| 1 | 1 | Cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge. | BI01010001010000000000000515BI0100001112 | 2220 | Sqm |
|---|
| 2 | 2 | Cutting,uprootingofroots&stumpsoftreesofdifferentgirthupto1meterdepthbelowgroundlevelorbedlevel&fillingtherootholesbysoilandremovalofbranches,roots&stumpsetc.includingcarriageandstackingasperinstructionoftheEngineer-in-charge(Measurementofgirth at breast height of 90 cm) | BI01010001010000000000000515BI0100001113 | | |
|---|
| 3 | 2.01 | Bamboocluster(eachclustertobemeasuredseperately)/Teabushes | BI01010001010000000000000515BI0100001114 | 240 | Sqm |
|---|
| 4 | 3 | Earthwork in excavation in the canals / drainage channels / borrow pits / River bed / slope of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. for making banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods, rough dressing etc. complete as per direction of the Engineer-in-charge. | BI01010001010000000000000515BI0100001115 | | |
|---|
| 5 | 3.01 | Ordinary soil / local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil. | BI01010001010000000000000515BI0100001116 | 1039 | Cum |
|---|
| 6 | 4 | Earthwork in excavation in all kinds of soil for making embankment repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge withina lead of, NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking. C) Beyond 2.00 km and upto 3.00 km Note :Add extra rate towards compensation for earth for land owned / arranged by the contractor over rate of earthwork for land owned / arranged by the Department and for royalty charges on earth as per latest rate as mentioned in PWD Schedule. The royalty will be paid to the agency on production of necessary documents in support of payment made toward the royalty. During initial payment of bill a deduction as per considered rate may be made. | BI01010001010000000000000515BI0100001117 | 3439 | Cum |
|---|
| 7 | 5 | Quarrying, Carrying, Supplying stone boulders/shingles from the Engineer-in-charge selected quarrying site to the site of work including cost of material, loading, unloading and carriage including all incidental charges like Royalty and labour charges for laying boulder in apron or within wire netting of sausage for slope pitching and all lifts & dressing the exposed faces etc. complete as per direction of the Engineer-in-charge. | BI01010001010000000000000515BI0100001118 | | |
|---|
| 8 | 5.01 | Boulder above 30 kg each 70 %, c) Boulder above 20 kg each 20 % & d) Boulder above 10 kg each 10 % .(Quarry bed belongs to Forest Deptt. Govt of W.B). N.B.-The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arrive at the total rate at quarry side till such rates are modified by the forest department and department of industry, commerce and enterprises, Government of West Bengal.(a) for forest area royalty including entry fee and TP fee: Rs. 91.25 per cum .Royalty (including other charges where ever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty (including othere charges where ever applicable, but excluding GST) will be deducted from the bills of works. | BI01010001010000000000000515BI0100001119 | 521 | Cum |
|---|
| 9 | 6 | Quarrying, Carrying, Supplying stone boulders/shingles from the Engineer-in-charge selected quarrying site to the site of work including cost of material, loading, unloading and carriage including all incidental charges like Royalty and labour charges for laying boulder in apron or within wire netting of sausage for slope pitching and all lifts & dressing the exposed faces etc. complete as per direction of the Engineer-in-charge. | BI01010001010000000000000515BI0100001120 | | |
|---|
| 10 | 6.01 | Boulder above 20 kg each .(Quarry bed belongs to Forest Deptt. Govt of W.B). N.B.-The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arrive at the total rate at quarry side till such rates are modified by the forest department and department of industry, commerce and enterprises, Government of West Bengal.(a) for forest area royalty including entry fee and TP fee: Rs. 91.25 per cum .Royalty (including other charges where ever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty (including othere charges where ever applicable, but excluding GST) will be deducted from the bills of works. | BI01010001010000000000000515BI0100001121 | 439 | Cum |
|---|
| 11 | 7 | Labour charges for grouting the slope pitching by bitumen including carriage of bitumen & supply of sand shingles & Bazri for filling voids but excluding cost of bitumen.\n Within boulder or shingles or Bazri region 9”/0.23 m thick boulder pitching. | BI01010001010000000000000515BI0100001122 | 2225 | Sqm |
|---|
| 12 | 8 | Supplying Packed Bitumen VG-10 ( 80/100 ) including loading, unloading & carriage upto the work site excluding the cost of bitumen drum and labour charge for laying at site for grouting the slope pitching etc. all complete as per instruction of Engineer in Charge. | BI01010001010000000000000515BI0100001123 | 17.8 | MT |
|---|
| 13 | 9 | Making rectangular / circular sausage cage with 10 SWG galvanized iron wire of 150 mm. x 150 mm. mesh wire netting with proper lapping of minimum 150 mm including sewing the joints with 12 SWG G I wire and supply of all materials and equipments including placing the sausage cage in position, filling the same with boulder or lump aggregates complete as per direction of the Engineer-in-charge but excluding the cost of boulder / lump aggregates and its carriage upto site.(Cost is excluding the cost of end pieces) 1.50 metre diameter.- | BI01010001010000000000000515BI0100001124 | 80 | Metre |
|---|
| 14 | 10 | Supplying, fitting, fixing end pieces for rectangular/square/circular sausages at the ends,with10SWG/8SWG GI wire net of different mesh size stying & sewing the same maintaningalap langth of150mm all around with 12SWGGI wire complete,including the cost of supply of wire netting,fitting etc,complete as per direction of the Engineer-in-charge. Mesh size 150 mm x 150 mm with 10 SWG wire | BI01010001010000000000000515BI0100001125 | 61 | Sqm |
|---|
| 15 | 11 | Quarrying ,Carrying ,Supplying stone boulders/shingles from the Engineer in Charge selected quarrying site to the site of work including cost of materials,loading,unloading and carriage including all incidental charges like Royalty.(Quarry bed belongs to Forest Dept. Govt. Of WB) | BI01010001010000000000000515BI0100001126 | | |
|---|
| 16 | 11.01 | Boulder above 30 kg each 70 %, c) Boulder above 20 kg each 20 % & d) Boulder above 10 kg each 10 % .(Quarry bed belongs to Forest Deptt. Govt of W.B). N.B.-The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arrive at the total rate at quarry side till such rates are modified by the forest department and department of industry, commerce and enterprises, Government of West Bengal.(a) for forest area royalty including entry fee and TP fee: Rs. 91.25 per cum .Royalty (including other charges where ever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty (including othere charges where ever applicable, but excluding GST) will be deducted from the bills of works. | BI01010001010000000000000515BI0100001127 | 121 | Cum |
|---|
| 17 | 12 | Extra rate for carrying boulder by head load for each additional lead of 50 meter or part there of beyond initial distance of 50 meter, upto a distance of 200 metre. | BI01010001010000000000000515BI0100001129 | 649 | Cum |
|---|