Miscellaneous Maintenance Jobs Of Critical Equipments In Suphala Plant At Rcf Trombay Unit . , MES DEPT ROOM NO 25 ADMIN-Maharashtra

Rashtriya Chemicals And Fertilizers Limited-RCF has published Miscellaneous Maintenance Jobs Of Critical Equipments In Suphala Plant At Rcf Trombay Unit . . Submission Date for this Tender is 24-02-2021. Cutting Crimping and Punching Tools Tenders in MES DEPT ROOM NO 25 ADMIN Maharashtra. Bidders can get complete Tender details and download the document.




Tender Notice

26928426
Miscellaneous Maintenance Jobs Of Critical Equipments In Suphala Plant At Rcf Trombay Unit .
Open Tender
Indian
Maharashtra
MES DEPT ROOM NO 25 ADMIN
24-02-2021

Tender Details

Miscellaneous Maintenance Jobs Of Critical Equipments In Suphala Plant At Rcf Trombay Unit . - 2 1-Bottom Boot Cover Opening And Boxing Up 3 2-Inspection Windows Opening & Boxing Up 4 3-Shear Pin Replacement 5 4-Multi-Disc / Resilient Plate Of Fluid Coupling Replacement 6 5-Replacement Of Bottom Sprocket Sealing Arrangement ( Both Sides ) 7 6-Replacement Of Backstop Lever With Pin 8 Job B: Ra / Rb / Dra / Drb Fines, Rhs / Dbn Cpc, K-1, K-2, D-1, D-2, Np-0, Np-7, Np-8 Conveyors 9 1-Replacement / Chain Shortening Of Drive Chain 10 2-Replacement Of Drive / Driven Sprocket 11 3-Replacement Of Pulley Bearing Assembly 12 4-Greasing Of Pulley Bearing ( 02 Nos. ) 13 5-Replacement / Inspection Of Grid Member Of Coupling 14 6-Replacement Of Coupling & Alignment 15 7-Replacement Of Tie-Rods ( 02 Nos. ) Of Tail End Pulley 16 8-Replacement Of Belt Scrapper 17 9-Removal Of Belt Off-Centre 18 ( C ) - Rhs / Dbn Spherodizers 19 1-Replacement Of Nozzle Cup / Spray Gun Assembly 20 2-Replacement / Tightening Of Pulley ‘ V ‘ Belt 21 3-Gearbox Pulley Replacement 22 4-Replacement Of Girth Gear Bolts 23 5-Gearbox Bearing Inspection 24 6-Replacement / Tightening Of Gearbox & Motor Foundation Bolts 25 7-Replacement / Inspection Of Grid Member Of Coupling Of Gearbox 26 8-Bearing Inspection / Greasing Of Plummer Blocks Of Trunion Roller 27 ( D ) - Rhs / Dbn Cooler / Coater 28 1-Replacement / Inspection Of Grid Member Of Coupling 29 2-Replacement Of Coupling & Alignment 30 3-Alignment Of Motor & Gearbox 31 4-Replacement Of Girth Gear Bolts 32 5-Replacement / Tightening Of Gearbox & Motor Foundation Bolts 33 6-Gearbox Bearing Inspection 34 7-Bearing Inspection / Greasing Of Plummer Blocks Of Trunion Roller 35 ( E ) - Dc-201 / 202 / 203 / 204 / 205 / 206 Reactors / Tanks 36 1-Replacement Of Outlet Valves Size : 5” 37 2-Replacement Of Outlet Valves Size : 4” 38 3-Replacement Of ‘ V ‘ Belts Of Dc-205 / 206 Tanks 39 4-Strainer Opening & Box Up Of Dc-205 / 206 Tanks 40 5-Replacement / Tightening Of Foundation Bolts Of Gearbox 41 6-Replacement / Tightening Of Coupling Bolts 42 7-Replacement Of Lovejoy Coupling Pads Of Gd-211 / 214 43 8-Replacement Of Lovejoy Coupling Pads Of Gd-212 / 213 44 9-Replacement / Tightening Of Intermediate Flange Bolts Of Gd-211 / 214 45 ( F ) - Ra / Rb / Dra / Drb, La, Gb-721 / 723, Gb 622 / 622 A Exhausters 46 1-Replacement / Inspection Of Grid Member Of Coupling 47 2-Alignment Of Motor & Rotor 48 3-Inspection Windows Opening & Boxing Up 49 4-Suction / Discharge Damper Servicing In Position 50 5-Bearing Inspection ( 02 Nos. ) / Clearance Checking 51 6-Insitu Balancing Of Rotor Assembly ( With Phs Dept. ) 52 7-Foundation Bolts Tightening 53 8-Descaling Rotor Of Fume Exhauster 54 ( G ) - Rhs / Dbn Furnace Fan 55 1-Replacement / Inspection Of Grid Member Of Coupling 56 2-Replacement Of Coupling & Alignment 57 3-Alignment Of Motor & Rotor 58 4-Inspection Windows Opening & Boxing Up 59 5-Insitu Balancing Of Rotor Assembly ( With Phs Dept. ) 60 6-Foundation Bolts Tightening 61 ( H ) - Slurry Spray, Slurry Transfer, Scrubbing Pumps 62 1-Replacement / Inspection Of Grid Member Of Coupling 63 2-Replacement Of Coupling & Alignment 64 3-Two Dial Alignment Of Pump 65 4-Replacement Of Discharge ‘ Nrv ‘ 66 5-Replacement Of Butterfly Valve Size : 10” 67 6-Replacement Of Butterfly Valve Size : 8 “ 68 7-Replacement Of Butterfly Valve Size : 6” 69 8- 3” / 4” Slurry Line Flanges Opening & Box-Up For Cleaning Job 70 ( I ) - Rhs / Dbn Product, Rhs / Dbn Cpc, Rock Screen Vibrators 71 1-Replacement / Repair Of Vibrator Assembly Complete 72 2-Replacement Of Bottom Stand Post 73 3-Replacement / Tightening Of Stand Post Bolts 74 4-Replacement Of Tie-Rod With Bush 75 ( J ) -Cpt-1 / 2, Cpt-5 / 6 Compressor 76 1-Replacement Of ‘ V ‘ Belt Cpt 1 / 2 77 2-Replacement Of ‘ V ‘ Belt Cpt 5 / 6 78 3-Replacement Of After-Cooler / Intercooler 79 4-Repairing / Hydro-Testing Of After-Cooler / Intercooler 80 ( K ) -Rhs / Dbn Cyclones 81 1-Replacement Of Rubber Flapper 82 2-Fabrication / Replacement Of Cyclone Bottom Cone With Rubber Flapper 83 3-Replacement Of Cyclone Chain

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of Work- Miscellaneous Maintenance jobs of Critical Equipment’s in Suphala Plant at RCF Trombay unit
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Job A: RA/RB/DRA/DRB Bucket Elevators
2 1.11 1-Bottom boot cover opening and boxing up 15 Each time
3 1.12 2-Inspection windows opening & boxing up 18 Each time
4 1.13 3-Shear pin replacement 20 Each time
5 1.14 4-Multi-disc/Resilient plate of Fluid coupling replacement 8 Each time
6 1.15 5-Replacement of bottom sprocket sealing arrangement(both sides) 12 Each time
7 1.21 6-Replacement of backstop lever with pin 10 Each time
8 2 Job B: RA/RB/DRA/DRB fines, RHS/DBN CPC, K-1, K-2, D-1,D-2, NP-0,NP-7, NP-8 conveyors
9 2.11 1-Replacement / Chain shortening of Drive chain 10 Each time
10 2.12 2-Replacement of drive/driven sprocket 10 Each time
11 2.13 3-Replacement of Pulley bearing assembly 10 Each time
12 2.14 4-Greasing of Pulley bearing (02 nos.) 50 Each time
13 2.15 5-Replacement / Inspection of Grid member of coupling 10 Each time
14 2.16 6-Replacement of coupling & alignment 10 Each time
15 2.17 7-Replacement of Tie-rods (02 nos.) of Tail end pulley 20 Each time
16 2.18 8-Replacement of Belt scrapper 10 Each time
17 2.19 9-Removal of Belt off-centre 15 Each time
18 3 (C)- RHS/DBN Spherodizers
19 3.11 1-Replacement of nozzle cup/Spray gun assembly 32 Each time
20 3.12 2-Replacement/ tightening of pulley ‘ V ‘ Belt 12 Each time
21 3.13 3-Gearbox Pulley replacement 4 Each time
22 3.14 4-Replacement of Girth gear bolts 24 Each time
23 3.15 5-Gearbox bearing inspection 4 Each time
24 3.16 6-Replacement/ tightening of gearbox & motor foundation bolts 10 Each time
25 3.17 7-Replacement / Inspection of grid member of coupling of gearbox 4 Each time
26 3.18 8-Bearing inspection/ greasing of Plummer blocks of trunion roller 32 Each time
27 4 (D)- RHS/DBN Cooler /Coater
28 4.11 1-Replacement / Inspection of grid member of coupling 16 Each time
29 4.12 2-Replacement of coupling & alignment 6 Each time
30 4.13 3-Alignment of motor & gearbox 8 Each time
31 4.14 4-Replacement of Girth gear bolts 16 Each time
32 4.15 5-Replacement/ tightening of gearbox & motor foundation bolts 16 Each time
33 4.16 6-Gearbox bearing inspection 8 Each time
34 4.17 7-Bearing inspection/ greasing of Plummer blocks of trunion roller 24 Each time
35 5 (E)- DC-201/202/203/204/205/206 Reactors / Tanks
36 5.11 1-Replacement of outlet valves Size : 5” 5 Each time
37 5.12 2-Replacement of outlet valves Size : 4” 5 Each time
38 5.13 3-Replacement of ‘ V ‘ belts of DC-205/206 tanks 5 Each time
39 5.14 4-Strainer opening & box up of DC-205/206 tanks 15 Each time
40 5.15 5-Replacement/ tightening of Foundation bolts of gearbox 8 Each time
41 5.16 6-Replacement/ tightening of Coupling bolts 8 Each time
42 5.17 7-Replacement of Lovejoy coupling pads of GD-211/214 5 Each time
43 5.18 8-Replacement of Lovejoy coupling pads of GD-212/213 5 Each time
44 5.19 9-Replacement/ tightening of intermediate flange bolts of GD-211/214 8 Each time
45 6 (F)- RA/RB/DRA/DRB, LA, GB-721/723, GB 622/622 A Exhausters
46 6.11 1-Replacement / Inspection of Grid member of coupling 10 Each time
47 6.12 2-Alignment of motor & rotor 6 Each time
48 6.13 3-Inspection windows opening & boxing up 40 Each time
49 6.14 4-Suction/Discharge damper servicing in position 20 Each time
50 6.15 5-Bearing inspection (02 nos.) / clearance checking 20 Each time
51 6.16 6-Insitu Balancing of rotor assembly (with PHS dept.) 12 Each time
52 6.17 7-Foundation bolts tightening 18 Each time
53 6.18 8-Descaling rotor of fume exhauster 8 Each time
54 7 (G)- RHS/DBN Furnace Fan
55 7.11 1-Replacement / Inspection of Grid member of coupling 8 Each time
56 7.12 2-Replacement of coupling & alignment 4 Each time
57 7.13 3-Alignment of motor & rotor 6 Each time
58 7.14 4-Inspection windows opening & boxing up 16 Each time
59 7.15 5-Insitu Balancing of rotor assembly (with PHS dept.) 6 Each time
60 7.16 6-Foundation bolts tightening 8 Each time
61 8 (H)- Slurry spray, Slurry transfer, Scrubbing Pumps
62 8.11 1-Replacement / Inspection of Grid member of coupling 20 Each time
63 8.12 2-Replacement of coupling & alignment 10 Each time
64 8.13 3-Two dial alignment of pump 10 Each time
65 8.14 4-Replacement of discharge ‘ NRV ‘ 10 Each time
66 8.15 5-Replacement of Butterfly Valve Size : 10” 8 Each time
67 8.16 6-Replacement of Butterfly valve Size : 8 “ 8 Each time
68 8.17 7-Replacement of Butterfly Valve Size : 6” 8 Each time
69 8.18 8- 3”/4” Slurry line flanges opening & box-up for cleaning job 20 Each time
70 9 (I)- RHS/DBN Product, RHS/DBN CPC, Rock Screen Vibrators
71 9.11 1-Replacement/Repair of vibrator assembly complete 6 Each time
72 9.12 2-Replacement of Bottom stand post 10 Each time
73 9.13 3-Replacement/tightening of stand post bolts 15 Each time
74 9.14 4-Replacement of tie-rod with bush 15 Each time
75 10 (J)-CPT-1 /2, CPT-5/6 compressor
76 10.11 1-Replacement of ‘ V ‘ Belt CPT 1/2 8 Each time
77 10.12 2-Replacement of ‘ V ‘ Belt CPT 5/6 8 Each time
78 10.13 3-Replacement of After-cooler / Intercooler 4 Each time
79 10.14 4-Repairing / Hydro-testing of After-cooler / Intercooler 4 Each time
80 11 (K)-RHS/DBN Cyclones
81 11.11 1-Replacement of Rubber flapper 8 Each time
82 11.12 2-Fabrication/ replacement of Cyclone bottom cone with rubber flapper 6 Each time
83 11.13 3-Replacement of Cyclone chain 12 Each time
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail