| 1 | 1 | Cutting of Road, metalled road i/c disposal of dismantled material i/c all cost of labour T&P etc. | BI01010001010000000000000515BI0100001104 | 12 | CUM |
|---|
| 2 | 2 | Excavation in Foundation in Ordinary soil for structure i/c all lead & reqd. lifts as per site requirement and with proper disposel of excavated earth as per directed by engineer in charge for proper completion of work | BI01010001010000000000000515BI0100001105 | 175 | CUM |
|---|
| 3 | 3 | Cement Concrete in (1:3:6) mix with Cement, Coarse Sand (F.M. Not less than 2.00), Stone Grit (A-40) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | BI01010001010000000000000515BI0100001106 | 17.7 | CUM |
|---|
| 4 | 4 | Cement Concrete in (1:4:8) mix with Cement, Coarse Sand (F.M. Not less than 2.00), Stone Grit (A-40) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | BI01010001010000000000000515BI0100001107 | 4.65 | CUM |
|---|
| 5 | 5 | Ist class Brick work in 1:4, Cement Coarse Sand (F.M. Not less than 2.00), morter in warping i/c cost of material Labour & T&P etc complete for proper completion of work | BI01010001010000000000000515BI0100001108 | 112 | CUM |
|---|
| 6 | 6 | Struck Pointing in 1:2 Cement mortor including cost of all material, labour, T&P, Curing etc complete for proper completion of work | BI01010001010000000000000515BI0100001109 | 165 | SQM |
|---|
| 7 | 7 | Centering & shuttering for bridge, parapet and transitions i/c all cost of labour & T&P etc complete for proper completion of work | BI01010001010000000000000515BI0100001110 | 92 | SQM |
|---|
| 8 | 8 | Reinforced Cement Concrete in (1:1.5:3) mix with Cement, Coarse Sand (F.M. Not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | BI01010001010000000000000515BI0100001111 | 28.8 | CUM |
|---|
| 9 | 9 | Cement Concrete in (1:1:2) mix with Cement, Coarse Sand (F.M. Not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | BI01010001010000000000000515BI0100001112 | 3.75 | CUM |
|---|
| 10 | 10 | S/L of two coat tar Felt Painting including cost of all material, labour, T&P complete for proper completion of work | BI01010001010000000000000515BI0100001113 | 6 | SQM |
|---|
| 11 | 11 | Providing & Fixing 20mm thick Expansion Joint with angle iron both side & M.S. plate carring & filling of filler material of bitumin soil dust & Coarse Sand (F.M. Not less than 2.00), etc complete for proper completion of work | BI01010001010000000000000515BI0100001114 | 17.3 | RM |
|---|
| 12 | 12 | Cutting, bending, binding & placing in position of steel reinforcement with all wastage, carriage and including all labour material and T&P etc complete for proper completion of work | BI01010001010000000000000515BI0100001115 | 2.5 | MT |
|---|
| 13 | 13 | Providing and filling of local sand as back filling i/c cost of all material,labour and T&P complete for proper completion of work | BI01010001010000000000000515BI0100001116 | 230 | CUM |
|---|
| 14 | 14 | Providing and fixing of 75 mm Dia P.V.C. Pipe including cost of all material, labour, T&P etc for proper completion of work | BI01010001010000000000000515BI0100001117 | 4 | RM |
|---|
| 15 | 15 | Providing and Fixing of year Plate for proper completion of work | BI01010001010000000000000515BI0100001118 | 1 | No |
|---|
| 16 | 16 | Providing and fixing of B.M Plate for proper completion of work | BI01010001010000000000000515BI0100001119 | 1 | No |
|---|
| 17 | 17 | Supply and Fixing wheel Guard stone (Size 150mmx150mmx1500mm) for proper completion of work | BI01010001010000000000000515BI0100001120 | 4 | No |
|---|
| 18 | 18 | Earth work in Filling in Layers including cariage of earth from a distance of 1.00 Km & all lifts i/c ramming dressing & all labour T&P etc. | BI01010001010000000000000515BI0100001121 | 900 | CUM |
|---|
| 19 | 19 | M-100 Brick on edge paving i/c Joints filleds with sand including cost of all material, labour, T&P etc for proper completion of work | BI01010001010000000000000515BI0100001122 | 375 | SQM |
|---|