Road Transport and Highways Government Departments Closing in 0 days TDR #26908195

Bridgework Widening Of Minor Bridge At Km 3/8 Of Peraiyur - Melapatti Road Including Construction Of Protective Work ( Mdr )

Issued by Government Departments · Peraiyur, Tamil Nadu
Tender Value
Ref. Documents
Estimated cost
Bid Submission
24 Feb 2021
0 days left
EMD
29500
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Peraiyur → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Bridgework Widening Of Minor Bridge At Km 3/8 Of Peraiyur - Melapatti Road Including Construction Of Protective Work ( Mdr )

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 22-Feb-2021 Time Extension Date 24-Feb-2021

BOQ

Widening Minor Bridge at km 3/8 of Peraiyur - Melapatty Road including construction of Protective work (MDR)
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11I. Widening of Minor Bridge\n\nDismantling the Plain Cement Concrete grade M20 & aboveas specified by departmental officers and cleanig away the debris and carefully stacking the useful materials including all labour and all other incidental charges etc.,complete Item No : 375.9Cubic Metre
22Dismantling the Reinforeced Cement Concrete grade M25 specifiedified by departmental officers and cleanig away the debris and carefully stacking the useful materials including all labour and all other incidental charges etc.,complete Item No : 386.92Cubic Metre
33Earth work excavation in all classes of soils except soft rock requiring blasting and depositing on bank with initial leads of 10m and initial lifts of 2m as per SS20B, including cost of all labour, equipments and all other incidental charges such as bailing out water, sheeting, shoring, bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus earth with all leads etc., complete as per MORT & H specifications 900,301,305 for Abutment, Wing Wall.219.88Cubic Metre
44Earth work excavation in Soft disintegrated rock not requiring blasting and hard roack requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all other incidental charges such as bailing out water, sheeting, shoring, bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus earth with all leads etc., complete as per MORT & H specifications 900,301,305 for Abutment, Wing Wall.61.34Cubic Metre
55Vibrated Cement Concrete of Grade M10 Nominal mix 1:3:6, using 40mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site including form work and centering, using soft water, labour charges for mixing, transporting and placing in position, compacting, finishing and curing, working at depths, hire charges for tools and plants and incidental charges, etc., complete, as per standard specifications for Levelling Course Below Abutments7.45Cubic Metre
66Vibrated Cement Concrete of Grade M20, using ISS HBG graded metal stone including form work and centering using soft water cost and conveyance of all materials to site including cost of cement at site farm work and centering using soft water labour charges for mixing, transporting, laying, vibrating,l curing, concrete working at depth, hire charges for tools and plants including all other incidental charges etc., complete as per standard specifications for Footing Under Abutment & Returns & Pier Foundaton Below Sill Level141.51Cubic Metre
77Vibrated Cement Concrete of Grade M20, using ISS HBG graded metal stone including form work and centering using soft water cost and conveyance of all materials to site including cost of cement at site farm work and centering using soft water labour charges for mixing, transporting, laying, vibrating,l curing, concrete working at depth, hire charges for tools and plants including all other incidental charges etc., complete as per standard specifications for Substructure of Abutments, Wings & Piers Above Sill Level42.5Cubic Metre
88Vibrated Cement Concrete of Grade M30 (Design mix), using ISS HBG graded metal stone including form work and centering using soft water cost and conveyance of all materials to site including cost of cement at site farm work and centering using soft water labour charges for mixing, transporting, laying, vibrating,l curing, concrete working at depth, hire charges for tools and plants including all other incidental charges etc., complete as per standard specifications for Bedblock Cum Dirtwall2.3Cubic Metre
99Providing and fixing PVC seepage pipes of 110mm dia 4kg/cm2 of required lengths for abutments wings including cost and conveyance of all materials to worksite and labour charges for fixing , including fixing charges etc, complete to drain the backfill as per standard specifications.32Nos.
1010Providing and fixing KRAFT PAPER for full width of seating of deck slab and including cost and conveyance to worksite, labour for fixing the same in correct position and all other identical charges etc.,complete.3.03Square Metre
1111Vibrated Reinforced cement concrete of design mix M30(Design mix) using 20mm ISS graded HBGS metal stone including cost and conveyance of all materials to site including cost of cement at site including formwork and centering, using soft water, labour charges for mixing, transporting and placing in position, vibrating and compacting, finishing and curing, working at heights, hire charges for tools and plants including all other incidental charges etc., complete as per standard specifications for Deck Slab.20.89Cubic Metre
1212Providing FILTER MEDIA 600mm thick behind abutments and returns using filter material with 53mm to 5.6mm metal confirming to CI of MORT&H/2001 well packed with smaller size towards the soil and bigger size towards the wall including cost of conveyance to works site including all other incidental charges etc., complete.13.21Cubic Metre
1313Filling behind Abutment and Wings with clean gritty Gravel of Ø value not less than 350 including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc., complete as per standard specifications.6.52Cubic Metre
1414Providing and fixing PVC Expansion joint in between Deck Slab over abutment and pire as shown in the drawing including cost and conveyance of Expansion joint Shalimar pad and joint sealent etc.,complete.10.2Running Metre
1515Vibrated cement concrete M20 using 40mm ISS graded hard broken granite metal including cost and conveyance of all materials to site including cement at site including cost of formwork using soft water, labour charges for mixing, transporting, laying, curing concrete and working on heights, hire charges for all tools and plants and incidental charges etc., complete as per relevant specification for Base Course Below Approach Slab.2.4Cubic Metre
1616Vibrated Reinforced cement concrete of M30 (design mix) using 20mm ISS graded metal including cost and conveyance of all materials to site and using cement at site but excluding cost and fabrication of steel but including labour charges for mixing, laying, vibrating, curing concrete, hire charges for tools and plants including all other incidental charges etc., complete as per relevant specification for Approach Slab.5.25Cubic Metre
1717Vibrated cement concrete M30 (Design mix) using 25mm, 12mm and 6mm IRC sized hard granite metal including cost and conveyance of all materials to site, cost of premoulded expansion joints and fixing the same in position including cost and labour charges for laying compacting curing including all incidental charges etc. complete for wearing coat 75mm uniform thickness over deck slab and Approach slab.49.5Square Metre
1818Vibrated Reinforced cement concrete M40 (Design mix) using 20mm ISS graded HBGS metal stone including cost and conveyance of all materials to site including cement at site including cost of formwork using soft water, labour charges for mixing, transporting and placing in position, vibrating and compacting, laying and curing concrete, hire charges for tools and plants including shoring, shutting etc., complete as per relevant specification for Crashbarrier Over Deck Slab-1RM (For Estimate Purpose,mix 1:1.5:3).7.27Cubic Metre
1919Vibrated cement concrete M20 using 40mm ISS graded hard broken granite metal including cost and conveyance of all materials to site including cement at site including cost of formwork using soft water, labour charges for mixing, transporting, laying, curing concrete and working on heights, hire charges for all tools and plants and incidental charges etc., complete as per relevant specification for PCC Parapets over Wings4.41Cubic Metre
2020Providing and fixing of Galvanised iron drainage spouts 100mm dia as per GOI drawing SD/205 with grating arrangements at top as shown in the drawing and 100mm dia drainage spout projecting at least 600mm beyond the bottom of desk slab as shown in the drawing including cost and conveyance of Galvanized iron pipes and flats and fixing them in position etc., complete as per standard specifications4Nos.
2121Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule and cost of HCRM steel confirming to IS 1786 at site including fabrication, labour charges for cleaning the rods straightening cutting bending tying grills, including overlapping to the required length wherever necessery and placing the reinforced in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete as per standard specifications. Fe-500 Grade 1 MT.3.804MT.
2222Supply and fabrication of Fe-240 Mild steel grade I required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete as per section 2706 of MORT&H Specifications (Fifth Revision - 2013)0.356MT.
2323II. Cosntruction of Retaining wall\n\nEarthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with initial lead and lifts and all other incidental charges such as shoring, strutting, baling out water, forming protective bunds, coffer dam where ever necessary for foundation of culvert as per SS20B and MoRTH Specification Cl. 2903.89.9Cubic Metre
2424Vibrated Cement Concrete M20 nominal mix 1:2:4 using 40mm ISS size HBG metal including cost and coveyance of all materials to site, including cost of form work and centering, labour charges for mixing, laying, compacting, including hire and fuel charges for all tools and plants engaged, finishing and curing, Tools and plants and other incidental charges such as baling out water whereever necessary forming protective bunds, coffer dams., etc complete for foundation of body wall and MoRTH Specification Cl. 1000, 1500, 1700 & 2908.for below sill level.70.7Cubic Metre
2525Vibrated Cement Concrete M20 nominal mix 1:2 :4 using 40mm ISS size HBG metal including cost and coveyance of all materials to site, including cost of form work and centering, labour charges for mixing, laying, compacting, including hire and fuel charges for all tools and plants engaged, finishing and curing, tools and plants and other incidental charges such as baling out water wherever necessary forming protective bunds, coffer dams etc., complete for foundation of body wall and MoRTH Specification Cl. 1000, 1500, 1700 & 2908 for Above sill level.104.9Cubic Metre
2626Providing and fixing PVC seepage pipes of 110mm dia 4kg/cm2 of required lengths for abutments wings including cost and conveyance of all materials to worksite and labour charges for fixing , including fixing charges etc, complete to drain the backfill as per standard specifications.70Nos.
2773Calculation of SubTotal, GST and Total carried out by system automatically
2890.1Sub Total Amount for above all items (excluding GST)1subtotal
2990.2GST 12% for above SubTotal Amount1gst

AI Tender Summary

OUR REF NO 26908195
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 24-02-2021
Authority
Authority Name Highways Department
Work Description Bridgework Widening Of Minor Bridge At Km 3/8 Of Peraiyur - Melapatti Road Including Construction Of Protective Work ( Mdr )
Basic Detail
Tender No TN_No_25_2020_21
Bidding Type Tender
Location
City Peraiyur
State Tamil Nadu
Key Dates
Publish Date 22 Feb 2021
Submission Date 24 Feb 2021
Open Date 25 Feb 2021
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 29500
Exemption Not Available
Document List
C2310867-D3E0-439C-9C75-2513574DC368.html
TenderDocument.pdf
Tendernotice_1.pdf
BOQ_232372.xls

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Feb 22, 2021
11:30 IST

Tender Published

Tender notice published.

Completed
Feb 24, 2021
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Feb 24, 2021
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Feb 25, 2021

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

C2310867-D3E0-439C-9C75-2513574DC368.html

pdf

TenderDocument.pdf

pdf

Tendernotice_1.pdf

xls

BOQ_232372.xls

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders