| 1 | 1 | Supply and Fabrication of 1 No sluice gate of size 3.2m(W)x 3m (H) | BI01010001010000000000000515BI0100001113 | | |
|---|
| 2 | 1.01 | 85.101 : Supply of MS plates confirming to IS 2062GrB including cost of conveyance charges | BI01010001010000000000000515BI0100001114 | 2407.6 | kg |
|---|
| 3 | 1.02 | 85.102 : Supply of MS Tees, Angles, Joists, ISMB, ISMC confirming to IS2062GrA/B including cost of conveyance charges | BI01010001010000000000000515BI0100001115 | 53.4 | kg |
|---|
| 4 | 1.03 | 85.110 : Fabrication and supply of Structural steel wheel gate and accessories as per approved specifications, drawings and directions of deptl officer at site including cost of labour, machinery, all leads and lifts, incidental and handling charges etc complete but excluding cost of material already supplied | BI01010001010000000000000515BI0100001116 | 2461 | kg |
|---|
| 5 | 1.04 | od15633/2020_2021/MH : Supply of SS bolt and nut for assembling hoist units including cost of all material, labour, conveyance,incidental charges etc complete | BI01010001010000000000000515BI0100001117 | 5 | kg |
|---|
| 6 | 2 | Supply, fabrication and erection of Structural steel Embedded parts in IS 2062 grade and accessaries as per approved specifications | BI01010001010000000000000515BI0100001118 | | |
|---|
| 7 | 2.01 | 85.101 : Supply of MS plates confirming to IS 2062GrB including cost of conveyance charges | BI01010001010000000000000515BI0100001119 | 98.125 | kg |
|---|
| 8 | 2.02 | 85.107 : Supply of MS round bar including cost of conveyance charges | BI01010001010000000000000515BI0100001120 | 39.5 | kg |
|---|
| 9 | 2.03 | 85.108 : Fabrication, erection and commissioning of Structural steel Embedded parts in IS2062 Grade and accessories as per approved specifications, drawings and directions of deptl officer at site including cost of labour, machinery , incidental and handling charges etc complete but excluding cost of material already supplied | BI01010001010000000000000515BI0100001121 | 223.985 | kg |
|---|
| 10 | 2.04 | od15612/2020_2021/MH : Fabrication, supply, erection and assembling in correct position and alignment by welding SS embedded parts in 304L grade like sill beam, seal seat, vertical seal seat etc. as per approved specification and direction of deptl. officer at site including cost of all material labour machinery for welding, shearing, grinding etc. | BI01010001010000000000000515BI0100001122 | 587.808 | kg |
|---|
| 11 | 2.05 | 85.102 : Supply of MS Tees, Angles, Joists, ISMB, ISMC confirming to IS2062GrA/B including cost of conveyance charges | BI01010001010000000000000515BI0100001123 | 86.36 | kg |
|---|
| 12 | 3 | Cost of supply of materials for structural steel (IS 2062) hoist bridge consisting of column /beams, stiffeners, MS chequered plate for platform, covers for the hoisting unit, hand rails, ladders etc as per approved specifications | BI01010001010000000000000515BI0100001124 | | |
|---|
| 13 | 3.01 | 85.102 : Supply of MS Tees, Angles, Joists, ISMB, ISMC confirming to IS2062GrA/B including cost of conveyance charges | BI01010001010000000000000515BI0100001125 | 912.54 | kg |
|---|
| 14 | 3.02 | 85.101 : Supply of MS plates confirming to IS 2062GrB including cost of conveyance charges | BI01010001010000000000000515BI0100001126 | 103.558 | kg |
|---|
| 15 | 3.03 | 85.103 : Supply of MS checquered plates including cost of conveyance charges | BI01010001010000000000000515BI0100001127 | 225.675 | kg |
|---|
| 16 | 3.04 | od15493/2020_2021/MH : Supply 32 mm dia G.I. pipes for handrail | BI01010001010000000000000515BI0100001128 | 15.5 | metre |
|---|
| 17 | 3.05 | 85.107 : Supply of MS round bar including cost of conveyance charges | BI01010001010000000000000515BI0100001129 | 6.32 | kg |
|---|
| 18 | 3.06 | 85.124 : Fabrication and supply of Hoisting bridge unit in structural steel confirming to IS2062Gr including ladder, covers for hoisting unit etc as per approved specifications, drawings and directions of deptl officer at site including cost of labour, machinery, incidental and handling charges for fixing handrails and allied works etc complete but excluding material already supplied and weight of pipes for hand rails etc | BI01010001010000000000000515BI0100001130 | 1248.09 | kg |
|---|
| 19 | 4 | Supplying and fixing cast steel thrust roller with Self aligning spherical roller bearing, S.S. shaft, fasteners and provision for proper greasing including cost of all materials, labour and conveyance | BI01010001010000000000000515BI0100001131 | | |
|---|
| 20 | 4.01 | 85.119 : Supplying and fixing cast steel thrust roller assembly having 250mm Dia, 50mm tread width, SS(304) shaft and 22313E self aligning spherical roller bearing and accessories as per approved specifications and drawings including cost of all materials, machineries, labour , all lift and lead, incidental and conveyance charges etc complete | BI01010001010000000000000515BI0100001132 | 6 | no |
|---|
| 21 | 5 | Supplying and fixing in correct poisition with specified initial interface the rubber seal confirming to IS11855 to the gates | BI01010001010000000000000515BI0100001133 | | |
|---|
| 22 | 5.01 | 85.116 : Supplying and fixing in correct position with specified initial interface the flat type rubber seal confirming to IS 11855 to the gates including cost of SS bolts and nut all labour and machinery and incidental and conveyance charges complete as per approved specification and drawing | BI01010001010000000000000515BI0100001134 | 3.2 | metre |
|---|
| 23 | 5.02 | 85.118 : Supplying and fixing in correct position with specified initial interface L-type / bulb nose rubber seal confirming to IS11855 to the gates including cost of SS bolts and nuts and all labour and machinery and incidental and conveyance charges complete as per approved specifications and drawings | BI01010001010000000000000515BI0100001135 | 6 | metre |
|---|
| 24 | 5.03 | 85.117 : Supplying and fixing in correct position with specified initial interface the Angular type rubber seal confirming to IS11855 to the gates including cost of SS bolts and nuts and all labour and machinery and incidental and conveyance charges complete as per approved specifications and drawings | BI01010001010000000000000515BI0100001136 | 6 | metre |
|---|
| 25 | 6 | Providing 7.5tonne capacity 4.5m lift screw hoist having 2Nos of forged steel/EN-8 | BI01010001010000000000000515BI0100001137 | | |
|---|
| 26 | 6.01 | od15492/2020_2021/MH : Supply of screw shaft 75mm outer dia,head pitch 12.7mm root dia 62.3mm using EN 8 shaft including cost of all material,labour,tools etc.complete. | BI01010001010000000000000515BI0100001138 | 9 | metre |
|---|
| 27 | 6.02 | od15651/2020_2021/MH : Providing of Double worm and pinion having a lifiing speed of around 5.00 cm/min for hand operation /manual operation including cost of all materials, labour, hire charges and conveyance. | BI01010001010000000000000515BI0100001139 | 1 | set |
|---|
| 28 | 6.03 | od32588/2020_2021/MH : Supply of sprocket & chain ( 1: 5 ratio ), Plummer blocks & bearings for both driving and driven shaft and mounting along with the hoisting unit in alignment with shutter including the cost of all materials, labor, etc. complete. | BI01010001010000000000000515BI0100001140 | 1 | set |
|---|
| 29 | 7 | Erection of the gates safely in the grooves ,assembling and alignining | BI01010001010000000000000515BI0100001141 | | |
|---|
| 30 | 7.01 | 85.111 : Erection of the gates safely in the grooves , assembling and aligning including cost of all machinery, labour all incidental and conveyance charges etc complete as per direction of departmental officer at site | BI01010001010000000000000515BI0100001142 | 2461 | kg |
|---|
| 31 | 8 | Erection of the hoisting bridge unit | BI01010001010000000000000515BI0100001143 | | |
|---|
| 32 | 8.01 | 85.136 : Erection of the hoisting bridge unit including handrails , ladder and platform etc. in correct alignment and anchoring it ; setting and aligning the covers of the hoisting unit etc complete including cost of all labour, machinery, incidental and conveyance , lead and lift charges etc complete but excluding cost of materials already supplied | BI01010001010000000000000515BI0100001144 | 1248.09 | kg |
|---|
| 33 | 9 | Centering and shuttering | BI01010001010000000000000515BI0100001145 | | |
|---|
| 34 | 9.01 | 5.9.6 : Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | BI01010001010000000000000515BI0100001146 | 16.96 | sqm |
|---|
| 35 | 10 | Concreting | BI01010001010000000000000515BI0100001147 | | |
|---|
| 36 | 10.01 | 4.2.3 : Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | BI01010001010000000000000515BI0100001148 | 1.62 | cum |
|---|
| 37 | 11 | Painting | BI01010001010000000000000515BI0100001149 | | |
|---|
| 38 | 11.01 | 85.114 : Painting all the exposed surfaces of the gate and embedded parts with two coats of epoxy coal tar black paint confirming to IS14948 with a minimum film thickness of 150+/-5 microns per each coat over two coats of priming coat applied with zinc primer containing not less than 85% of zinc on dry film with a film thickness of 70+/-5 microns , so that the total film thickness of all coats including priming coat at any rate is not less than 350 microns after cleaning the surface using hand and power tool cleaning including cost of all materials, labour charges , cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site | BI01010001010000000000000515BI0100001150 | 110.241 | sqm |
|---|
| 39 | 12 | Conveyance allowance through backwater | BI01010001010000000000000515BI0100001151 | | |
|---|
| 40 | 12.01 | od15647/2020_2021/MH : Conveying fabricated shutter, embedded parts, hoisting mechanism, etc to the site (since there is no road access to the site) through backwater including the cost of all labor, machinery, and incidental charges. | BI01010001010000000000000515BI0100001152 | 1 | set |
|---|