| 1 | 1 | Name of Work : Strengthening the road from Marappagoundenpudur to Anniyapalayam H/O Kavilipalayam KM 0/0-1/330 H/O Kavilipalayam | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 2 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, scrubs, saplings and trees cut earlierand disposal of unserviceable materials to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. complete. | BI01010001010000000000000515BI0100001113 | 720 | Sqm |
|---|
| 3 | 3 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for cutting side drain etc, complete. As per SS20 A | BI01010001010000000000000515BI0100001114 | | |
|---|
| 4 | 4 | Km 0/000- 1/000 | BI01010001010000000000000515BI0100001115 | 180 | Cum |
|---|
| 5 | 5 | Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. complete for side berms | BI01010001010000000000000515BI0100001116 | | |
|---|
| 6 | 6 | Km 0/000- 1/000 | BI01010001010000000000000515BI0100001117 | 120 | Cum |
|---|
| 7 | 7 | Picking the damaged existing BT Surface including labour charges for picking and rolling by Power roller etc., | BI01010001010000000000000515BI0100001118 | | |
|---|
| 8 | 8 | Km 0/000- 1/000 | BI01010001010000000000000515BI0100001119 | 1366.5 | Cum |
|---|
| 9 | 9 | Providing and laying Grade III metal of 63mm to 11.20mm of 75mm consolidated thickness with cost and conveyance of all materials to site and using 0.24cum of good gritty gravel for 1.00cum of graded metal for blindage with all labour charges for spreading the metal and gravel, hand packing to camber, watering and consoliedation by 8-10 tonne power roller with hire and fuel charges for all the Tools and Plants required for the work etc, complete | BI01010001010000000000000515BI0100001120 | | |
|---|
| 10 | 10 | Km 0/000- 1/000 | BI01010001010000000000000515BI0100001121 | 303.75 | Cum |
|---|
| 11 | 11 | Km 1/000 - 1/330 | BI01010001010000000000000515BI0100001122 | 22.5 | Cum |
|---|
| 12 | 12 | Applying Tack coat over WBM surface (not treated with primer) using 4 kg of bituminous emulsion per 10sqm including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual workspot handing charges including labour charges for brushing cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of of bituminous emulsion including hire fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc. complete as per standard specification | BI01010001010000000000000515BI0100001123 | | |
|---|
| 13 | 13 | Km 0/000- 1/000 | BI01010001010000000000000515BI0100001124 | 4050 | Sqm |
|---|
| 14 | 14 | Providing and laying TACK COAT over the WBM surface using 3.00 Kg of bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. | BI01010001010000000000000515BI0100001125 | | |
|---|
| 15 | 15 | Km 0/000- 1/000 | BI01010001010000000000000515BI0100001126 | 937.5 | Sqm |
|---|
| 16 | 16 | Providing and laying premix carpet with seal coat type ‘A’ for 20mm compacted thickness using 0.18 cum of 13.2mm IRC size HBG crusher metal sand 0.09 cum pf 11.2 mm IRC size HBG crusher metal with 14.60 kg of 60/70 grade bitumen using for premixing for 10 sqm of premix carpet and 0.09 cum of 6.7mm IRC size HBG crusher chits with 9.8 kg of 60/70 grade bitumen for seal coat and conveyance of metal/ chips from approved sources to worksite stacking the same at road side to departmental metric gauge for taking premeasurments including cost of bitumen which will be supplied by the department at the rate and place as specified in the special condition appended including heating the bitumen in bitumen boilers heating the aggregate and mixing them with bitumen in mini hot mix plant for premix carpet rolling by power roller for premix carpet and seal coat separately including labour charges for spreading the mix for premix carpet including labour charges for mini hot mix plant power roller bitumen boiler and all other tools and plants employed etc.complete as per \nSpecification 509 and 513 (III revision) | BI01010001010000000000000515BI0100001127 | | |
|---|
| 17 | 17 | Km 0/000- 1/000 | BI01010001010000000000000515BI0100001128 | 3750 | Sqm |
|---|
| 18 | 18 | Km 1/000 - 1/330 | BI01010001010000000000000515BI0100001129 | 1237.5 | Sqm |
|---|
| 19 | 19 | Supply and fixing of Kilometre stone ( three faces two lines dressed) of size (1.65m X 0.45m X 0.15m) from approved sources including cost and conveyance to worksite and fixing in position as directed by the departmental officers and all other incidental | BI01010001010000000000000515BI0100001130 | 1 | No |
|---|
| 20 | 20 | Supply and fixing of Hectometre stone of size 0.75m X 0.23m X 0.10m from approved sources including cost and conveyance to worksite and fixing in position as directed by the departmental officers and all other incidental charges etc., complete | BI01010001010000000000000515BI0100001131 | 6 | No |
|---|
| 21 | 21 | Supply and fixing of Nameboard including cost and conveyance to worksite and fixing in position as directed by the departmental officers and all other incidental charges etc., complete | BI01010001010000000000000515BI0100001132 | 1 | No |
|---|
| 22 | 22 | Supply and fixing of Sign board including cost and conveyance to worksite and fixing in position as directed by the departmental officers and all other incidental charges etc., complete | BI01010001010000000000000515BI0100001133 | 1 | No |
|---|
| 23 | 23 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \"BB\" for all works in this package}\n(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | BI01010001010000000000000515BI0100001134 | 1 | GST Amount |
|---|