Name of Work: <REPAIRING OF VEH BA NO 12D-187718N EICHER 10.75 (LCV) 3 TON FOR GE (AF) BORJHAR) )>
Sl.No.
Item Description
Item Code / Make
Quantity
Units
1
1.01
(a) TUNNING/SERVICEING OF ENGINE, FUEL SYSTEM, SELF STARTER/TAIL CROWN AND COOLING SYSTEM. Dismantling of FIP, Fuel system, ignition and cooling system complete and cleaning inspecting and removing all U/S spares and refixing the same after replacement the following spares and the related machinery works incl testing.- Job 01.\n(i) Engine Oil. Ltrs 14.\n(ii) Bypass Filters. Pcs 01.\n(iii) Mobile Filter. Pcs 01.\n(iv) Distilled water. Ltrs 10.\n(v) Coolant. Ltrs 05.\n(vi) Break fluid DOTB. Ltrs 01.\n(vii) Disel Filter. Pcs 02.\n(viii) Water Sperator. Pcs 01.\n(ix) Magnetic puller sensor FIP. Nos 01.\n(x) Soleinod Switch.Nos 01. \n(xi) Filter Glassly Delphi. Nos 01.\n(xii) Gear Oil. Ltrs 05.\n(xiii) Cheak nut 32 No. Pcs 01.\n(xiv) Axle Gasket. Set 01.\n(xv) Radiotor Servicing. Nos 01.\n(xvi) Diesel main hose. Mtr 02.\n(xvii) Claim. Pcs 02.\n(xviii) Diesel Tank Servicing. Nos 01.\n(xix) Glassy Filter Tank. Nos 01.\n(xx) Electric work (Fuel meter, wiring check, indicator horn etc). Nos 01.\n
Job.
1
Job
2
1.02
(b) Repairing/Overhauling of King Pin, Suspension system, sterring system, all wheel hub greasing and alignment incl nody work. Dismantling taking down all the components and related items of the KIng pin/Suspension steering and wheels, cleaning inspecting all the items and spares and refixing/reassembling the same after greasing of all four wheels hub necessary repairing, wheel alignment replacement of the following items. Job 01.\n(i) Castrol Grease. KGS 06.\n(ii) Hub Oil Seal (outer). Pcs 04.\n(iii) Hub Oil seal (inner). Pcs 04.\n(iv) Anabond G maker. Pcs 01.\n(v) Lock. Pcs 02.\n(vi) Shim. Set 01.\n(vii) Lock nut. Pcs 02.\n(viii) 32112N bearing tyspin-1. Nos 01.
Job..
1
Job
3
1.03
(ix) King Pin. Set 01.\n(x) Pin bearing. Set 01.\n(xi) Shim. Set 02.\n(xii) Outer lock. Set 02.\n(xiii) Brass Pinbush Std Steel of 04 Pcs. Set 01.\n(xiv) Blance rod bushing. Set 01.\n(xv) 8 socker bushing rubber. Set 01.\n(xvi) Lock Set Kit. Set 01.\n(xvii) UJ cross. Pcs 04.\n(xviii) Holder cross. Pcs 01.\n(xix) Centre bushing Assly (157026). Pcs 01.
Job…
1
Job
4
1.04
(xx) Drag Link joints. Set 02\n(xxi) Spring maint 2nd helper. Pcs 08.\n(xxii) Spring main 4 side 1st. Pcs 04.\n(xxiii) Hanger joints. Pcs 04.\n(xxiv) Hanger. Pcs 06.\n(xxv) Cycle Pin. Set 04.\n(xxvi) Bushing. Set 04.\n(xxvii) Centre Bolt. Pcs 04.\n(xxviii) 17 Nos front bushing. Pcs 06.\n(xxix) Welding gag/cutting. Nos 01.\n(xxx) Hole making. Nos 08.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.