Installation Of Jci 03 Ac Compressors- In Ship
Tender Overview
Project Description
Installation Of Jci 03 Ac Compressors- In Ship , Installation And Commissioning Of Jci Make Ac Compressorsjoint Inspection Of Plant Supplied By Mo ( V ) , Installation And Commissioning Of Jci Make Ac Compressorssupply Of New Foundation Drawing For Manufacturing , Installation And Commissioning Of Jci Make Ac Compressorsshifting And Installation Of New Foundation Onboard Ship , Installation And Commissioning Of Jci Make Ac Compressorsfitment Of Shock Mounts , Installation And Commissioning Of Jci Make Ac Compressorsshifting Of Ac Plants To Foundation , Installation And Commissioning Of Jci Make Ac Compressorsconnecterisation Of Plants To Electrical Supply , Installation And Commissioning Of Jci Make Ac Compressorsprovisioning Of Necessary Sockets On Sea Water And Chilled Water Pipe Lines , Installation And Commissioning Of Jci Make Ac Compressorspt , Vt , Oil Charging And Gas Charging , Installation And Commissioning Of Jci Make Ac Compressorsstw & Mtu Trials , Installation And Commissioning Of Jci Make Ac Compressorssubmit Operating And Manufacturing Manual For Reference , Installation And Commissioning Of Jci Make Ac Compressorstraining For Operations , Mandatory Spare:- . Suction Line Piping With Necessary Valves And Fittings . , Mandatory Spare:- . Discharge Line Piping With Necessary Valves And Fittings . , Mandatory Spare:- . Liquid Injection Line With Necessary Valves And Fittings . , Mandatory Spare:- . Vibration Eliminator For Suction Line . , Mandatory Spare:- . Vibration Eliminator For Discharge Line . , Mandatory Spare:- . Base Frame . , Mandatory Spare:- . Refrigerant R134a . , Mandatory Spare:- . Poe Oil . , Mandatory Spare:- . Press Switch , 1/4 Npt ( M ) , Suction Pressure . , Mandatory Spare:- . Press Switch , 1/4 Npt ( M ) , Discharge Pressure . , Mandatory Spare:- . Oil Pressure Switch , 1/4 Npt ( M ) . , Mandatory Spare:- . Temperature Switch , Suction Temperature . , Mandatory Spare:- . Temperature Switch , Discharge Temperature . , Mandatory Spare:- . Press Trans 1/4 Npt ( M ) , Suction Pressure . , Mandatory Spare:- . Press Trans 1/4 Npt ( M ) , Discharge Pressure . , Mandatory Spare:- . Temperature Probe , ( -50 ) To 100 Degc , Suction , Dicharge , Chilled Water . , Mandatory Spare:- . Pg Bourden Type 0 To 25 Kg/Cm2 ( G ) , 1/4 Npt ( M ) . , Mandatory Spare:- . Dpg For Oil 0 To 10 Kg/Cm2 ( G ) , 1/4Npt ( M ) . , Mandatory Spare:- . Pg Bourden Type 0 To 10 Kg/Cm2 ( G ) , 1/4 Npt ( M ) . , Mandatory Spare:- . Pg Glycerine ( - ) 1 To 9 Kg/Cm2 ( G ) , 1/4 Npt ( M ) . , Mandatory Spare:- . Temperature Guage ( Machine Glass ) ( - ) 30 To 50 Degc . , Mandatory Spare:- . Temperature Guage ( Machine Glass ) 0 To 100 Degc . , Mandatory Spare:- . Liquid Injection Solenoid Valve . , Mandatory Spare:- . Liquid Injection Tcv . , Mandatory Spare:- . Flow Switch - Chilled Water And Sea Water . , Mandatory Spare:- . Thermostatic Expansion Valve . , Mandatory Spare:- . Solenoid Valve With Strainer . , Mandatory Spare:- . Filter Drier Core . , Mandatory Spare:- . Filter Drier Housing .
BOQ
| Name of Work: <Installation of JCI 03 AC compressors IN SHIP > | |||||
|---|---|---|---|---|---|
| Sl.No (A) | Item Description (B) | Item Code / Make | Quantity (C) | Units (D) | |
| 1 | 1.01 | Installation and commissioning of JCI make AC compressorsJoint inspection of plant supplied by MO(V) | Item no 1 | 3 | Nos |
| 2 | 1.02 | Installation and commissioning of JCI make AC compressorsSupply of new foundation drawing for manufacturing | Item no 2 | 3 | Nos |
| 3 | 1.03 | Installation and commissioning of JCI make AC compressorsShifting and installation of new foundation onboard ship | Item no 3 | 3 | Nos |
| 4 | 1.04 | Installation and commissioning of JCI make AC compressorsFitment of shock mounts | Item no 4 | 3 | Nos |
| 5 | 1.05 | Installation and commissioning of JCI make AC compressorsShifting of AC plants to foundation | Item no 5 | 3 | Nos |
| 6 | 1.06 | Installation and commissioning of JCI make AC compressorsConnecterisation of plants to electrical supply | Item no 6 | 3 | Nos |
| 7 | 1.07 | Installation and commissioning of JCI make AC compressorsProvisioning of necessary sockets on sea water and chilled water pipe lines | Item no 7 | 3 | Nos |
| 8 | 1.08 | Installation and commissioning of JCI make AC compressorsPT, VT, oil charging and gas charging | Item no 8 | 3 | Nos |
| 9 | 1.09 | Installation and commissioning of JCI make AC compressorsSTW & MTU trials | Item no 9 | 3 | Nos |
| 10 | 1.1 | Installation and commissioning of JCI make AC compressorsSubmit operating and manufacturing manual for reference | Item no 10 | 3 | Nos |
| 11 | 1.11 | Installation and commissioning of JCI make AC compressorsTraining for operations | Item no 11 | 3 | Nos |
| 12 | 2.01 | Mandatory spare:-.Suction line piping with necessary valves and fittings. | Item no 12 | 3 | Nos |
| 13 | 2.02 | Mandatory spare:-.Discharge line piping with necessary valves and fittings. | Item no 13 | 3 | Nos |
| 14 | 2.03 | Mandatory spare:-.Liquid injection line with necessary valves and fittings. | Item no 14 | 3 | Nos |
| 15 | 2.04 | Mandatory spare:-.Vibration eliminator for suction line. | Item no 15 | 3 | Nos |
| 16 | 2.05 | Mandatory spare:-.Vibration eliminator for discharge line. | Item no 16 | 3 | Nos |
| 17 | 2.06 | Mandatory spare:-.Base frame. | Item no 17 | 3 | Nos |
| 18 | 2.07 | Mandatory spare:-.Refrigerant R134A. | Item no 18 | 540 | kg |
| 19 | 2.08 | Mandatory spare:-.POE oil. | Item no 19 | 60 | Litres |
| 20 | 2.09 | Mandatory spare:-.Press switch, 1/4\" NPT(M), Suction pressure. | Item no 20 | 3 | Pcs |
| 21 | 2.1 | Mandatory spare:-.Press switch, 1/4\" NPT(M), Discharge pressure. | Item no 21 | 3 | Pcs |
| 22 | 2.11 | Mandatory spare:-.Oil pressure switch, 1/4\" NPT(M). | Item no 22 | 3 | Pcs |
| 23 | 2.12 | Mandatory spare:-.Temperature switch, Suction temperature. | Item no 23 | 6 | Pcs |
| 24 | 2.13 | Mandatory spare:-.Temperature switch, Discharge temperature. | Item no 24 | 6 | Pcs |
| 25 | 2.14 | Mandatory spare:-.Press trans 1/4\" NPT(M), Suction pressure. | Item no 25 | 3 | Pcs |
| 26 | 2.15 | Mandatory spare:-.Press trans 1/4\" NPT(M), Discharge pressure. | Item no 26 | 12 | Pcs |
| 27 | 2.16 | Mandatory spare:-.Temperature probe, (-50) to 100 Degc, suction, dicharge, chilled water. | Item no 27 | 12 | Pcs |
| 28 | 2.17 | Mandatory spare:-.PG bourden type 0 to 25 kg/cm2 (G), 1/4\" NPT (M). | Item no 28 | 6 | pcs |
| 29 | 2.18 | Mandatory spare:-.DPG for oil 0 to 10 kg/cm2 (G), 1/4\"NPT(M). | Item no 29 | 3 | pcs |
| 30 | 2.19 | Mandatory spare:-.PG bourden type 0 to 10 kg/cm2 (G), 1/4\" NPT (M). | Item no 30 | 12 | Pcs |
| 31 | 2.2 | Mandatory spare:-.PG Glycerine(-) 1 to 9 kg/cm2 (G), 1/4\" NPT (M). | Item no 31 | 3 | pcs |
| 32 | 2.21 | Mandatory spare:-.Temperature guage (machine glass) (-) 30 to 50 degc. | Item no 32 | 9 | Pcs |
| 33 | 2.22 | Mandatory spare:-.Temperature guage (machine glass) 0 to 100 degc. | Item no 33 | 6 | Pcs |
| 34 | 2.23 | Mandatory spare:-.Liquid injection solenoid valve. | Item no 34 | 6 | Pcs |
| 35 | 2.24 | Mandatory spare:-.Liquid injection TCV. | Item no 35 | 3 | Pcs |
| 36 | 2.25 | Mandatory spare:-.Flow switch - chilled water and sea water. | Item no 36 | 6 | Pcs |
| 37 | 2.26 | Mandatory spare:-.Thermostatic Expansion Valve. | Item no 37 | 6 | Pcs |
| 38 | 2.27 | Mandatory spare:-.Solenoid valve with strainer. | Item no 38 | 6 | Pcs |
| 39 | 2.28 | Mandatory spare:-.Filter drier core. | Item no 39 | 12 | Pcs |
| 40 | 2.29 | Mandatory spare:-.Filter drier housing. | Item no 40 | 3 | Pcs |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender