}

Annual Maintenance Contract For Fire Fighting Equipments At Wrpl , Sendra And Ramsar, IOCL, Sendra and Ramsar, Rajasthan-Rajasthan

Indian Oil Corporation Limited has published Annual Maintenance Contract For Fire Fighting Equipments At Wrpl , Sendra And Ramsar. Submission Date for this Tender is 19-02-2021. Tanks and Cylinders Tenders in IOCL, Sendra and Ramsar, Rajasthan Rajasthan. Bidders can get complete Tender details and download the document.




Tender Notice

26850638
Annual Maintenance Contract For Fire Fighting Equipments At Wrpl , Sendra And Ramsar
Open Tender
Indian
Rajasthan
Iocl, Sendra And Ramsar, Rajasthan
19-02-2021

Tender Details

Annual Maintenance Contract For Fire Fighting Equipments At Wrpl , Sendra And Ramsar - 3 Monthly Checking, Inspection, Servicing And Maintenance Of Fire Fighting System, Equipments Hydrants, Extinguishers Of All Type, Water Monitor Up To The Mark As Per Oisd / Isi Standards To Provide & Best Functioning Of The Equipments Always In Best Healthy Condition Inclusive Of Periodically Cleaning, Checking / Inspection / Oiling / Greasing Of Assemblies Such As Coupling, Nozzles, Valves, Hydrants, Extinguishers, Hose Pipes, Water Monitor, Compounds Drums, Nozzles Foam Bunch, Hose Boxes, Sand Buckets Etc, Updating The Data & Identification Tags, Recording The Status Of Checking In History Register Etc. As Directed By The Engineer In Charge With All Labors, Carriages, Materials Etc. Complete Inclusive Of All Taxes. ( Inspection And Servicing Of The Equipment / Fire Fighting Facilities Is To Be Done Periodically As Mentioned Against Each ) : 4 Fire Hydrants 5 Fire Extinguishers Of All Types & Capaci 6 Valves Of Fire Line Of Sizes 4-16 Nb 7 Foam / Water Monitors 8 Fire Hose 9 Hose Box 10 Nozzles All Types Including Foam Branch 11 Sand Buckets With Sands For All Bucket 12 Foam Trolley. Foam Tank 200 / 1000 Ltr. Ca 13 Inspection And Hydrotest Of Fire Fighting Delivery Hoses As Per Direction Of Eic And Oisd-142 Inclusive Of All Tools & Tackles , Consumable, Transportation Labour Charges Etc. Reporting To Be Done Inprescibed Format ( Rate Per Hose ) , Half Yearly Schedule 14 Refilling Of Breathing Apparatus Set Compressed Air Upto A Pressure Of 200 / 300 Bar As Per Direction Of Eic, Inclusive Of Transportation, Handling Charges, Hydro Testing From Cce Approved Party , Complete In All Respect. 15 Refilling Of Co2 Gas In Cartridges For Using In Dcp Extinguishers Including All Labour, Transportation Etc.Complete As Per Specification And Direction Of Eic / Site-Engineer. ( Co2 Cartridge Of 120 / 200Gms ) 16 Hydrostatic Testing, Inspection Of Safety Valve, And Refilling Of High Pressure Cylinder Through Cce Approved Party And Charging Upto Required Pressure Including Taking Delivery Of The Cylinder From The Station And Returning The Same Inclusive Of All Labour, Material Transportation And All The Other Incidental Expenses ) The Cylinder Is To Be Returned Back To The Station Within 15 Days From The Date Of Receiving From The Station. ( For 2.0 Kg Co2 Cyl. ) 17 Hydrostatic Testing, Inspection Of Safety Valve, And Refilling Of High Pressure Cylinder Through Cce Approved Party And Charging Upto Required Pressure Including Taking Delivery Of The Cylinder From The Station And Returning The Same Inclusive Of All Labour, Material Transportation And All The Other Incidental Expenses ) The Cylinder Is To Be Returned Back To The Station Within 15 Days From The Date Of Receiving From The Station. ( For 4.5 Kg Co2 Cyl. ) 18 Hydrostatic Testing, Inspection Of Safety Valve, And Refilling Of High Pressure Cylinder Through Cce Approved Party And Charging Upto Required Pressure Including Taking Delivery Of The Cylinder From The Station And Returning The Same Inclusive Of All Labour, Material Transportation And All The Other Incidental Expenses ) The Cylinder Is To Be Returned Back To The Station Within 15 Days From The Date Of Receiving From The Station. ( For 6.5 / 6.8 Kg Co2 Cyl. ) 19 Hydrotesting Of Dcp Type Fire Extinguishers Of Various Capacities At An Internal Pressure Of 30 Kgf / Cm2 As Per Is-2171 And Oisd-Std-142.Painting Of The Cylinders With One Coat Of Red Oxide Primer And Two Coats Of Synthetic Enamel Paint Of Desired Shade 20 25 / 75 Kg Capacity Dcp Extinguisher 21 10 / 9 Kg Capacity Dcp Extinguisher 22 Testing Of Afff As Per Bis: 4989 From Reputed Institute Like Gujarat Industrial Research And Development Agency, Baroda In All Respect By Providing Cans, Transportation, Man Power Etc 23 Maintenance Of Isolation Valves Of All Sizes In Fire Water Line Andfoam Line By Opening And Closing The Same, Greasing, Oiling As Required With Supply Of All Man, Material Greases Required For The Work. 24 Complete Overhauling Of Hand Operated Siren Including Oiling, Greasing , Painting And Testing As Per Direction Of Eic Inclsive Of All Tools &Tackles, Consumable, Transportation Etc 25 Supply And Fitting Of New Wind Sock ( As Per Ioc Specification ) , Removingof Old Wind Sock Made Out Of Synthetic Cloth Over Pump Shed And Controlbuilding As Per Direction Of Site Engineer / Eic.Wind Sock Should Bemade From Strong And Durable Nylonn Or Flat Material With Anticorrosiveantiagening Polyurethane Coating To Increase Tear Resistance. It Shouldnot Tear Easily. Warrenty Of 12Months Should Be Given. 26 Supply & Fitting Of Glass Of Hose Box Inclusive Of Rubber Beedingwherever Required Complete In All Respect Inclusive Of Material, Labour, Consumables Etc. ( Rate For Both Glasses & Rubber Beeding ) 27 Supply & Fitting Of Rubber Beeding Of The Complete One Hose Box ( Bothdoors ) As Per Direction Of Site Engineer / Eic Including Removing Ofworn Out Rubber Beeding, Labour Charges, Tools & Tackles Etc. Completein All Respect 59 Monthly Checking, Inspection, Servicing And Maintenance Of Fire Fighting System, Equipments Hydrants, Extinguishers Of All Type, Water Monitor Up To The Mark As Per Oisd / Isi Standards To Provide & Best Functioning Of The Equipments Always In Best Healthy Condition Inclusive Of Periodically Cleaning, Checking / Inspection / Oiling / Greasing Of Assemblies Such As Coupling, Nozzles, Valves, Hydrants, Extinguishers, Hose Pipes, Water Monitor, Compounds Drums, Nozzles Foam Bunch, Hose Boxes, Sand Buckets Etc, Updating The Data & Identification Tags, Recording The Status Of Checking In History Register Etc. As Directed By The Engineer In Charge With All Labors, Carriages, Materials Etc. Complete Inclusive Of All Taxes. ( Inspection And Servicing Of The Equipment / Fire Fighting Facilities Is To Be Done Periodically As Mentioned Against Each ) : 60 Fire Hydrants 61 Fire Extinguishers Of All Types & Capaci 62 Valves Of Fire Line Of Sizes 4-16 Nb 63 Foam / Water Monitors 64 Fire Hose 65 Hose Box 66 Nozzles All Types Including Foam Branch 67 Sand Buckets With Sands For All Bucket 68 Foam Trolley. Foam Tank 200 / 1000 Ltr. Ca 69 Inspection And Hydrotest Of Fire Fighting Delivery Hoses As Per Direction Of Eic And Oisd-142 Inclusive Of All Tools & Tackles , Consumable, Transportation Labour Charges Etc. Reporting To Be Done Inprescibed Format ( Rate Per Hose ) , Half Yearly Schedule 70 Refilling Of Breathing Apparatus Set Compressed Air Upto A Pressure Of 200 / 300 Bar As Per Direction Of Eic, Inclusive Of Transportation, Handling Charges, Hydro Testing From Cce Approved Party , Complete In All Respect. 71 Refilling Of Co2 Gas In Cartridges For Using In Dcp Extinguishers Including All Labour, Transportation Etc.Complete As Per Specification And Direction Of Eic / Site-Engineer. ( Co2 Cartridge Of 120 / 200Gms ) 72 Hydrostatic Testing, Inspection Of Safety Valve, And Refilling Of High Pressure Cylinder Through Cce Approved Party And Charging Upto Required Pressure Including Taking Delivery Of The Cylinder From The Station And Returning The Same Inclusive Of All Labour, Material Transportation And All The Other Incidental Expenses ) The Cylinder Is To Be Returned Back To The Station Within 15 Days From The Date Of Receiving From The Station. ( For 2.0 Kg Co2 Cyl. ) 73 Hydrostatic Testing, Inspection Of Safety Valve, And Refilling Of High Pressure Cylinder Through Cce Approved Party And Charging Upto Required Pressure Including Taking Delivery Of The Cylinder From The Station And Returning The Same Inclusive Of All Labour, Material Transportation And All The Other Incidental Expenses ) The Cylinder Is To Be Returned Back To The Station Within 15 Days From The Date Of Receiving From The Station. ( For 4.5 Kg Co2 Cyl. ) 74 Hydrostatic Testing, Inspection Of Safety Valve, And Refilling Of High Pressure Cylinder Through Cce Approved Party And Charging Upto Required Pressure Including Taking Delivery Of The Cylinder From The Station And Returning The Same Inclusive Of All Labour, Material Transportation And All The Other Incidental Expenses ) The Cylinder Is To Be Returned Back To The Station Within 15 Days From The Date Of Receiving From The Station. ( For 6.5 / 6.8 Kg Co2 Cyl. )

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail