Construction Of Dining Hall Pantry To Existing Vip Guest House/Meeting Hall At Chatroo Plz Refer Boq
Tender Value
4.52 Lakhs
Estimated cost
Bid Submission
12 Feb 2021
0 days left
EMD
9040
Bank guarantee accepted
Document Fee
600
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Chatroo → Jammu And Kashmir
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction Of Dining Hall Pantry To Existing Vip Guest House/Meeting Hall At Chatroo Plz Refer Boq
BOQ
| Name of Work: Construction of Dining Hall pantary to existing VIP Guest House/meeting Hall at Chatroo | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth,\nleadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge.\nAll kinds of soil | 118.75 | cum | |
| 2 | 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and\nramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil \n | 5.89 | cum | |
| 3 | 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)\n | 0.45 | cum | |
| 4 | 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 8.87 | cum | |
| 5 | 5 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)\n | 4.78 | cum | |
| 6 | 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2.25 | cum | |
| 7 | 7 | Centering and shuttering including strutting, propping etc. and removal of form for: \n | |||
| 8 | 7.1 | Columns, pillars, piers, abutments, posts and struts. | 29.08 | Sqm | |
| 9 | 7.2 | Suspended floors, roofs, landings, balconies and access platforms | 10.31 | Sqm | |
| 10 | 7.3 | Edges of slabs and breaks in floors and walls Under 20 cm wide | 12.5 | Sqm | |
| 11 | 7.4 | Foundations, footings, bases of columns etc. for mass concrete. | 6.97 | Sqm | |
| 12 | 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelCold twisted bars\n | 843.6 | Kg | |
| 13 | 9 | Steel work welded in built up sections/framed work, including cutting,\nhoisting, fixing in position and applying a priming coat of approved steel\nprimer using structural steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | 418.75 | Kg | |
| 14 | 10 | Random Rubble masonry with hard stone in foundation and plinth\nincluding leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse\nsand : 12 graded stone aggregate 20mm nominal size) upto plinth level and \ncuring complete with:Cement mortar 1:6 (1 Cement : 6 coarse sand) Nallah | 7.36 | cum | |
| 15 | 11 | 15mm Cement plaster on the rough side of single or half brick wall of\nmix:1 : 6 ( 1 cement : 6 fine sand) | 55.59 | Sqm | |
| 16 | 12 | Chequerred precast cement concrete tiles 22mm thick in footpath and \ncourtyard, jointed with neat cement slurry mixed with pigment to match\nthe shade of the tiles, including rubbing, cleaning and curing complete,\non 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand) Medium shade using 50% white cement and 50% ordinary cement.\n | 80.2 | Sqm | |
| 17 | 13 | Providing and laying vitrified floor tiles in different sizes (thickness to\nbe specified by the manufacturer) with water absorption less than 0.08%\nand conforming to IS:15622 of approved make, in all colours and shades, \nlaid on 20mm thick cement mortar 1:4 (1cement :4 coarse sand)\nincluding grouting the joints with white cement and matching pigments\netc. complete Size of tile 500x500 mm\n | 11.43 | Sqm | |
| 18 | 14 | Supplying and stacking at site good Earth | 31.66 | cum | |
| 19 | 15 | Spreading of sludge, dump manure or/and good earth in required\nthickness as per directions of officer in-charge (cost of sludge, dump\nmanure or/and good earth to be paid separately) | 31.66 | cum | |
| 20 | 16 | Providing and fixing aluminum tee channels (heavy duty) with rollers, stop end\nin pelmets as curtain rods. | 18.29 | cum | |
| 21 | 17 | Painting with synthetic enamel paint of approved brand and manufacture \nto give an even shade.Two or more coats on new work over an under coat of\nsuitable shade with ordinary paint of approved brand and manufacture. | 15.56 | Sqm | |
| 22 | 18 | Carriage of key construction material from source to site of work by MT | |||
| 23 | 18.1 | Execavation earth/mulba by MT av. Lead upto 1 km | 16.58 | cum | |
| 24 | 18.2 | Carriage of stone av lead 10 km by M.T | 7.36 | cum | |
| 25 | 18.3 | Carriage of Bajri av lead of 19 km by M.T | 14.71 | cum | |
| 26 | 18.4 | Carriage of sand av lead of 19 km by M.T | 10.77 | cum |
AI Tender Summary
Tender Timeline
Feb 06, 2021
11:30 IST
Tender Published
Tender notice published.
CompletedFeb 12, 2021
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedFeb 13, 2021
Bid Opening Date
Technical bids will be opened and evaluated.