Installation Of Jci 03 Ac Compressors- In Ship
Tender Overview
Project Description
Installation Of Jci 03 Ac Compressors- In Ship , Installation And Commissioning Of Jci Make Ac Compressorsjoint Inspection Of Plant Supplied By Mo ( V ) , Installation And Commissioning Of Jci Make Ac Compressorssupply Of New Foundation Drawing For Manufacturing , Installation And Commissioning Of Jci Make Ac Compressorsshifting And Installation Of New Foundation Onboard Ship , Installation And Commissioning Of Jci Make Ac Compressorsfitment Of Shock Mounts , Installation And Commissioning Of Jci Make Ac Compressorsshifting Of Ac Plants To Foundation , Installation And Commissioning Of Jci Make Ac Compressorsconnecterisation Of Plants To Electrical Supply , Installation And Commissioning Of Jci Make Ac Compressorsprovisioning Of Necessary Sockets On Sea Water And Chilled Water Pipe Lines , Installation And Commissioning Of Jci Make Ac Compressorspt , Vt , Oil Charging And Gas Charging , Installation And Commissioning Of Jci Make Ac Compressorsstw & Mtu Trials , Installation And Commissioning Of Jci Make Ac Compressorssubmit Operating And Manufacturing Manual For Reference , Installation And Commissioning Of Jci Make Ac Compressorstraining For Operations , Mandatory Spare:- . Suction Line Piping With Necessary Valves And Fittings . , Mandatory Spare:- . Discharge Line Piping With Necessary Valves And Fittings . , Mandatory Spare:- . Liquid Injection Line With Necessary Valves And Fittings . , Mandatory Spare:- . Vibration Eliminator For Suction Line . , Mandatory Spare:- . Vibration Eliminator For Discharge Line . , Mandatory Spare:- . Base Frame . , Mandatory Spare:- . Refrigerant R134a . , Mandatory Spare:- . Poe Oil . , Mandatory Spare:- . Press Switch , 1/4 Npt ( M ) , Suction Pressure . , Mandatory Spare:- . Press Switch , 1/4 Npt ( M ) , Discharge Pressure . , Mandatory Spare:- . Oil Pressure Switch , 1/4 Npt ( M ) . , Mandatory Spare:- . Temperature Switch , Suction Temperature . , Mandatory Spare:- . Temperature Switch , Discharge Temperature . , Mandatory Spare:- . Press Trans 1/4 Npt ( M ) , Suction Pressure . , Mandatory Spare:- . Press Trans 1/4 Npt ( M ) , Discharge Pressure . , Mandatory Spare:- . Temperature Probe , ( -50 ) To 100 Degc , Suction , Dicharge , Chilled Water . , Mandatory Spare:- . Pg Bourden Type 0 To 25 Kg/Cm2 ( G ) , 1/4 Npt ( M ) . , Mandatory Spare:- . Dpg For Oil 0 To 10 Kg/Cm2 ( G ) , 1/4Npt ( M ) . , Mandatory Spare:- . Pg Bourden Type 0 To 10 Kg/Cm2 ( G ) , 1/4 Npt ( M ) . , Mandatory Spare:- . Pg Glycerine ( - ) 1 To 9 Kg/Cm2 ( G ) , 1/4 Npt ( M ) . , Mandatory Spare:- . Temperature Guage ( Machine Glass ) ( - ) 30 To 50 Degc . , Mandatory Spare:- . Temperature Guage ( Machine Glass ) 0 To 100 Degc . , Mandatory Spare:- . Liquid Injection Solenoid Valve . , Mandatory Spare:- . Liquid Injection Tcv . , Mandatory Spare:- . Flow Switch - Chilled Water And Sea Water . , Mandatory Spare:- . Thermostatic Expansion Valve . , Mandatory Spare:- . Solenoid Valve With Strainer . , Mandatory Spare:- . Filter Drier Core . , Mandatory Spare:- . Filter Drier Housing .
BOQ
| Name of Work: <Installation of JCI 03 AC compressors IN SHIP > | |||||
|---|---|---|---|---|---|
| Sl.No (A) | Item Description (B) | Item Code / Make | Quantity (C) | Units (D) | |
| 1 | 1.01 | Installation and commissioning of JCI make AC compressorsJoint inspection of plant supplied by MO(V) | Item no 1 | 3 | Nos |
| 2 | 1.02 | Installation and commissioning of JCI make AC compressorsSupply of new foundation drawing for manufacturing | Item no 2 | 3 | Nos |
| 3 | 1.03 | Installation and commissioning of JCI make AC compressorsShifting and installation of new foundation onboard ship | Item no 3 | 3 | Nos |
| 4 | 1.04 | Installation and commissioning of JCI make AC compressorsFitment of shock mounts | Item no 4 | 3 | Nos |
| 5 | 1.05 | Installation and commissioning of JCI make AC compressorsShifting of AC plants to foundation | Item no 5 | 3 | Nos |
| 6 | 1.06 | Installation and commissioning of JCI make AC compressorsConnecterisation of plants to electrical supply | Item no 6 | 3 | Nos |
| 7 | 1.07 | Installation and commissioning of JCI make AC compressorsProvisioning of necessary sockets on sea water and chilled water pipe lines | Item no 7 | 3 | Nos |
| 8 | 1.08 | Installation and commissioning of JCI make AC compressorsPT, VT, oil charging and gas charging | Item no 8 | 3 | Nos |
| 9 | 1.09 | Installation and commissioning of JCI make AC compressorsSTW & MTU trials | Item no 9 | 3 | Nos |
| 10 | 1.1 | Installation and commissioning of JCI make AC compressorsSubmit operating and manufacturing manual for reference | Item no 10 | 3 | Nos |
| 11 | 1.11 | Installation and commissioning of JCI make AC compressorsTraining for operations | Item no 11 | 3 | Nos |
| 12 | 2.01 | Mandatory spare:-.Suction line piping with necessary valves and fittings. | Item no 12 | 3 | Nos |
| 13 | 2.02 | Mandatory spare:-.Discharge line piping with necessary valves and fittings. | Item no 13 | 3 | Nos |
| 14 | 2.03 | Mandatory spare:-.Liquid injection line with necessary valves and fittings. | Item no 14 | 3 | Nos |
| 15 | 2.04 | Mandatory spare:-.Vibration eliminator for suction line. | Item no 15 | 3 | Nos |
| 16 | 2.05 | Mandatory spare:-.Vibration eliminator for discharge line. | Item no 16 | 3 | Nos |
| 17 | 2.06 | Mandatory spare:-.Base frame. | Item no 17 | 3 | Nos |
| 18 | 2.07 | Mandatory spare:-.Refrigerant R134A. | Item no 18 | 540 | kg |
| 19 | 2.08 | Mandatory spare:-.POE oil. | Item no 19 | 60 | Litres |
| 20 | 2.09 | Mandatory spare:-.Press switch, 1/4\" NPT(M), Suction pressure. | Item no 20 | 3 | Pcs |
| 21 | 2.1 | Mandatory spare:-.Press switch, 1/4\" NPT(M), Discharge pressure. | Item no 21 | 3 | Pcs |
| 22 | 2.11 | Mandatory spare:-.Oil pressure switch, 1/4\" NPT(M). | Item no 22 | 3 | Pcs |
| 23 | 2.12 | Mandatory spare:-.Temperature switch, Suction temperature. | Item no 23 | 6 | Pcs |
| 24 | 2.13 | Mandatory spare:-.Temperature switch, Discharge temperature. | Item no 24 | 6 | Pcs |
| 25 | 2.14 | Mandatory spare:-.Press trans 1/4\" NPT(M), Suction pressure. | Item no 25 | 3 | Pcs |
| 26 | 2.15 | Mandatory spare:-.Press trans 1/4\" NPT(M), Discharge pressure. | Item no 26 | 12 | Pcs |
| 27 | 2.16 | Mandatory spare:-.Temperature probe, (-50) to 100 Degc, suction, dicharge, chilled water. | Item no 27 | 12 | Pcs |
| 28 | 2.17 | Mandatory spare:-.PG bourden type 0 to 25 kg/cm2 (G), 1/4\" NPT (M). | Item no 28 | 6 | pcs |
| 29 | 2.18 | Mandatory spare:-.DPG for oil 0 to 10 kg/cm2 (G), 1/4\"NPT(M). | Item no 29 | 3 | pcs |
| 30 | 2.19 | Mandatory spare:-.PG bourden type 0 to 10 kg/cm2 (G), 1/4\" NPT (M). | Item no 30 | 12 | Pcs |
| 31 | 2.2 | Mandatory spare:-.PG Glycerine(-) 1 to 9 kg/cm2 (G), 1/4\" NPT (M). | Item no 31 | 3 | pcs |
| 32 | 2.21 | Mandatory spare:-.Temperature guage (machine glass) (-) 30 to 50 degc. | Item no 32 | 9 | Pcs |
| 33 | 2.22 | Mandatory spare:-.Temperature guage (machine glass) 0 to 100 degc. | Item no 33 | 6 | Pcs |
| 34 | 2.23 | Mandatory spare:-.Liquid injection solenoid valve. | Item no 34 | 6 | Pcs |
| 35 | 2.24 | Mandatory spare:-.Liquid injection TCV. | Item no 35 | 3 | Pcs |
| 36 | 2.25 | Mandatory spare:-.Flow switch - chilled water and sea water. | Item no 36 | 6 | Pcs |
| 37 | 2.26 | Mandatory spare:-.Thermostatic Expansion Valve. | Item no 37 | 6 | Pcs |
| 38 | 2.27 | Mandatory spare:-.Solenoid valve with strainer. | Item no 38 | 6 | Pcs |
| 39 | 2.28 | Mandatory spare:-.Filter drier core. | Item no 39 | 12 | Pcs |
| 40 | 2.29 | Mandatory spare:-.Filter drier housing. | Item no 40 | 3 | Pcs |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
Completed