Sdrf- -Desilting Of Manayathukad Chal And Connecting Thodes In Pallippuram Grama Panchayath
Tender Value
Ref. Documents
Estimated cost
Bid Submission
15 Feb 2021
0 days left
EMD
20100
Bank guarantee accepted
Document Fee
3360
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Pallippuram → Kerala
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Sdrf- -Desilting Of Manayathukad Chal And Connecting Thodes In Pallippuram Grama Panchayath
BOQ
| Work Name:SDRF - Desilting of Manayathukaduchal and connecting thodes n Pallippuram Panchayat . | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Scheme 1 (0m to 50m) starts from north side of gramina vayana shala taken as 0 M | BI01010001010000000000000515BI0100001113 | ||
| 2 | 1.01 | 2.6.1 : Earth work in all kinds of soil excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed as directed by the departmental officer at site. | BI01010001010000000000000515BI0100001114 | 150 | cum |
| 3 | 2 | scheme 2 50 M to 150 M | BI01010001010000000000000515BI0100001115 | ||
| 4 | 2.01 | 2.6.1 : Earth work in all kinds of soil excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed as directed by the departmental officer at site. | BI01010001010000000000000515BI0100001116 | 750 | cum |
| 5 | 2.02 | 2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared as directed by the departmental officer at site. | BI01010001010000000000000515BI0100001117 | 60 | sqm |
| 6 | 3 | Scheme 3 150 M to 250M | BI01010001010000000000000515BI0100001118 | ||
| 7 | 3.01 | 2.6.1 : Earth work in all kinds of soil excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed as directed by the departmental officer at site. | BI01010001010000000000000515BI0100001119 | 750 | cum |
| 8 | 3.02 | 2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared as directed by the departmental officer at site. | BI01010001010000000000000515BI0100001120 | 60 | sqm |
| 9 | 4 | Scheme 250M to 350 M | BI01010001010000000000000515BI0100001121 | ||
| 10 | 4.01 | 2.6.1 : Earth work in all kinds of soil excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed as directed by the departmental officer at site. | BI01010001010000000000000515BI0100001122 | 750 | cum |
| 11 | 4.02 | 2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared as directed by the departmental officer at site. | BI01010001010000000000000515BI0100001123 | 60 | sqm |
| 12 | 5 | Scheme 5 350 M to 450 M | BI01010001010000000000000515BI0100001124 | ||
| 13 | 5.01 | 2.6.1 : Earth work in all kinds of soil excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed as directed by the departmental officer at site. | BI01010001010000000000000515BI0100001125 | 750 | cum |
| 14 | 5.02 | 2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared as directed by the departmental officer at site. | BI01010001010000000000000515BI0100001126 | 60 | sqm |
| 15 | 6 | scheme 6 450 M to 550 M | BI01010001010000000000000515BI0100001127 | ||
| 16 | 6.01 | 2.6.1 : Earth work in all kinds of soil excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed as directed by the departmental officer at site. | BI01010001010000000000000515BI0100001128 | 750 | cum |
| 17 | 6.02 | 2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared as directed by the departmental officer at site. | BI01010001010000000000000515BI0100001129 | 60 | sqm |
| 18 | 7 | Scheme 7 (Thoomp) 550m to 650m | BI01010001010000000000000515BI0100001130 | ||
| 19 | 7.01 | 2.6.1 : Earth work in all kinds of soil excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed as directed by the departmental officer at site. | BI01010001010000000000000515BI0100001131 | 750 | cum |
| 20 | 8 | Scheme 8 from 650 M to 690 Mriverside (Left side of thoomp) | BI01010001010000000000000515BI0100001132 | ||
| 21 | 8.01 | 2.6.1 : Earth work in all kinds of soil excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed as directed by the departmental officer at site. | BI01010001010000000000000515BI0100001133 | 650 | cum |
| 22 | 9 | Scheme 9 from 690 M to 730 M | BI01010001010000000000000515BI0100001134 | ||
| 23 | 9.01 | 2.6.1 : Earth work in all kinds of soil excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed as directed by the departmental officer at site. | BI01010001010000000000000515BI0100001135 | 624 | cum |
| 24 | 10 | Scheme 10 730M to 770M | BI01010001010000000000000515BI0100001136 | ||
| 25 | 10.01 | 2.6.1 : Earth work in all kinds of soil excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed as directed by the departmental officer at site. | BI01010001010000000000000515BI0100001137 | 624 | cum |
| 26 | 11 | Scheme 11 770 m- 810M | BI01010001010000000000000515BI0100001138 | ||
| 27 | 11.01 | 2.6.1 : Earth work in all kinds of soil excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed as directed by the departmental officer at site. | BI01010001010000000000000515BI0100001139 | 624 | cum |
| 28 | 12 | Scheme 12 850M to 875M | BI01010001010000000000000515BI0100001140 | ||
| 29 | 12.01 | 2.6.1 : Earth work in all kinds of soil excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed as directed by the departmental officer at site. | BI01010001010000000000000515BI0100001141 | 405 | cum |
AI Tender Summary
Tender Timeline
Feb 08, 2021
11:30 IST
Tender Published
Tender notice published.
CompletedFeb 15, 2021
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedFeb 18, 2021
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender