| 1 | 1 | Preparation of DPRs for single and small multi village rural water\nsupply schemes under JJM for Administrative & Financial Sanction and Technical sanction, the work includes:\nSurvey by Electronic Total station/DGPS of villages with a view of preparing village index plan, existing HW plan and survey for route of rising/ trunk mains, indicating roads/ streets, surface and width of road/ streets along with places of importance such as Panchayat Bhawan, Hospital, School, Post office, Temple Water Supply structures (GLRs, PSPs, pumping station physical boundary of village north etc. including levels and TBM at important places as per instruction of engineer in charge.\nPreparation of technical report, forecasting of population and design demand, source design, techno-economic desigr of rising mains, selection and design of pumps sets, capacities of CWR, OHSR etc. complete work as per departmental prevailing guidelines and practice.\nHydraulic Design of Distribution network in Loop/Water Gem/EPANET or any other compatible software. Preparation of Auto CAD Drawing (A-3/A-2) with complete hydraulic design output details, such as pipe no, node no, pipe length, pressure at node etc. Preparation of estimate of various components based on prevailing BSRs in PHED and non BSR if any with detailed analysis. Preparation of conceptual drawings, L-sections for rising mains, HW plan, GA drawings of P.S., ESR, CWR, GLSR, valve chambers etc.\nPrinting of DPR in 6 copies, including drawings in appropriate size of paper for A&F and technical sanctions separately as per direction of EIC. Reply of observation raised by department for A&F and TS shall be submitted within timeframe as per scope of work. Work excludes prepaiation of Bid document and rates are including GST and all other taxes applicable,\nThe DPR shall include all other habitation and main village in a unit.\n | BI01010001010000000000000515BI0100001112 | | |
|---|