Kerala Water Authority-KWA has published Amrut Water Supply Supply And Fixing Ami Or Amr Smart Water Meter With Lora Technology. Submission Date for this Tender is 18-02-2021. Water Meters Tenders in Project Division Tvpm Kerala. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 05-Feb-2021 | Technical Cotrrigendum | Technical Bid | 10-02-2021 |
2 | 11-Feb-2021 | Extension Corrigendum | Date | 18-02-2021 |
Work Name:AMRUT Water Supply - Supplying and Fixing AMI/AMR smart water meter with LoRA Technology- Phase II | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Working charges | BI01010001010000000000000515BI0100001112 | ||
2 | 1.001 | Supply and installation of 15mm smart water meter- AMR/AMI, ultra-sonic smart water meter with LoRaWAN technology, brass body with necessary pipe fittings like reducer/FTA/MTA/union of required size, as directed by the departmental officer and as per the site condition. The meter should be waterproof (IP68) as per the RFP specification with a test certificate from KWA approved lab. The meter should have a minimum of 10 years of replacement warranty including battery. FCRI lab test certificate is mandatory for a sample meter in a lot of 50Nos. | BI01010001010000000000000515BI0100001113 | 250 | No |
3 | 1.002 | Supply and installation of 20mm smart water meter- AMR/AMI, ultrasonic smart water meter with LoRaWAN technology, brass body with necessary pipe fittings like reducer/FTA/MTA/union of required size, as directed by the departmental officer and as per the site condition. The meter should be waterproof (IP68) as per the RFP specification with a test certificate from KWA approved lab. The meter should have a minimum of 10 years of replacement warranty including battery. FCRI lab test certificate is mandatory for a sample meter in a lot of 50Nos. | BI01010001010000000000000515BI0100001114 | 150 | No |
4 | 1.003 | Supplying and fixing Poly Propylene (PP) meter protecting box with a removable lid, lock, and can be anchored to a leveled concrete surface with a minimum thickness of 3cm. The box should withstand a static load of 200 kg and an impact load of 500 kgf.including concrete works . | BI01010001010000000000000515BI0100001115 | 400 | No |
5 | 1.004 | Meter replacing charge to be paid at revenue section | BI01010001010000000000000515BI0100001116 | 400 | No |
6 | 1.005 | Testing charges for a sample meter from a lot of 50 nos. The testing should be done in FCRI lab palakkad . | BI01010001010000000000000515BI0100001117 | 8 | No |
7 | 2 | Additional works if required | BI01010001010000000000000515BI0100001118 | ||
8 | 2.001 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | BI01010001010000000000000515BI0100001119 | 3 | cum |
9 | 3 | Additional Supply of materials | BI01010001010000000000000515BI0100001120 | ||
10 | 3.001 | Supply of 20 mm dia Gunmetal gate valve with a wheel. | BI01010001010000000000000515BI0100001121 | 25 | No |
11 | 3.002 | Supply of Brass full way valve with C.I. wheel (screwed end) 25 mm dia | BI01010001010000000000000515BI0100001122 | 15 | No |
12 | 3.003 | Supply of PVC Pipe, 10kg/cm2, 20mm Dia. | BI01010001010000000000000515BI0100001123 | 25 | metre |
13 | 3.004 | Supply of PVC Pipe, 10kg/cm2, 25mm Dia. | BI01010001010000000000000515BI0100001124 | 15 | metre |
14 | 4 | Supply, Installation and configuration for the Smart Metering - (end-to-end solution) | BI01010001010000000000000515BI0100001125 | ||
15 | 4.001 | LoRaWAN Establishment - Supply, installation, and setting up of LoRaWAN (all software and hardware components) ensuring full-fledged LoRaWAN availability(as per requirements of the installed smart meters) in the selected location including setting up of towers, Gateways, internet connectivity devices, network & application servers, other necessary infrastructure and internet/backhaul recurring charges if any. (for 10 years) | BI01010001010000000000000515BI0100001126 | 4 | L.S |
16 | 4.002 | Supply, installation, and configuration of web-based meter data management solution (software and hardware) including visualization, interlinking the data to the existing billing software in Kerala Water Authority, and Integration of KWA software to ICCC platform for visualization, analysis, and prediction purposes. | BI01010001010000000000000515BI0100001127 | 1 | L.S |
17 | 5 | Operations & Maintenance Charges for all equipment and Software provided | BI01010001010000000000000515BI0100001128 | ||
18 | 5.001 | Operation & Maintenance charges for all equipment and software(upgradation of soft ware also ) provided under this project for 10 years including routine check per year. | BI01010001010000000000000515BI0100001129 | 1 | set |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy