}

Maintenance And Painting Of Saddle Pantoon Mk-Iii , Chesses Junction Bb And Oars Maint And Painting Of Maint And Painting Of Saddle Pantoon Mk-Iii , Chesses Junction Bb And Oars, GE (ENGR PARK) ALLAHABAD-Uttar Pradesh

Military Engineer Services has published Maintenance And Painting Of Saddle Pantoon Mk-Iii , Chesses Junction Bb And Oars Maint And Painting Of Maint And Painting Of Saddle Pantoon Mk-Iii , Chesses Junction Bb And Oars. Submission Date for this Tender is 22-02-2021. Kitchen Equipment Tenders in GE (ENGR PARK) ALLAHABAD Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

27011583
Maintenance And Painting Of Saddle Pantoon Mk-Iii , Chesses Junction Bb And Oars Maint And Painting Of Maint And Painting Of Saddle Pantoon Mk-Iii , Chesses Junction Bb And Oars
Auction
Indian
Uttar Pradesh
Ge (Engr Park) Allahabad
22-02-2021

Tender Details

Maintenance And Painting Of Saddle Pantoon Mk-Iii , Chesses Junction Bb And Oars Maint And Painting Of Maint And Painting Of Saddle Pantoon Mk-Iii , Chesses Junction Bb And Oars , Maint And Painting Of Saddle Pantoon Mk-Iii , Chesses Junction Bb And Oars 10 Long , Saddle Pantoon Mk-Iii , Chesses Junction Bb , Oars 10 Long , Note;- ( I ) The Above Work Involves Taking Out From Existing Stack And Remove Them To A Distance Out In A Open Area And Lay Them On A Pre-Cleaned Ground On Dunnage Cubes . ( Ii ) Remove Dust , Dirt And Disused And Deteriorated Layer Of Old Paint Throughly From The Surface Using Course Wire Brush And Specially Designed Chisels . The Surface Shall Then Be Throughly Cleaned With Water And Rubbed With Abrasive Paper . Special Care Shall Be Taken For Removing Dust , Dirt And Rust Scale From Re-Entrant Angles , Corners Joints And Hidden Portion . For Saddle Pantoon And Chesses Junction Painting Work :- Apply One Coat Of Red Oxide Metal Primer / Wood Primer ( Make / Asian / Berger ) And Allow Drying For 48 Hours . Apply Two Coats Of Paint Og ( Make: Shalimar / Asian / Berger ) Over Primer Coat And Allow Drying For 48 Hours . For Oars Painting :- Apply Two Coat Of Linseed Oil And Allow Drying For 48 Hours . Apply Two Coats Of Soap Yellow And Allow Drying For 48 Hours ( Iii ) The Above Preserved Store Will Be Shifted From Open Area To Storage Shed On Proper Dunnage Using Concrete Cubes And Anti Termite Steel Tray That Shall Be Issued By The Department For Dunaging In Accountable Position As Per Direction Of Engineer-In-Charge . ( Iv ) Numbering Will Be Done Of Size 2 Letter With White Enamel Paint As Per Direction Of Engr-In-Charge .

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail