Renovation Of Docking Yard Of Floating Boat Jetty, THE TRAVANCORE COCHIN CHEMICALS UDYOGAMANDAL-Kerala

Travancore Cochin Chemicals Limited has published Renovation Of Docking Yard Of Floating Boat Jetty. Submission Date for this Tender is 01-03-2021. Jetty Tenders in THE TRAVANCORE COCHIN CHEMICALS UDYOGAMANDAL Kerala. Bidders can get complete Tender details and download the document.




Tender Notice

26899538
Corrigendum : Renovation Of Docking Yard Of Floating Boat Jetty
Open Tender
Indian
Kerala
THE TRAVANCORE COCHIN CHEMICALS UDYOGAMANDAL
01-03-2021

Tender Details

Renovation Of Docking Yard Of Floating Boat Jetty

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 22-Feb-2021 Date Date 01-03-2021

Key Value

Document Fees
INR 160 /-
EMD
INR 18530.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Renovation of docking yard of floating boat jetty.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Chipping and demolishing cement concrete, reinforced or plain of all grades, floors, slabs, vertical walls etc., upto a depth of 2m from existing ground level and upto a height of 8m from existing ground level and at all locations, chipping with chisel and hammer of permissible weight, cutting M.S. materials by hacksaw or gas cutting of permitted etc., including conveying debris to low lying areas pointed out and levelling inside the factory compound, all labour charges, hire for tools and plants, scaffolding charges, all safety precautions etc., complete. 6 Cu.M
2 2 Surface preparation of the concrete surface by chipping concrete surface and removing all loose/damaged portions removing old paints and all other forgine materials over the concrete surface by scrapping or buffing with electriacly operated hand tools etc to remove all forgine matterials like paint, alge etc and prepare the concrete surface by hacking the concrete surface with chipping chisel , remove the rusts on steel bars by suitable metods washing the same throughly etc, to get good bond between old conctrete and new ferro cement plastering works , removal and disposal of all waste materials at eastern yard including all labour charges, hire for tools,cost of consumables safety measures, scafolding charges etc.complete 90 Sq.M
3 3 Fabricating, erecting, setting, bolting/welding in position for columns and beams embedded using, ISMB, sections etc., of all sizes at all locations and elevations upto 20M from ground level, including straightening, marking, cutting, drilling, holding, welding, bolting etc., all as per standard practices, scrapping thoroughly to remove rust, painting one coat of metal primer, including all labour charges, hire for tools, plants, welding sets, gas cutting equipments, derricks, tackles, all safety precautions to workers, materials, pipe lines, cables, all cost of consumables such as welding rods, cutting gas etc., complete. (M.S. structurals will be issued free of cost by TCC). 1200 Kg
4 4 Providing temporary support to trusses using fabricated column supports using old/new M.S. sections, supporting, bracing, removing after column re-building etc., all cost of fabrication assembly and disembly etc., all labour charges, hire for tools and plants, all safety precautions and all other incidentals etc., complete. 3 Set
5 5 Reinforcement work with M.S/Tor steel rods, corrosion resistant steel rods of all dia for foundation footings, rafters, columns, beams, tie beams, lintels, slabs, stair cases, sunshades, equipment foundations, curved walls etc., of all sizes and shapes, excluding cost of all reinforcement rods (which will be issued free of cost by TCC), but including cost of 16g G.I. annealed binding wire, straightening, marking, bending, placing in position, tying with required binding wire, providing required number of cover blocks as per instructions and standard practices for work upto 20M above ground level, including all labour charges, hire for tools and plants, cost of consumables, all conveyance charges, all safety precautions etc., complete. 1200 Kg
6 6 Setting up scaffolding of 2M with using bamboo poles, M.S. pipes, scaffolding structure etc., upto a height of 5M from existing ground level, joining the pipe or poles using scaffolding clamps tying with coir etc., providing wooden planks for platform at horizontal position, clearing area after completing the work, including all labour charges, hire for tools, cost of consumables, all safety precautions etc., complete. 50 Sq.M
7 7 Formwork using plywood sheets, M.S. sheets, wooden plants, wooden/M.S. props, struts, bracings etc., for columns, beams, lintels, sunshades, slabs of all sizes, shapes and thickness at all locations and elevations upto 20m from existing ground level as per standard practices, dissembling the formwork and cleaning the area after the required period, including all labour charges, hire for formwork materials, cost of consumables, all safety precautions etc., complete. 70 Sq.M
8 8 Fixing GI weld mesh 25 mm x 25 mm x 10 Guage in position in line and level and plumb with sufficient overlap with out extra payment before ferro cement finish coat plastering after preparation of old concrete surface by hacking with chipping chisel,wire brush, water jet washing etc, cost of all materials and consumables, tools, safety measures, scafolding charges etc including cost of fixing the weld mesh in position eighter by tac welding or by screwing them with slieve method etc .complete 40 Sq.M
9 9 Ferro cement plastering with cement mortar 1:2 ratio, 32 mm thick (12 mm thick plastering as base coat over the fibre mesh/MS weld mesh and second coat of 20mm thick 2 layers , total 32 mm thick),providing additional thickness at the area of concrete removed/where ever reqired for slabs bottom , side wall of RCC cable rack at all elevations and locations up to 2M level, with POBS make M-sand, and mixing the suitable admitxuers supplied by TCC and minimum of 7 days curing after plastering including fixing steel bars if required including all labour charges, hire for tools and plants, cost ofall materials, scafolding charges, cost of consumables, all safety precautions etc. complete (Required cement will be issued free of cost by TCC) 40 Sq.M
10 10 Earth work excavation on top soil, including uprooting,site clearing etc.. upto a depth of 30cm in depth but excluding 1.5 m in width, conveying excess earth or debris after refilling to places pointed out inside factory compound and levelling with a lead of 50M and all lift, including all labour charges, hire for tools and plants, all safety precautions etc., complete. 350 Sq.M
11 11 Earth work excavation in all classes of soil, including hard narrikkal which needs chipping with chisel and hammer in debris of all sorts upto a depth of 1m from ground level, bailing/pumping out water with required number of fuel driven pumps, ground water, seepage water, water leaking from nearby drains, arranging delivery lines in such a way not to interfere with the existing drain system in the pollution control point of view, conveying excess earth or debris after refilling to places pointed out inside factory compound and levelling with a lead of 1000M and all lift, including all labour charges, hire for tools and plants, all safety precautions etc., complete. 52.5 Cu.M
12 12 Formwork using plywood sheets, M.S. sheets, wooden plants, wooden/M.S. props, struts, bracings etc., for foundation,footings of required shapes and thickness at all locations and elevations upto 1m from existing ground level as per standard practices, dissembling the formwork and cleaning the area after the required period, including all labour charges, hire for formwork materials, cost of consumables, all safety precautions etc., complete. 60 Sq.M
13 13 Reinforced cement concrete 1:1 1/2:3 using 20mm and down grade approved quality hard blue granite broken stone for foundation footings, equipment foundations, plinth, beams, columns, tie beams, slabs, lintels, sunshades, drains, vertical walls, stairs, cover slabs, curved walls of all sizes and shapes, including all labour charges, hire for tools, plants and pumpsets, cost of consumables, all safety precautions etc., complete. (Required quantity of cement and steel will be issued free of cost) 56 Cu.M
14 14 Providing plain cement concrete 1:4:8 mix to all thickness using 40mm nominal size blue granite broken stone to the required lines and levels for foundations, floorings etc., to a depth of 5m from below ground level and upto a height of 10m above ground level, mixing, placing, consolidating, bailing/ pumping out water of all sorts, including cost of all materials, shuttering for edges, labour charges, hire for tools, plants and pumpsets etc., all consumables, were and tear, all safety precautions etc., complete. (Required cement will be issued free of cost) . 2.5 Cu.M
15 15 Plastering with cement mortar 1:3, 12mm thick at all elevations and locations, including racking and hacing the surface for proper grip, plastering, including all labour charges, scaffolding charges, cost of all consumables, curing charges, all safety precautions etc., complete. (Required cement will be issued free of cost by TCC) 100 Sq.M
16 16 Fabricating and fixing position light weight GI tubular sections of 2 mm thick rafters and purlins over the vertical post with GI top edge curve shape with 100 cm radius approx. with 80 mm NB round tube 2.6 mm thick(12G) fitted on base plate and it should be fixed on the existing bolt on the RCC foundation to the required line, level and slope to the GI tubular section upto a height 10 m from the ground level using self driven fasteners SDF 55 mm screws class 3 of roofix make with rubber washer,etc.,edge opening of tubular sections to be covered with plate sections by welding,contractor should provide arrangements by welding the supports for roof side gutters to drain out rain water to the required line and slope. All the welding joints should be painted with company supplied welding joint spray paint,and all the GI structural members should be painted with one coat primer paint and two coats chlorinated rubber paint, supplied by TCC including all labour charges, hire for tools, consumables, safety measures like safety net, safety belt, safety shoes, goggles/face shield,life line etc as per rules, and safety work permit system etc. Required quantity of GI tubular sections,paint, foundation bolt and nut only will be issued free of cost by TCC complete 0.9 T
17 17 Providing and Fixing roofing, side cladding with Galvalume sheets of required size and shape in required position, lifting sheets to position, bolting with self driven bolts of approved size and quality at corrugated portion only, sealing bolt holes with sealants, all safety precautions for men and materials, at contractor's risk and cost, all labour charges and all other incidental expenses etc., complete, including all cost of sheets. (TATA/JSW,everlast, 0.50mm thick sheets to be used), all cost of roofing sheets,alloy bolts, sealing bolt holes with sealants, finishing etc complete 60 Sq.M
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail