Line Work Under Full Deposit Scheme Work In The Area Of Edsd-Ii , Phalawada
Tender Value
Ref. Documents
Estimated cost
Bid Submission
27 Feb 2021
0 days left
EMD
2000
Bank guarantee accepted
Document Fee
1180
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
mawana → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Line Work Under Full Deposit Scheme Work In The Area Of Edsd-Ii , Phalawada
BOQ
| Name of Work: REGARDING REPAIR & CONSTRUCTION WORK OF OLD & NEW LINE UNDER FULL DEPOSIT WORK SCHEME IN THE AREA OF EDSD-II, PHALAWDA UNDER EDD-I, MAWANA | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Cartage of following material from store center Meerut to JE Store including loading & unloading at both ends maximum distance up to 40 Km. :– | BI01010001010000000000000515BI0100001112 | ||
| 2 | 1.1 | A) PCC Pole 8.5 mrt long/ST pole 11 mtr long. | 30 | Nos | |
| 3 | 1.2 | Cartage of line material from store centre to dump site & then dump site to site of work on day to day basis, including loading & unloading at both ends maximum distance up to 20 Km. (15 Qtl.) | 2 | Job | |
| 4 | 1.3 | Cartage of 10 KVA to 100 KVA Transformer from store centre to site of work including loading & unloading at both site | 4 | Nos | |
| 5 | 1.4 | Cartage of following material from JE Store to site of work including loading & unloading at both ends maximum distance up to 40 Km. :– A) PCC Pole8.5 mrt long/ST pole 11 mtr long. | 30 | Nos | |
| 6 | 1.5 | Safe Cartage of CT/PT of diffrent ratio from store centre meerut to site of work including loading and unloading at both ends. | 3 | Nos | |
| 7 | 1.6 | Dissmentling of Damaged & Broken P.C.C./ S.T.Pole/R.S. Joist by digging the pits & removel of complete H.T./L.T. line accessories . | 5 | Nos | |
| 8 | 1.7 | Eartingh of each 11 KV line pople & T/F properly after drive of electrodes if size 20mmx250mm and connection the earthing point with GL wire. | 10 | Nos | |
| 9 | 1.8 | Erection of PCC pole 8.5 mtr long/STP Pole 11 mrt long after digging a pit of size 1.20 x 0.60 x 1.6 mtr in all type of Soil including back filling of the pole with proper ramming after completion of work. | 22 | Nos | |
| 10 | 1.9 | Fabrication and fixing of all 11 KV H.T/L.T. line accessories. | 22 | Nos | |
| 11 | 2 | Erection of Double pole on PCC pole 8.5 mtr after digging of pit of required size including fabrication and fixing of Top channel, droper channel & base channel alongwith, fixing all 11 KV accessories TPMO, Fuse set 11 KV pin insulators and making connection properly. | 4 | Nos | |
| 12 | 2.1 | Mounting of 10 to 100 KVA T/F with proper jumping of HT side and fixing of cable on LT. side of T/F making connection properly. | 4 | Nos | |
| 13 | 2.2 | Making a section pole to exist pole after fabrication & fixing of T channel fixing of all 11 KV accessories. | 5 | Nos | |
| 14 | 2.3 | Erection of stay rod complete after digging a pit of size 1.20 x 0.60 x 1.6 mtr and grouting the same in block of size 0.60 x 0.60 x 0.30 mtr and nuzzling at the both ends and filling the pit with excavated earth soil with proper ramming. | 10 | Nos | |
| 15 | 2.4 | Laying lifting stringing of proper sagging of ACSR weasel conductor for 3 phase, 3 wire 11 KV line including binding & jumpering properly. | 10 | Span | |
| 16 | 2.5 | Laying lifting stringing of proper sagging of ACSR Rabbit conductor for 3 phase, 3 wire 11 KV line including binding & jumpering properly. | 5 | Span | |
| 17 | 2.6 | Laying lifting & sagging of LT line with A.C.S.R. Weaseal/Rabbit Conductor including proper binding & jumpring:-\na) 3 phase 4 wire line. | 18 | Span | |
| 18 | 2.7 | b) 2 phase 3 wire line. | 15 | Span | |
| 19 | 2.8 | c) 1 phase 2 wire line | 5 | Span | |
| 20 | 2.9 | Guarding of line with G.I. wire having 2 no horizontal wire& 3 Mtr distance odf laces of ten SWG G.I wire after fabrication of guard cross arms of & fixing the same in supports. | 5 | Span | |
| 21 | 3 | Cutting & chopping tree branches near side of line for making the clearance between line and tree (near about 100 branches). | 1 | Job | |
| 22 | 3.1 | Fixing of LT distribution box along with providing clamp Nut & Bolts | 3 | Nos | |
| 23 | 3.2 | Providing and fixing stay clamps . | 10 | Nos | |
| 24 | 3.3 | Providing and fixing Holding clamps . | 40 | Nos | |
| 25 | 3.4 | Providing and fixing LT clamps . | 40 | Nos | |
| 26 | 3.5 | Providing and fixing LT Insulator clamps . | 50 | Nos | |
| 27 | 3.6 | Providing and fixing Bolt and Nuts . | 25 | Kg | |
| 28 | 3.7 | Installation of CT/PT & making connection properly | 3 | Nos | |
| 29 | 3.8 | Fixing of 11 KV heat shrinkable cable jointing kits | 3 | Nos |
AI Tender Summary
Tender Timeline
Feb 19, 2021
11:30 IST
Tender Published
Tender notice published.
CompletedFeb 27, 2021
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedFeb 27, 2021
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender