Works Contract Cheyyur Sub Division Maintenance Running Contract For Maintenance Works Labour Works In Respect Of Cheyyur Sub Division
Tender Overview
Project Description
Works Contract Cheyyur Sub Division Maintenance Running Contract For Maintenance Works Labour Works In Respect Of Cheyyur Sub Division
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 09-Feb-2021 | MODIFICATION IN WORK TITLE | Other | 17-Feb-2021 |
| 2 | 10-Feb-2021 | BQR Condition and EMD Under taking format | Technical Bid | 17-Feb-2021 |
BOQ
| Name of Work: ainatanance Running Contract for various maintanance Works -Labour Works in respect of Assistant Executive Engineer/O&M/Cheyyur Sub Division | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1.01 | Excavation of pole pit for 7.5/8 metres Normal | item1 | 250 | per each |
| 2 | 1.02 | Excavation of pole pit for 7.5/8 metres Semi Rocky | item2 | 50 | per each |
| 3 | 1.03 | Excavation of pole pit for 7.5/8 metres Rocky Soil | item3 | 20 | per each |
| 4 | 1.04 | Excavation of 9/9.14 RCC/RSJ all sizes and other poles including excavation of pole pit (pit size 3'x3'x1/6th of the length of poles) Normal | item4 | 50 | per each |
| 5 | 1.05 | Excavation of 9/9.14 RCC/RSJ all sizes and other poles including excavation of pole pit (pit size 3'x3'x1/6th of the length of poles) Semi Rocky | item5 | 20 | per each |
| 6 | 1.06 | Excavation of 9/9.14 RCC/RSJ all sizes and other poles including excavation of pole pit (pit size 3'x3'x1/6th of the length of poles) Rocky Soil | item6 | 10 | per each |
| 7 | 1.07 | Erection of pole 7.5/8 metres and refilling of earth | item7 | 320 | per each |
| 8 | 1.08 | Erection of pole 9/9.14 metres and refilling of earth | item8 | 50 | per each |
| 9 | 1.09 | Erection of pole RSJ Poleabove 30' and refilling of earth | item9 | 30 | per each |
| 10 | 1.1 | Trasportation of pole of all sizes from Road side upto 2KM | item10 | 400 | per each |
| 11 | 1.11 | Trasportation of pole of all sizes from Road side upto 2KM Above 2 Km - Per Km | item11 | 400 | Per each/Km |
| 12 | 1.12 | Base concerting 30 cm thick for one pole including of all materials | item12 | 150 | per each |
| 13 | 1.13 | Erection of V cross arm 3 1/2' size | item13 | 30 | per each |
| 14 | 1.14 | Erection of V cross arm 4 1/2' size | item14 | 20 | per each |
| 15 | 1.15 | Erection of Tapping channel 5 ' size / V Cross Arm 5' size | item15 | 20 | per each |
| 16 | 1.16 | Excavation of stay pit Normal Soil | item16 | 250 | per loc |
| 17 | 1.17 | Excavation of stay pit Semi Rocky | item17 | 50 | per loc |
| 18 | 1.18 | Excavation of stay pit Rocky Soil | item18 | 20 | per loc |
| 19 | 1.19 | Erection of stay set complete | item19 | 320 | per set |
| 20 | 1.2 | Fixing of 11 KV TI fitting | item20 | 40 | per each |
| 21 | 1.21 | Fixing of 33 KV TI fitting | item21 | 30 | per each |
| 22 | 1.22 | Fixing of LT 3 phase cross arm | item22 | 250 | per each |
| 23 | 1.23 | Fixing of LT TI fitting | item23 | 80 | per each |
| 24 | 1.24 | Fixing of single phase cross arm | item24 | 100 | per each |
| 25 | 1.25 | LT pin insulator with pin | item25 | 750 | per each |
| 26 | 1.26 | LT shackle with strap sets | item26 | 350 | per each |
| 27 | 1.27 | 11 KV pin insulator with GI pin | item27 | 150 | per each |
| 28 | 1.28 | 33 KV pin insulator with GI pin | item28 | 50 | per each |
| 29 | 1.29 | 11 KV strain disc with metal parts | item29 | 75 | per each |
| 30 | 1.3 | 33 KV strain disc with metal parts | item30 | 50 | per each |
| 31 | 1.31 | Fixing of Aluminium knob | item31 | 320 | per each |
| 32 | 1.32 | Concreting of poles with 1:3:6 mix, 1.1/2 broken metal jelly and M sand including coping (M sand, jelly and cement, will be supplied by the contractor) (size 2x3x1/6th of pole height)7.5 metres/8 metres pole | item32 | 25 | per each |
| 33 | 1.33 | Concreting of poles with 1:3:6 mix, 1.1/2 broken metal jelly and M sand including coping (M sand, jelly and cement, will be supplied by the contractor) (size 2x3x1/6th of pole height) 9.14 metres pole (with coping of 1' dia upto height of 1.1/2' above ground level) | item33 | 20 | per each |
| 34 | 1.34 | Coil Earthing of poles | item34 | 100 | per each |
| 35 | 1.35 | Paving out conductor, stringing and sagging of line of all sizes of ACSR / AAAC conductors of HT/LT lines including pin binding of supports and terminating at shackle 7/2.59 mm ACSR/7/2.50 AAAC | item35 | 8000 | RM |
| 36 | 1.36 | Paving out conductor, stringing and sagging of line of all sizes of ACSR / AAAC conductors of HT/LT lines including pin binding of supports and terminating at shackle 7/3.35 mm ACSR/7/3.15 AAAC | item36 | 4000 | RM |
| 37 | 1.37 | Paving out conductor, stringing and sagging of line of all sizes of ACSR / AAAC conductors of HT/LT lines including pin binding of supports and terminating at shackle Raccoon 7/4.09 mm | item37 | 2000 | RM |
| 38 | 1.38 | Paving out conductor, stringing and sagging of line of all sizes of ACSR / AAAC conductors of HT/LT lines including pin binding of supports and terminating at shackle Dog conductor 7/4.72 mm | item38 | 1500 | RM |
| 39 | 1.39 | Providing of guarding per span excluding of stay set erection 2 wire flat guarding(Split neutral grounding) | item39 | 80 | per span |
| 40 | 1.4 | Providing of guarding per span excluding of stay set erection 4 wire flat guarding | item40 | 30 | per span |
| 41 | 1.41 | Erection of spacers & jumpers Provision of 'PA' jumpers | item41 | 500 | per each |
| 42 | 1.42 | Maintenance of DT structure for various capacity (pole mounted structure),DP/TP Structure maintenance,DT maintenance,Structure earthing wire redoing,Replacement of Structure earthing in complete without material,DT structure Yard cleaning,Watering to earth pits, | item42 | 100 | Per Structure |
| 43 | 1.43 | Maintenance of 11 KV ABS only. (Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating). 11 KV AB switch structure | item43 | 40 | per set |
| 44 | 1.44 | Maintenance of 11 KV ABS only. (Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating). 11 KV AB switch centre rotating | item44 | 10 | per set |
| 45 | 1.45 | Maintenance of 33 KV ABS only. (Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating). 33 KV AB switch structure | item45 | 10 | per set |
| 46 | 1.46 | Maintenance of 33 KV ABS only. (Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating). 33 KV AB switch centre rotating | item46 | 20 | per set |
| 47 | 1.47 | Tree Branches cutting | item47 | 1000 | Per Branch |
| 48 | 1.48 | Cutting of big tree fouling on the line. | item48 | 500 | per tree |
| 49 | 1.49 | Cutting of tree branches fouling on the line. | item49 | 500 | per tree |
| 50 | 1.5 | Clearing of heavy bushes/ Jungle/bushes/velikathan clearence | item50 | 150 | per sq.mtr |
| 51 | 1.51 | Set righting leaned HT Poles Pin Point location HT | item51 | 80 | per loc |
| 52 | 1.52 | Set righting leaned LT Poles Cut Point Location LT | item52 | 200 | per loc |
| 53 | 1.53 | Set righting leaned HT Poles Cut Point Location HT | item53 | 80 | per loc |
| 54 | 1.54 | Set righting leaned LT Poles Cut Point Location LT | item54 | 200 | per loc |
| 55 | 1.55 | Re-sagging (HT) 7/4.72 mm | item55 | 300 | RM |
| 56 | 1.56 | Re-sagging HTorLT 7/4.09 mm | item56 | 500 | RM |
| 57 | 1.57 | Re-sagging HTorLT 7/3.35 mm | item57 | 500 | RM |
| 58 | 1.58 | Re-sagging HTorLT 7/2.59 mm | item58 | 500 | RM |
| 59 | 1.59 | Dismantling of 7.5m/8.0m Poles | item59 | 150 | per pole |
| 60 | 1.6 | Dismantling of 9.14 Mtr. Poles/RSJ/Tubular Poles | item60 | 50 | per pole |
| 61 | 1.61 | Dismantling of Stay set complete | item61 | 100 | per Loc |
| 62 | 1.62 | Dismantling of conductors including Coiling workspot upto 7/3.35 mm without transport | item62 | 10000 | RM |
| 63 | 1.63 | Dismantling of conductors including Coiling road side above 7/3.35 mm without transport | item63 | 3000 | RM |
| 64 | 1.64 | Releasing of LT S ph \"X\" Arm/TI Fitting | item64 | 200 | per each |
| 65 | 1.65 | Releaasing of LT 3 ph \"X\" Arm | item65 | 300 | per each |
| 66 | 1.66 | Releasing of 3' - 6\" \"V\" Cross Arm orTapping channal/Guarding \"X\" Arm | item66 | 100 | per each |
| 67 | 1.67 | Releasing of 4' - 6\"/ \"V\" Cross Arm | item67 | 50 | per each |
| 68 | 1.68 | Releasing of 5' \"V\" Cross Arm | item68 | 25 | per each |
| 69 | 1.69 | Dismantling of Guarding including Dismantling of cross arm per span | item69 | 50 | per span |
| 70 | 1.7 | Dismantling of Single ph service wire & re-effecting service including meter | item70 | 1500 | per Sc |
| 71 | 1.71 | Dismantling of three ph service wire & re-effecting service including meter | item71 | 600 | per Sc |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.