| 1 | 1 | Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). | | 3 | No |
|---|
| 2 | 2 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. | | 1 | Trip |
|---|
| 3 | 3 | Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. | | 1 | No |
|---|
| 4 | 4 | Fitting one set AB switch and giving connection | | 1 | No |
|---|
| 5 | 5 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials. | | 4 | No |
|---|
| 6 | 6 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials. | | 6 | No |
|---|
| 7 | 7 | Providing one Earth using earth pipe incl. digging & backfilling pit and supply of charcoal, salt, sand etc. | | 1 | No |
|---|
| 8 | 8 | Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling. | | 2 | No |
|---|
| 9 | 9 | Providing one Driven Earth using GI earth pipe at standard distance away from the pole/structure in loose soil. | | 1 | No |
|---|
| 10 | 10 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. | | 3 | No |
|---|
| 11 | 11 | Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit. | | 3 | No |
|---|
| 12 | 12 | Surveying cable route, excavation of trial pits of sizes 0.65x1x1.2m in all class of soil in the proposed cable route at 100m intervals and junctions as per requirement for identifying existing uilities and to avoid damages to them, preparation of tentative drawing for cable route drawing for cable laying and final as built drawing showing landmarks, depth and alignment of cables in lines and grades as a pemanent record (hard and soft copies) after laying and energising. | | 1 | km |
|---|
| 13 | 13 | Laying 11 kV 3x300 sqmm XLPE UG cable by horizontal directional drilling method along/across roads, supplying and pulling 110 mm HDPE/GI pipe duct, drawing 11 kV 3x300 sqmm XLPE UG cable through the duct including surveying the site for collecting information about under ground utility installations and other obstructions using suitable modern sensing equipments, restoring the damages occured if any, pit making, pilot drilling, pre reaming closing of pits with normal soil/filled sand/crusher sand and consolidation to the satisfaction of the road owner and traffic police as they insist, taking the cable to the open trenches, RMUs, transformer yard etc, mounting the cable including clamping after providing loop at 1.2m depth, putting HDPE (PE63.4kg/sqcm) at rising point (0.5m below ground level and 1.5m above ground level) making RCC jointing chambers for strainght joints if any, testing commissioning , placing route markers at 100 m interval, writing identification name, date of laying, date of commissioning etc legibly on the cable rising polyurathane paint etc as per the direction of departmental officers, providing with as built laminated cable route drawing, marking the HDD pits, distance of pits from the boundary of the road, length of the cable bit etc includidng the cost of all materials, labour and hire charges, loading the cable from KSEB stock yard and transporting the cable using contractor supplied trailer and unloading the same at work site. Complete except the cost of 3 core 300 mm2 XLPE UG cable | | 950 | m |
|---|
| 14 | 14 | Excavation of cable trench of appropriate size ( normally 1.2m deep and 0.35m /0.5m wide for single/double run) in all classes of soil including breaking clods, watering, ramming and sectioning of soil bank etc. and back filling the soil after cable laying and consolidating the soil in layers of 75cm (excluding laying of cable). | | 50 | m |
|---|
| 15 | 15 | Laying HT XLPE UG cable of sizes beyond 3x185 sq mm and upto and including 3x300 sqmm including conveying cable from Sub Regional Store/stacking place to work site and laying it carefully using cable rollers, taking through stone ware/G.I.pipes at road crossing/culverts/bridges etc. whereever necessary, providing identification tags at 5m intervals, filling the space around the cable with riddled soil and covering the top with bricks/ cover slabs, providing cable route markers at 100m intervals, inclusive of cost of all materials (other than cost of GI/HDPE pipe & UG Cable), labour and transport including crane charges excluding excavation and backfilling. | | 50 | m |
|---|
| 16 | 16 | Additional rate for providing one disc set on any type of HT pole for making cut point. | | 6 | No |
|---|
| 17 | 17 | Fitting one set (3No.) 11kV LA and giving connections excluding earthing. | | 2 | No |
|---|
| 18 | 18 | Pole numbering using printed Aluminium sheets / Painting the surface of pole with anti algal yellow paint and painting Letters with black paint as specified incl. cost of paint. | | 3 | No |
|---|
| 19 | 19 | Traffic signal painting of pole 1.5m height using black and white paints in alternate rings of 25cm width incl. cost of paint as specified. | | 3 | No |
|---|
| 20 | 20 | Doing straight joint on cables of sizes beyond 3x185 sqmm and upto and incl. 3x300 sq mm using the cable jointing kit supplied departmentally as per specification. | | 2 | No |
|---|
| 21 | 21 | Doing one cable end termination on cables of sizes beyond 3x185 sqmm and upto and incl. 3x300 sq mm using the cable jointing kit supplied departmentally. | | 4 | No |
|---|
| 22 | 22 | Insertion of one HT PSC pole in existing line incl. digging & backfilling pit, fitting cross arm, insulators, binding etc. | | 1 | No |
|---|