| 1 | 1 | Supplying ,Installation and Commissioning of water lubricated Vertical turbine Pump ( Kirloskar/ Jyoti /WPIL Make) having discharge of 65,000 GPH against total Head of 50 m consisting of pump bowl assembly, 8” dia, 60 ft. column assembly discharge Head, driven coupling suitable Sq. Cage Vertical hollow/solid shaft induction motor ( Kirloskar/ Jyoti /Crompton & Greaves/ABB make) working on 3 Phase, 50HZ, 415±10% , (1400-1500) RPM with suitable fully automatic star delta L&T/Havells/BCH make Starter along with Sluice Valve, N.R. Valve, Pressure gauge PL Tank, Strainer etc. all Complete. | item1 | 2 | SET |
|---|
| 2 | 2 | Dismantling and taking out and transporting 2 nos. old pump set, 1 no. servokon 150 KVA stabilizer and other items to filter house, ghatsila. | item2 | 1 | JOB |
|---|
| 3 | 3 | Supplying and Laying 35 mm²x 3 Core PVC insulated and PVC sheathed unarmored Copper Cable 1.1 KV grade for doing Connection from Panel board to Starter to Motor.\n | item3 | 70 | Meter |
|---|
| 4 | 4 | Supplying and erecting free standing type floor mounted sheet steel enclosed Cubical type industrial panel board suitable for 415+ 10%, 50 C/S, make of 16SWG, CRCA Sheet dust & vermin proof enclosure front open able having proper ventilation on both side duly painted with 2 coats of synthetic enamel paints over one coat of primer Comprising of the following --:\nINCOMING FEEDER. \n(a) 315 Amps. 4 poles 415V TPN MCCB breaking capacity 35 KA Make L& T make-01 No. \n(b) 4 Bar 315A Copper strip Bus-bar with heat shrinking Sleeve for 3 phase and one Neutral along with adequate Bus-bar support of porcelain – 1 Set\nOUTGOING FEEDER. \n(c) 250 Amps.TPN MCCB Breaking capacity 35 KA Make L&T- 3 No \n(d) (0 – 200) Amps. 2 Nos. Ampere meter CT Operated with Selector Switch, (0 – 500V ) Volt meter with selector switch and phase indicating lamp LED Type of three different Colour - 1 Set\n(e) 32 Amps. DP M.C.B for lighting purpose and doing internal wiring with proper gauge of Copper wire etc. all Complete.\n | item4 | 1 | JOB |
|---|
| 5 | 5 | Supplying XLPE / PVC insulated armored Cable 1100V Grade with ISI Mark 185 mm²x 3½ Core standard aluminum conductor with 6 mm thick 25 mm width for doing connection from Transformer to Panel board through stabilizer. | item5 | 110 | Meter |
|---|
| 6 | 6 | construction of foundation of dimension 2.5’ x 2.5’x 8’’ or as per E/I directions. | item6 | 2 | JOB |
|---|
| 7 | 7 | Supplying, installation, testing & Commissioning of Outdoor type 100 KVA 11/0.433 KVA Copper wound distribution transformer with of load tap Changer 12.5% to 2.5% in step of 2.5%, continuously rated for three Phase, 50 HZ, full load and temperature rise not exceeding 45 degree centigrade by thermometer in oil and 50 degree centigrade by the resistance in winding after continuous run at full load rating, the transformer should have oil immersed winding having vector group of 0.433/11, HT side connected in delta & LT side connected in Star with neutral brought out connected. The transformer should have power terminal bushing arrangement on HT side & Cable box in LT side with Standard fitting for mounting of transformer with first filling of transformer oil including all accessories etc. all complete with all materials Make – Kirloskar/ Synergy/Crompton /BHEL for Raw water Ghatsila P/P. \n | item7 | 1 | set |
|---|
| 8 | 8 | Supply and Construction of DP structure by supplying, erecting, installation and Commissioning PCC pole, top bracket channel, back clamp, 11KV disc insulator with hardware earthing set complete, M.S. angles, top channels, DO fuse, AB switch, 3 sets of horn gape fuse and 11KV lightening arrester, GI wire, stay set complete nut bolts, providing earthing of transformer:- Two nos (one no. for neutral and one no. for body) with all required material labours, PCC foundation work for transformer, fabrication work required for the Job, all complete. | item8 | 1 | JOB |
|---|
| 9 | 9 | Chemical earthing 40 feet & 80 mm hole size with electrode and chemical compound etc with watering pipe and locking arrangement including soldering, riveting, jointing G.I. flat strip 20 mm x 3mm to all equipments. | item9 | 4 | No. |
|---|
| 10 | 10 | light wiring inside Pump chamber by doing Short Point light wiring 4 Point long Point light wiring 4 Points,120 watt LED street light Complete Set – 2 Nos. 40 watt x 4’ tubelight – 2 Nos etc. all including labour Charges all Complete. | item10 | 1 | JOB |
|---|
| 11 | 11 | Supplying installation testing and commissioning of 100 KVA servo controlled automatic voltage stabilizer oil cooled Powerline/IPC/Servokon make suitable for output voltage of 415 volt+/-1% under input voltage range of 270-460 volts (phase to phase), 3 phase, 50 Hz, with copper wound transformer. The stabilizer shall function satisfactorily even if incoming supply is unbalanced between phases within range of 10%. The stabilizer should have indicator, alarm, voltmeter and auto/manual selector switch for measuring input and output voltage, Raise/ Low push buttons etc. Suitable capacity Termination strip and bus bars for incoming and outgoing cable should be provided. All three phase shall be independently monitored and corrected. Following protections and indications shall be incorporated -:\nOver Voltage / Under Voltage Single Phasing Cut Off Contactor with electronic Output Sensing Unit. \n | item11 | 1 | EACH |
|---|
| 12 | 12 | Transformer oil for the above stabilizer of best make upto mark. | item12 | 600 | Litre |
|---|
| 13 | 13 | Supplying and fixing 200 Amp 415+/- 15% voltage changover switch, Havell’s/ L&T make | item13 | 1 | No. |
|---|
| 14 | 16 | GST 12% | item16 | 1 | No. |
|---|
| 15 | 17 | 1% Labour Cess | item17 | 1 | No. |
|---|