Provision Of Defi Bed Side Lockers And Other Deficient Furnitur Items For Jcos/Or Single And Md Accn At Bhopal . , Sch A Part-I : Wooden Furniture , Bin Linen Multipurpose , Chair Dining Offrs , Chair Dining Jco/Ors , Chair Easy , Chair Writing , Dressing Table Including Stool , Peg Table , Sofa Set 4 Seater , Sofa Set 5 Seater , Stool Dressing Cushioned , Table Bed Side , Table Dining 6 Pers , Teapoy , Teapoy Varandah , Sch A Part-Ii : Steel Furniture , Almirah Large Steel ( Half Hanging ) , Bed Hard Steel , Book Case Steel , Chair Verandah , Charpoy With Hard Top , Charpoy Ip Folding With Ply Top , Table Clerks Steel , Table Officer Steel , Table Typist Steel , Table With Drawer ( 900 X 600 X 760 Mm ) , Locker SteelNote: Arrangement For Fixing The Item Shall Not Be Made With Wall As Shown In Drg . Dimensions / Specification Of Other Members Of The Locker Steel Will Remain Unchanged . , Table 900 X 900 X 760 Mm , Sch A Part-Iii : Trade Patern Furniture , Bathmat Pvc , Chair Conference , Chair Revolving Executive , Chair Plastic Moulded , Receptacle Pvc , Sofa Set 3 + 1 + 1 Seater , Table Executive , Sch A Part-Iv : Repair To Charpoy Gi , Tightening Of Loose Charpoy After Removing Of Old/ Torn Out Nylon Newar From Charpoy Gi Pipe And S&F Of 12 Mm Thick Ply , Isi Mark , Bwr Grade , As Per Is 303 , Of Size 1980 Mm X 900 Mm By Fixing With 12 Nos Nut And Bolt Of Suitable Size With Gi Washer Alongwith Provision Of 25 Mm Square Ms Pipe Stiffner 02 Nos Of 1 . 6 Mm Thick , Conically/ Slanting Cut At The Ends To Continuously Welded On All Four Sides To Flush With The Top Of Long Rail As Directed By Ge . The Ms Pipes Shall Be Painted With Two Coats Of Synthetic Enamel Black Paint Over A Coat Of Red Oxide Primer Complete All As Per Drg And As Specified And Directed . , Removing Of Damaged/ Broken/ Unserviceable Long Rails From Existing Charpoy Gi Pipe And S&F Of New Long Rail Made Out Of Gi Pipe 32 Mm Nominal Bore , Medium Grade ( Isi Marked ) Confirming To Is 1239 Both Ends Threaded Complete All As Specified And Shown On Drg . And Directed . , Removing Of Damaged/ Broken/ Unserviceableshort Rails From Existing Frame Of Charpoy Gi Pipe And Fixing Of Short Rail Made From Old Long Rails Retrieved Against Boq Serial Item No . 4 . 02 Here-In-Before Including Cutting Threading Of Both Ends To Required Size Complete All As Specified And Shown On Drg . And Directed . , Removing Of Damaged/ Broken/ Unserviceable Leg From Existing Frame Of Charpoy Gi Pipe And Fixing Leg Made From Old Short Rails Retrieved Against Boq Serial Item No . 4 . 03 Here-In-Before Including Cutting Threading And Welding Of 3 Mm Ms Plate Of Required Size In Bottom Of Leg And Fixing In Charpoy Gi Pipe Complete As Specified And Shown On Drg And Directed . , Removing Of Old/ Damaged /Unserviceable Gi Elbow 3 Way , 32 Mm Bore From Existing Frame Of Charpoy Gi Pipe And S&F Of New Gi Elbow 3 Way , 32 Mm Bore , Medium Grade Confirmiing To Is 1239 To Charpoy Gi Pipe , Complete All Specified And Shown On Drawing And Directed . , Deduct Schedule Of Credit ( Calculation Will Be Done Off Line ) Rs . 39 , 100 . 00