Different Types Of Work In Tower -1 New Installation of Trilon Mast all Hot–Deep Galvanized n(including Painting IS 1477 standard ,one coat of red oxide zinc primer and two coats (Asian/Berger paints, colour-deep orange & white ) ,Earthing pit with Lightening arrester ,installation of Two Nos of Static Aerials, Base Foundation, Guy Foundation, Super Structure with necessary Guy Ropes, Strainer, U-Bolt, D-Shackle, etc. and Labour Charges). n n 2 For 40 ft Trilon Mast 3 For 50 ft Trilon Mast 4 For 60 ft Trilon Mast 5 For 75 ft Trilon Mast 6 New Installation of Pipe Mast with all materials all Hot– Deep Galvanized n(including Painting IS 1477 standard, one coat of red oxide zinc primer and two coats (Asian/BergerPaints , colour- deep orange & white ) ,Earthing pit with Lightening arrester ,installation of Two Nos of Static Aerials, Base Foundation, Guy Foundation, Complete Pipe with Ladder and necessary Guy Ropes, Strainer, U-Bolt, D- Shackle, etc. and Labour Charges). n 7 For 60 ft Pipe Mast 8 New installation of SS Tower including Ladder all Hot– Deep Galvanized n(with all materials including Base Foundation, Super Structure and Labour Charges including Painting IS 1477 standard, one coat of red oxide zinc primer and two coats (Asian/Berger Paints , colour- deep orange & white ) ,Earthing pit with Lightening arrester, aviation Lamp(Specification: HG two core 1.5 copper wire, Covering PVC Pipe, Lamp – Low Intensity “Model L1-90 conforming to ICAO type A” fixed red LED aviation obstructing light designed initial intensity 15-18 CD Life 2 years warranty) ,installation of Four Nos of Static Aerials also) n n 9 For 100 ft SS Tower 10 For 120 ft SS Tower 11 For 150 ft SS Tower 12 For 200 ft SS Tower 13 For 250 ft SS Tower 14 New installation of Mono Pole Tower including Ladder , all Hot– Deep Galvanized (with all materials including Base Foundation, Super Structure and Labour Charges including Painting IS 1477 standard ,one coat of red oxide zinc primer and two coats (Asian/Berger Paints , colour- Deep Orange & white, installation of Two Nos of Static Aerials also) 15 For 60 ft Mono Pole Tower 16 New installation of Pipe to angle Self Supported Tower (Three Legs) all Hot– Deep Galvanized n(with all materials including Base Foundation, Super Structure and Labour Charges including Painting IS 1477 standard, one coat of red oxide zinc primer and two coats (Asian/Berger Paints , colour- Deep Orange & white ) ,Earthing pit with Lightening arrester, installation of Four Nos of Static Aerials also) n 17 For 40 ft SS Tower (Three Legs Pipe to angle ) 18 For 60 ft SS Tower(Three Legs Pipe to angle ) 19 For 75 ft SS Tower(Three Legs Pipe to angle )