Irrigation Department has published Lot 2 Making Gates Fencing , Boundary Wall And Steel Railing Etc Works. Submission Date for this Tender is 25-02-2021. Wall construction Tenders in HARIDWAR Uttarakhand. Bidders can get complete Tender details and download the document.
Name of Work: tuin gfj}kj fLFkr ek;kiqj ifjlj esa fofHkUu fcUnqvksa ij vko';drkuqlkj xsV] QSfUlax] ckmUMhoky o LVhy jsfyazx dk dk;ZA | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Steel work welded in In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works or in built up sections/ framed work, including cutting, hoisting, fixing in position. | 4670 | Kg | |
2 | 2 | Painting of steel surface as reqd. shade on primer coat incl. all cost of material, labor and T&P complete. | 82 | SqM | |
3 | 3 | Earthwork in excavation in foundation in all type of soil incl. all lift and lead incl. all cost of material, labor and T&P complete. | 172 | CuM | |
4 | 4 | Providing P.C.C. 1:3:6 in foundation incl. all cost of material, labor and T&P complete. | 28 | CuM | |
5 | 5 | Providing R.C.C. 1:1.5:3 in superstructure incl. all cost of material, labor and T&P complete. | 1.69 | CuM | |
6 | 6 | Providing and laying steel reinforcement incl. all cost of material, labor and T&P complete. | 0.596 | MT | |
7 | 7 | Providing centering & shuttering incl. all cost of material, labor and T&P complete. | 3 | SqM | |
8 | 8 | Providing and laying interlocking tiles incl. all cost of material, labor and T&P complete. | 340 | SqM | |
9 | 9 | Providing brick work in 1:4 cement sand mortar in foundation and superstructure incl. all cost of material, labor and T&P complete. | 123 | CuM | |
10 | 10 | Providing cement plaster in 1:5 cement sand mortar incl. all cost of material, labor and T&P complete. | 550 | SqM | |
11 | 11 | Providing wall putty incl. all cost of material, labor and T&P complete. | 530 | SqM | |
12 | 12 | Providing exterior paint incl. all cost of material, labor and T&P complete. | 530 | SqM | |
13 | 13 | Providing Stainless steel railing and gate in grade 304 incl. all cost of material, labor and T&P complete. | 700 | SqM | |
14 | 14 | Providing boulder pitching in 1:4 cement sand mortar incl. all cost of material, labor and T&P complete. | 77 | CuM |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail