National Highways and Infrastructure Development Corporation Limited-NHIDCL has published Consultancy Services For Ae For Supervision Of ( I ) Construction Of 2-Lane Chisopani Traffic Tunnel Of Length 250 M ( Ii ) Special Protection Work On Rehabilitation And Restoration Of Sliding/Sinking Zone On Nh-10 ( Rangpo To Ranipool Section ). Submission Date for this Tender is 19-04-2021. Consultancy Service Tenders in Sikkim Sikkim. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 03-Mar-2021 | Corrigendum No. 1 | Date | 19-03-2021 |
2 | 09-Mar-2021 | Corrigendum No. 2 | Other | 19-03-2021 |
3 | 18-Mar-2021 | Corrigendum No. 3 | Date | 02-04-2021 |
4 | 26-Mar-2021 | Corrigendum No. 4 | Other | 02-04-2021 |
5 | 01-Apr-2021 | Corrigendum No. 5 | Date | 19-04-2021 |
Name of Work: Consultancy Services for Authority’s Engineer for supervision of “(i) Construction of 2-lane Chisopani Traffic Tunnel of length 250 m including approaches from Km 67+080 to Km 67+500 on NH-10 in East District of Sikkim on EPC basis (ii) Special protection work on rehabilitation and restoration of sliding/sinking zone from Km 70+900 to Km 71+100 and Km 71+550 to Km 71+850 with JICA Technical Assistance including widening of narrow zone from Km 53+775 to Km 54+100 and fom Km 63+045 to Km 63+470 on NH-10 (Rangpo to Ranipool section) ” | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Remuneration for Local Staff (inclusive of per Diem allowance) | |||
2 | 1.01 | Team Leader Cum Senior Tunnel Expert (1 No) | 12 | Man Months | |
3 | 1.02 | Senior Geotechnical Engineer cum Safety & Excavation Expert (1 No) | 4 | Man Months | |
4 | 1.03 | Quality cum Material Expert (1 No) | 12 | Man Months | |
5 | 1.04 | Highway Engineer(1 No) | 12 | Man Months | |
6 | 2 | Sub Professional Staffs | |||
7 | 2.01 | Survey/Site Engineer (1 No. during Construction Period + 1 during Maintenance Period) | 24 | Man Months | |
8 | 2.02 | Quantity Surveyor (1 No. during Construction Period) | 12 | Man Months | |
9 | 3 | Support Staff (inclusive of per diem allowance) | |||
10 | 3.1 | Office Manager (1 No. during Construction and 1 No. in Maintenance) | 24 | Man Months | |
11 | 3.2 | Computer operator cum steno (1 No. during Construction and 1 No. in Maintenance) | 24 | Man Months | |
12 | 4 | Transportation (Fixed Costs) | |||
13 | 4.1 | Bolero or equivalent 4 x 4 vehicles (not more than 3 years old) (1 no during Construction Period and 1 no during Maintenance Period.), Rate per month | 24 | Man Months | |
14 | 5 | Duty Travel to Site (Fixed Cost) : Professional and Sub-Professional staff. The Employer may require a Key Personnel to visit Employer's Site Office/Regional Office/ HQ the quoted amount against remuneration should include Travel Fare for 5 Round Trips to Employer's Head Office (including Hotel Charges, Travel Cost Etc ) | 1 | LS | |
15 | 6 | Office Rent (Fixed Costs) \nThe rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. (Rate per Month)\n | |||
16 | 6.1 | Main Office of minimum 200 sqm area (location as decided by the Authority) | 24 | Man Months | |
17 | 7 | Office Supplies, Utilities and Communication (Fixed Costs), Rate per Month\n | |||
18 | 7.1 | Office Supplies for Main Office | 24 | Man Months | |
19 | 7.2 | Drafting Supplies for Main Office | 24 | Man Months | |
20 | 7.3 | Computer Running Costs for Main Office | 24 | Man Months | |
21 | 7.4 | Domestic and International Communication for Main Office | 24 | Man Months | |
22 | 8 | Office Furniture and Equipment (Rental): The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internallines), photocopier(15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs (5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc. | |||
23 | 8.01 | For Main Office | 24 | Man Months | |
24 | 9 | Reports and Document Printing ( rate as per copy)\n | |||
25 | 9.01 | Monthly reports\n(Design and Construction)\n | 36 | copy | |
26 | 9.02 | Half yearly Reports | 6 | copy | |
27 | 9.03 | Various others reports as provided in the Concession Agreement such as Completion Report | 6 | LS | |
28 | 10 | Road Survey Equipment, Rate per Km | |||
29 | 10.01 | Surface defects detection and roughness measurement using Network Survey Vehicle\n\n | 1 | Km. | |
30 | 10.02 | Pavement strength measurement using FWD\n | 1 | Km. | |
31 | 10.03 | Road signs inspection using Retro Reflectometer | 1 | Km. | |
32 | 11 | Contigencies\nA fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. \n(Fixed as Rs. 10,00,000) | ksdks | 1 | LS |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail