Cost Of Construction Of 350 Permanent Cairns Along The Boundaries Of Various Malavarams In Vadakkanchery Section Under Alathur Range During 2021-22
Name of Work:Estimate for the Cost of construction of 350 permanent cairns along the boundaries of various malavarams in Vadakkanchery section under Alathur Range during 2021-22.
Sl.No.
Item Description
Item Code / Make
Quantity
Units
1
1
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30cm measured at a height of 1m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
787.5
M3
2
2
Earth work excavation in ordinary soil and depositing on bank with intial lead up to 50 m and lift up to 1.5 m \n1.2m x 1.2m x 0.2 m = 0.288 m3 \n350 Nos x 0.288 m3 = 100.80 m3
100.8
M3
3
3
Random rubble masonry in Cm 1:6 for foundation and super structure (using Quarry stones)\n1.2m {(1.2mx1.2m)+(0.6mx0.6m) +\n 3 v 1.2mx1.2mx0.6mx0.6m} = 1.008 m³\n175 Nos x 1.008 m³ = 176.4 m³
176.4
M3
4
4
Random rubble masonry in Cm 1:6 for foundation and super structure (using stones locally collected)\n1.2m {(1.2mx1.2m)+(0.6mx0.6m) +\n 3 v 1.2mx1.2mx0.6mx0.6m} = 1.008 m³\n175 Nos x 1.008 m³ = 176.4 m³
176.4
M3
5
5
Plastering with cement mortar 1:4, 15mm thick\n0.6m x 0.6m = 0.36 m²\n350 nos x 0.36 m2 = 126 m²
126
M3
6
6
Pointing with cement mortar 1:3 Flush/Ruled pointing including all charges complete.\n(1.20m + 0.60m) x1.24m x 4=4.46 m²\n 2\n350 Nos x 4.46 m² = 1561 m²
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.