Road Transport and Highways Government Departments Closing in 0 days TDR #26928287

Pmc Services Including Feasibility Study Preparation Of Dpr Preconstruction Activities And Construction Supervision For Development Of Poonch-Uri Road To Nhdl Specifications ( Tentative Length-120 Km ) In Ut Of J And K Under Pmdp J And K - 2015

Issued by Government Departments · Poonch Uri road, Jammu And Kashmir
Tender Value
Ref. Documents
Estimated cost
Bid Submission
23 Mar 2021
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
5000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Poonch Uri road → Jammu And Kashmir
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Pmc Services Including Feasibility Study Preparation Of Dpr Preconstruction Activities And Construction Supervision For Development Of Poonch-Uri Road To Nhdl Specifications ( Tentative Length-120 Km ) In Ut Of J And K Under Pmdp J And K - 2015 , For Phase 1 And 2 ( Dpr And Preconstruction Activities ) , Remuneration For Local Staff ( Inclusive Of Per Diem Allowance ) , Team Leader Cum Senior Highway Engineer , Senior Bridge Engineer , Highway Cum Pavement Engineer , Material -Cum-Geotechnical Engineer-Geologist , Senior Survey Engineer , Road / Traffic Safety Expert , Environmental Specialist , Quantity Surveyor / Documentation Expert , Land Acquisition Expert , Utility Expert , Tunnel Design Expert , Senior Geotechnical Engineer , Sub Professional Staff ( To Be Assessed By Consultant As Per Requirement Of Assignment And One Sub-Professional Be A Fresh Graduate ) , Tbn , Tbn , Tbn , Tbn , Tbn , Tbn , Tbn , Tbn , Tbn , Tbn , Tbn , Tbn , Support Staff Note: To Be Assessed By Consultant As Per Requirement Of Assignment , Office Manager , Typist , Office Boy , Night Watchman , Transportation ( Fixed Costs ) , The Vehicles Provided By The Consultants Shall Include The Cost For Rental , Drivers , Operation , Maintenance , Repairs , Insurance Etc . A . For Use Of Consultants , Duty Travel To Site ( Fixed Costs ) , Office Rent ( Fixed Costs ) , The Rent Cost Includes Operation & Maintenance , Cleaning , Repairs Etc For The Entire Duration Of Services . , Office Supplies , Utilities And Communication ( Fixed Costs ) , Office Supplies Drafting , Supplies Computer , Running Costs , Domestic And International Communication , Office Furniture And Equipment ( Rental ) , Office Furniture And Equipment , Reports And Document Printing , Monthly Reports ( 3 Copies Per Month ) , Inception Report & Qap , Environment And Social Impact Screening Report , Draft Feasibility Report , Final Feasibility Report , Strip Plan With La Report , Draft La Clearances I Report , Final La And Clearances I Report , Draft Environment Assessment Report & Rap , Final Environment Asessment Report & Rap , Draft Detailed Design Report & Drawings Etc . , Draft Emp , Draft Bidding Document , Final Detailed Project Report With Bill Of Quantities , Cost Estimates , Updated Drawings Etc . , Final Emp , Final Bidding Documents , Draft 3 ( A ) , 3A And 3D Notification Or Equivalent Publication As Per Prevailing La Act Of Area Under Consideration As Per Nh Act Or State Act Or Relevant Act For Land Acquisition ( 03 Copies Each ) , La & Clearances Ii Report , Survey And Investigation , A . Topographical Survey ( Fixed Rate ) , Topographic Survey Including Hire Charges For Equipment And Supply Of Survey Teams Comprising Of Project Survey Filed Staff Etc . Inclusive Of Cost Of Materials , Labourer . , Detailed Topographic Surveys Using Mobile / Aerial Lidar Or Better Technology , B . Investigation ( Fixed Cost ) , Road And Bridge Inventory , Fwd Test And Pavement Evaluation , Roughness Survey , Axle Load Survey , Material Survey And Investigation , Sub-Grade Investigation , Traffic Survey , Socio-Economic & Census Survey / Studies , Land Acquisition Studies , Sub-Soil Investigation For Tunnel , Boring In All Type Of Soils ( Other Than Hard Rock ) , Boring In Hard Rock , C . Net Work Survey And Gpr , Net Work Survey Of The Existing Highway As A Repository For Civil Work As Per Directions From Authority , Gpr Survey For Detection Of Under Ground Utilities , Cost Of Supply And Fixing Boundary Pillars , Procuring And Fixing Boundary Pillars And Its Installation , Complete In All Respect As Per Irc:25 , 1967: Wherever The Proposed Alignment Follows The Existing Alignment , The Boundary Pillars Shall Be Fixed At An Interval Of 200M On Either Side Of Proposed Right Of Way . Wherever There Is A Proposal Of Realignment Of The Existing Highway And / Or Construction Of New Bypasses , Consultant Shall Fix Boundary Pillars Along The Proposed Alignment On The Extreme Boundary On Either Side Of The Project Highway At 50 M Interval . ( Lumpsum ) , Land Acquisition Team Including Support Staff And Logistics / Transportation , A . Land Acquisition Team Including Support Staff , Ex-Land Revenue Inspector / Officer Or Equivalent , Ex-Kanoogo / Girdwar Or Equivalent , Ex-Patwari Or Equivalent , Typist , Peon , B . Logistics For Land Acquisition Team , Computer Including Necessary Peripherals , Printers , Vehicles ( Bolero Or Equivalent ) With Monthly Running Limit Of 4000 Km , For Phase 3 ( Construction Supervision And Maintenance ) , Remuneration For Local Staff ( Inclusive Of Per Diem Allowance ) , Team Leader Cum Senior Highway Engineer , Resident Cum Highway Engineer , Senior Bridge Engineer , Highway Cum Pavement Engineer , Senior Quality Cum Material Expert , Road / Traffic Safety Expert , Tunnel Design Expert , Senior Geotechnical Engineer , Sub Professional Staff ( To Be Assessed By Consultant As Per Requirement Of Assignment And One Sub-Professional Be A Fresh Graduate ) , Survey Enginner , Assistant Highway Engineer , Cad Expert , Environmental Engineer , Assistant Bridge Engineer , Assistant Quality Cum Material Engineer , Electrical Engineer , Htms / Toll Expert , Quantity Surveyor , Horticulture Cum Landscaping Expert , Tunnel Safety Expert , Geologist , Support Staff Note: To Be Assessed By Consultant As Per Requirement Of Assignment , Office Manager , Accountant Cum Cashier , Steno Cum Computer Operator , Office Boy , Transportation ( Fixed Rate On Rental Basis ) , The Vehicles Provided By The Consultants Shall Include The Cost For Rental , Drivers , Operation , Maintenance , Repairs , Insurance Etc . For All Complete Approx 3000Km / Month Run , Duty Travel To Site ( Fixed Costs ) , Office Rent ( Fixed Costs ) , Minimum 200 Sqm Area Of Office Shall Be Rented . The Rent Cost Includes Electricity , Water Charges , Maintenance , Cleaning , Repairs Etc Complete . , Office Supplies , Utilities And Communication ( Fixed Costs ) , Office Supplies , Drafting Supplies , Computer Running Costs , Domestic And International Communication , Office Furniture And Equipment ( Rental ) , Office Furniture And Equipment , Reports And Document Printing , Monthly Reports ( 3 Copies Per Month ) , Half Yearly Reports , Various Others Reports As Provided In The Concession Agreement Such As Completion Report , Road Survey Equipment , Surface Defects Detection And Roughness Measurement Using Network Survey Vehicle , Pavement Strength Measurement Using Fwd , Bridge Inspection Using Mobile Bridge Inspection Unit Or Drone Technology , Road Signs Inspection Using Retro Reflectometer , Contingencies , A Fixed Amount Of Indian Rupees One Million Shall Be Included In The Financial Proposal . The Provisions Of Contingency Shall Be Operated With The Specific Approval From The Competent Authority In Ce ( P ) Beacon

BOQ

Name of Work: PROJECT MANAGEMENT CONSULTANCY SERVICES INCLUDING FEASIBILITY STUDY, PREPARATION OF DPR, PRE-CONSTRUCTION ACTIVITIES AND CONSTRUCTION SUPERVISION FOR DEVELOPMENT OF POONCH-URI ROAD TO NHDL SPECIFICATIONS (TENTATIVE LENGTH - 120 KM) IN UT OF JAMMU AND KASHMIR UNDER PMDP J&K - 2015
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11For Phase 1 and 2 (DPR and Preconstruction Activities)
21.01Remuneration for Local Staff (inclusive of per diem allowance)\n
31.02Team Leader cum Senior Highway Engineer17Month
41.03Senior Bridge Engineer5Month
51.04Highway cum Pavement Engineer5Month
61.05Material -cum-Geotechnical Engineer-Geologist6Month
71.06Senior Survey Engineer13Month
81.07Road/Traffic Safety Expert4Month
91.08Environmental Specialist6Month
101.09Quantity Surveyor / Documentation Expert6Month
111.1Land Acquisition Expert14Month
121.11Utility Expert12Month
131.12Tunnel Design Expert4Month
141.13Senior Geotechnical Engineer6Month
151.14Sub Professional Staff (To be assessed by consultant as per requirement of assignment and one sub-professional be a fresh graduate)
161.15TBN24Month
171.16TBN24Month
181.17TBN24Month
191.18TBN24Month
201.19TBN24Month
211.2TBN24Month
221.21TBN24Month
231.22TBN24Month
241.23TBN24Month
251.24TBN24Month
261.25TBN24Month
271.26TBN24Month
281.27Support Staff\nNote: To be assessed by consultant as per requirement of assignment
291.28Office Manager18Month
301.29Typist18Month
311.3Office Boy18Month
321.31Night Watchman18Month
331.32Transportation (Fixed Costs)
341.33The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance etc.\nA. For use of consultants18Month
351.34Duty Travel to Site (Fixed Costs)18Month
361.35Office Rent (Fixed Costs)
371.36The rent cost includes operation & maintenance, cleaning, repairs etc for the entire duration of services.18Month
381.37Office Supplies, Utilities and Communication (Fixed costs)
391.38Office Supplies Drafting18Month
401.39Supplies Computer18Month
411.4Running costs18Month
421.41Domestic and International Communication18Month
431.42Office Furniture and Equipment (Rental)
441.43Office Furniture and Equipment1Lumpsum
451.44Reports and Document Printing
461.45Monthly Reports (3 copies per month)54Nos
471.46Inception Report & QAP3Nos
481.47Environment and Social Impact Screening Report4Nos
491.48Draft Feasibility Report4Nos
501.49Final Feasibility Report6Nos
511.5Strip Plan with LA Report6Nos
521.51Draft LA Clearances I Report4Nos
531.52Final LA and Clearances I Report4Nos
541.53Draft Environment Assessment report & RAP4Nos
551.54Final Environment Asessment report & RAP6Nos
561.55Draft Detailed Design Report & Drawings etc.4Nos
571.56Draft EMP4Nos
581.57Draft Bidding Document4Nos
591.58Final Detailed Project Report with Bill of Quantities, cost estimates, updated Drawings etc.6Nos
601.59Final EMP6Nos
611.6Final Bidding Documents6Nos
621.61Draft 3(a), 3A and 3D notification or equivalent publication as per prevailing LA act of area under consideration as per NH act or State act or relevant act for land acquisition (03 copies each)9Nos
631.62LA & Clearances II report6Nos
641.63Survey and Investigation
651.64A. Topographical Survey (Fixed Rate)
661.65Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer.1Lumpsum
671.66Detailed topographic surveys using mobile/ aerial LiDAR or better technology1Lumpsum
681.67B. Investigation (Fixed Cost)
691.68Road and Bridge Inventory1Lumpsum
701.69FWD Test and Pavement Evaluation1Lumpsum
711.7Roughness Survey1Lumpsum
721.71Axle Load Survey1Lumpsum
731.72Material Survey and Investigation1Lumpsum
741.73Sub-grade Investigation1Lumpsum
751.74Traffic Survey1Lumpsum
761.75Socio-economic & Census Survey / Studies1Lumpsum
771.76Land Acquisition Studies1Lumpsum
781.77Sub-soil Investigation for Tunnel
791.78Boring in all type of Soils (other than hard rock)2000Meter
801.79Boring in hard rock300Meter
811.8C. Net Work Survey and GPR
821.81Net work Survey of the existing Highway as a repository for civil work as per directions from Authority1Lumpsum
831.82GPR Survey for Detection of under ground utilities1Lumpsum
841.83Cost of supply and fixing Boundary Pillars
851.84Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum)1Lumpsum
861.85Land Acquisition Team including support staff and logistics/transportation
871.86A. Land Acquisition Team including support staff
881.87Ex-Land Revenue Inspector/ Officer or equivalent8Month
891.88Ex-Kanoogo/ Girdwar or equivalent8Month
901.89Ex-Patwari or equivalent8Month
911.9Typist8Month
921.91Peon8Month
931.92B. Logistics for Land Acquisition Team
941.93Computer including necessary peripherals8Month
951.94Printers8Month
961.95Vehicles (Bolero or equivalent) with monthly running limit of 4000 km8Month
972For Phase 3 (Construction Supervision and Maintenance)
982.01Remuneration for Local Staff (inclusive of per diem allowance)\n
992.02Team Leader cum Senior Highway Engineer39Month
1002.03Resident cum Highway Engineer108Month
1012.04Senior Bridge Engineer39Month
1022.05Highway cum Pavement Engineer24Month
1032.06Senior Quality cum Material Expert24Month
1042.07Road/Traffic Safety Expert23Month
1052.08Tunnel Design Expert24Month
1062.09Senior Geotechnical Engineer8Month
1072.1Sub Professional Staff (To be assessed by consultant as per requirement of assignment and one sub-professional be a fresh graduate)
1082.11Survey Enginner58Month
1092.12Assistant Highway Engineer132Month
1102.13CAD Expert12Month
1112.14Environmental Engineer6Month
1122.15Assistant Bridge Engineer48Month
1132.16Assistant Quality cum Material Engineer72Month
1142.17Electrical Engineer7Month
1152.18HTMS/Toll Expert3Month
1162.19Quantity Surveyor32Month
1172.2Horticulture Cum Landscaping Expert36Month
1182.21Tunnel Safety Expert12Month
1192.22Geologist4Month
1202.23Support Staff\nNote: To be assessed by consultant as per requirement of assignment
1212.24Office Manager84Month
1222.25Accountant cum Cashier84Month
1232.26Steno Cum Computer Operator84Month
1242.27Office Boy84Month
1252.28Transportation (Fixed rate on rental basis)
1262.29The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance etc. for all complete approx 3000Km/month run84Month
1272.3Duty Travel to Site (Fixed Costs)84Month
1282.31Office Rent (Fixed Costs)
1292.32Minimum 200 Sqm area of office shall be rented. The rent cost includes Electricity, water charges, maintenance, cleaning, repairs etc complete.48Month
1302.33Office Supplies, Utilities and Communication (Fixed costs)
1312.34Office Supplies84Month
1322.35Drafting Supplies84Month
1332.36Computer Running costs84Month
1342.37Domestic and International Communication84Month
1352.38Office Furniture and Equipment (Rental)
1362.39Office Furniture and Equipment48Month
1372.4Reports and Document Printing
1382.41Monthly Reports (3 copies per month)252Nos
1392.42Half Yearly Reports24Nos
1402.43Various others reports as provided in the Concession Agreement such as Completion Report4Nos
1412.44Road Survey Equipment
1422.45Surface defects detection and roughness measurement using Network Survey Vehicle960Nos
1432.46Pavement strength measurement using FWD480Nos
1442.47Bridge inspection using Mobile Bridge Inspection Unit or Drone technology960Nos
1452.48Road signs inspection using Retro Reflectometer480Nos
1462.49Contingencies
1472.5A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. The provisions of Contingency shall be operated with the specific approval from the Competent Authority in CE (P) Beacon1Lumpsum

AI Tender Summary

OUR REF NO 26928287
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 23-03-2021
Authority
Authority Name Border Roads Organisation
Work Description Pmc Services Including Feasibility Study Preparation Of Dpr Preconstruction Activities And Construction Supervision For Development Of Poonch-Uri Road To Nhdl Specifications ( Tentative Length-120 Km ) In Ut Of J And K Under Pmdp J And K - 2015 , For Phase 1 And 2 ( Dpr And Preconstruction Activities ) , Remuneration For Local Staff ( Inclusive Of Per Diem Allowance ) , Team Leader Cum Senior Highway Engineer , Senior Bridge Engineer , Highway Cum Pavement Engineer , Material -Cum-Geotechnical Engineer-Geologist , Senior Survey Engineer , Road / Traffic Safety Expert , Environmental Specialist , Quantity Surveyor / Documentation Expert , Land Acquisition Expert , Utility Expert , Tunnel Design Expert , Senior Geotechnical Engineer , Sub Professional Staff ( To Be Assessed By Consultant As Per Requirement Of Assignment And One Sub-Professional Be A Fresh Graduate ) , Tbn , Tbn , Tbn , Tbn , Tbn , Tbn , Tbn , Tbn , Tbn , Tbn , Tbn , Tbn , Support Staff Note: To Be Assessed By Consultant As Per Requirement Of Assignment , Office Manager , Typist , Office Boy , Night Watchman , Transportation ( Fixed Costs ) , The Vehicles Provided By The Consultants Shall Include The Cost For Rental , Drivers , Operation , Maintenance , Repairs , Insurance Etc . A . For Use Of Consultants , Duty Travel To Site ( Fixed Costs ) , Office Rent ( Fixed Costs ) , The Rent Cost Includes Operation & Maintenance , Cleaning , Repairs Etc For The Entire Duration Of Services . , Office Supplies , Utilities And Communication ( Fixed Costs ) , Office Supplies Drafting , Supplies Computer , Running Costs , Domestic And International Communication , Office Furniture And Equipment ( Rental ) , Office Furniture And Equipment , Reports And Document Printing , Monthly Reports ( 3 Copies Per Month ) , Inception Report & Qap , Environment And Social Impact Screening Report , Draft Feasibility Report , Final Feasibility Report , Strip Plan With La Report , Draft La Clearances I Report , Final La And Clearances I Report , Draft Environment Assessment Report & Rap , Final Environment Asessment Report & Rap , Draft Detailed Design Report & Drawings Etc . , Draft Emp , Draft Bidding Document , Final Detailed Project Report With Bill Of Quantities , Cost Estimates , Updated Drawings Etc . , Final Emp , Final Bidding Documents , Draft 3 ( A ) , 3A And 3D Notification Or Equivalent Publication As Per Prevailing La Act Of Area Under Consideration As Per Nh Act Or State Act Or Relevant Act For Land Acquisition ( 03 Copies Each ) , La & Clearances Ii Report , Survey And Investigation , A . Topographical Survey ( Fixed Rate ) , Topographic Survey Including Hire Charges For Equipment And Supply Of Survey Teams Comprising Of Project Survey Filed Staff Etc . Inclusive Of Cost Of Materials , Labourer . , Detailed Topographic Surveys Using Mobile / Aerial Lidar Or Better Technology , B . Investigation ( Fixed Cost ) , Road And Bridge Inventory , Fwd Test And Pavement Evaluation , Roughness Survey , Axle Load Survey , Material Survey And Investigation , Sub-Grade Investigation , Traffic Survey , Socio-Economic & Census Survey / Studies , Land Acquisition Studies , Sub-Soil Investigation For Tunnel , Boring In All Type Of Soils ( Other Than Hard Rock ) , Boring In Hard Rock , C . Net Work Survey And Gpr , Net Work Survey Of The Existing Highway As A Repository For Civil Work As Per Directions From Authority , Gpr Survey For Detection Of Under Ground Utilities , Cost Of Supply And Fixing Boundary Pillars , Procuring And Fixing Boundary Pillars And Its Installation , Complete In All Respect As Per Irc:25 , 1967: Wherever The Proposed Alignment Follows The Existing Alignment , The Boundary Pillars Shall Be Fixed At An Interval Of 200M On Either Side Of Proposed Right Of Way . Wherever There Is A Proposal Of Realignment Of The Existing Highway And / Or Construction Of New Bypasses , Consultant Shall Fix Boundary Pillars Along The Proposed Alignment On The Extreme Boundary On Either Side Of The Project Highway At 50 M Interval . ( Lumpsum ) , Land Acquisition Team Including Support Staff And Logistics / Transportation , A . Land Acquisition Team Including Support Staff , Ex-Land Revenue Inspector / Officer Or Equivalent , Ex-Kanoogo / Girdwar Or Equivalent , Ex-Patwari Or Equivalent , Typist , Peon , B . Logistics For Land Acquisition Team , Computer Including Necessary Peripherals , Printers , Vehicles ( Bolero Or Equivalent ) With Monthly Running Limit Of 4000 Km , For Phase 3 ( Construction Supervision And Maintenance ) , Remuneration For Local Staff ( Inclusive Of Per Diem Allowance ) , Team Leader Cum Senior Highway Engineer , Resident Cum Highway Engineer , Senior Bridge Engineer , Highway Cum Pavement Engineer , Senior Quality Cum Material Expert , Road / Traffic Safety Expert , Tunnel Design Expert , Senior Geotechnical Engineer , Sub Professional Staff ( To Be Assessed By Consultant As Per Requirement Of Assignment And One Sub-Professional Be A Fresh Graduate ) , Survey Enginner , Assistant Highway Engineer , Cad Expert , Environmental Engineer , Assistant Bridge Engineer , Assistant Quality Cum Material Engineer , Electrical Engineer , Htms / Toll Expert , Quantity Surveyor , Horticulture Cum Landscaping Expert , Tunnel Safety Expert , Geologist , Support Staff Note: To Be Assessed By Consultant As Per Requirement Of Assignment , Office Manager , Accountant Cum Cashier , Steno Cum Computer Operator , Office Boy , Transportation ( Fixed Rate On Rental Basis ) , The Vehicles Provided By The Consultants Shall Include The Cost For Rental , Drivers , Operation , Maintenance , Repairs , Insurance Etc . For All Complete Approx 3000Km / Month Run , Duty Travel To Site ( Fixed Costs ) , Office Rent ( Fixed Costs ) , Minimum 200 Sqm Area Of Office Shall Be Rented . The Rent Cost Includes Electricity , Water Charges , Maintenance , Cleaning , Repairs Etc Complete . , Office Supplies , Utilities And Communication ( Fixed Costs ) , Office Supplies , Drafting Supplies , Computer Running Costs , Domestic And International Communication , Office Furniture And Equipment ( Rental ) , Office Furniture And Equipment , Reports And Document Printing , Monthly Reports ( 3 Copies Per Month ) , Half Yearly Reports , Various Others Reports As Provided In The Concession Agreement Such As Completion Report , Road Survey Equipment , Surface Defects Detection And Roughness Measurement Using Network Survey Vehicle , Pavement Strength Measurement Using Fwd , Bridge Inspection Using Mobile Bridge Inspection Unit Or Drone Technology , Road Signs Inspection Using Retro Reflectometer , Contingencies , A Fixed Amount Of Indian Rupees One Million Shall Be Included In The Financial Proposal . The Provisions Of Contingency Shall Be Operated With The Specific Approval From The Competent Authority In Ce ( P ) Beacon
Basic Detail
Tender No CE (P)/BCN/PMC/01/2020-21
Bidding Type Tender
Location
City Poonch Uri road
State Jammu And Kashmir
Key Dates
Publish Date 10 Feb 2021
Submission Date 23 Mar 2021
Open Date 24 Mar 2021
Finance
Tender Value Ref. Documents
Tender Fee 5000
EMD Ref. Documents
Exemption Not Available
Document List
PMCDocumentPURd.pdf
BOQ_646757.xls
753664FF-CAC8-4DC6-8B67-CEA5E1C53120.html
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Feb 10, 2021
11:30 IST

Tender Published

Tender notice published.

Completed
Mar 23, 2021
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Mar 24, 2021

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

PMCDocumentPURd.pdf

xls

BOQ_646757.xls

html

753664FF-CAC8-4DC6-8B67-CEA5E1C53120.html

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender