ash brick pavement using fly ash brick of size 23x11x7.5cm including cost of fly ash bricks, all materials, labour charges, lead, lift etc., complete. | item3 | 2.5 | 1 m³\n(One Cubic metre)\n |
12 | 12 | Providing pointing to the dry fly ash brick pavement using CM 1:3 including cost of all materials, curing, labour charges, lead, lift etc., complete. | item5 | 22 | 1 m²\n(One Square metre)\n |