Supply Of 11 Kv Ab Switches With 11 Kv Pt Insulator As Per Tender Specification
Tender Overview
Project Description
Supply Of 11 Kv Ab Switches With 11 Kv Pt Insulator As Per Tender Specification , Supply Of 11 Kv Ab Switches With 11Kv Pt Insulator , 0 . 6Kva Ups , F 11 Kv Ab Switches With 11Kv Pt Insulator , Pole Pit For 9 . 0M And 9 . 14 M Psc/Rcc / All Metal Poles ( Each Pit ) 1 . 25 X 0 . 6 X 1 . 83 Mtr , Ordinary Soil , Semi Rocky Soil , Heavy Rocky Soil Where Blasting/ Cheseling Required [Specific Approval Should Be Obtained From Concerned Ee] , Stay Pit , In Ordinary Soil [0 . 95 X 0 . 6 X 1 . 2M] , Semi Rocky Soil , Stay Pit In Heavy Rocky Soil Where Blasting/ Cheseling Reqiured [Specific Approval Should Be Obtained From Concerned Ee] , Erection Of Poles & Stays ( Including Refilling Of Excavated Earth ) , Erection Of 7 . 5M / 8 . 0M Poles [Rcc / Psc] , Erection Of 9 . 00M / 9 . 14M Rcc / Psc/Rail Pole , Tubular Pole And All Metal Poles , Stay Set , Erection Stay Set Complete , Stay Erection Without Rod And Pit , Replacement Of Stay Rod Only . ( Including Stay Pit Excavation & Refilling & Erection ) , Replacement Of Guy Shackle Only In Existing Stay , Erection Of Line Materials , Fixing Of Lt 1 Ph X Arm , Fixing Of Lt/Ht Ti Fitting , Fixing Of Lt 3 Ph X Arm , Fixing Of 3[1/2] V ` X Arm , Fixing Of 4[1/2] V ` X Arm , Fixing Of 5 V X Arm , Fixing Of Tapping Channel / Guarding X Arm , Providing Of Line Spacers In Lt Lines 1 Phase , Providing Of Line Spacers In Lt Lines 3 Phase , Erection Of Ab Switch With Pt Insulator & Jumpering Complete , Erection Of Centre Rotating Switch Ab Switch Complete , Fixing Of Ht Pin Insulator / Strain Disc , 11 Kv Pin Insulator With Pin , 11 Kv Strain Disc / Polymer Disc With Hardware , 22 Kv Pin Insulator With Pin , 22 Kv Strain Disc / Polymer Disc With Hardware , 33 Kv Pin Insulator With Pin , 33 Kv Pin Strain Disc/Polymer Disc With Hardware , Fixing Of Lt Pin Insulator With Pin , Lt Shakle With Hardware , Fixing Of Aluminium Knob , Paving Stringing And Sagging Of Conductor Including Binding Of Pin And Proper Tight [Including Transport Of Condutor From Road Side To Work Spot] Per Run , Upto 7/2 . 59 Mm Acsr , 7/2 . 50 Aaac Including Pvc Cable Upto 25 Sqmm , Acsr 7/3 . 35Mm & 7/ 3 . 15 Aaac Including Pvc Cable Above 25 Sqmm , Acsr 7/4 . 09 Mm , Above 7/4 . 09 Mm Acsr & Dog Conductor , Earthing Wiring And Connection Including Transporting Of Earth Pipe And Excavation Of Pit] , Transformer Structure Earthing 10Ft Depth - 3 Nos Of Pipe Through Tubes , Dp Earthing Including All Works [Double Side Earthing] , Erection Of 4Th Earth Pipe Including Earthing , Earthing Of Poles , Earth Pit Masonary Work 3 Nos Earth Pits Or Using 3 Nos Concrete Tub . , Replacement Of Detoriated Earth Pipe Per Location , Concreting With Mixture 1:3:6 [Including All Materials] . , Mass Concreting For Centre Support For 2 Feet Including All Materials , Mass Concreting For Pole0 . 6X0 . 6X1 . 25M . With Coping , Sleeve Concreting For Pole 0 . 6 M X 0 . 6M X 0 . 3 M With Coping , Sleeve Concreting For Stay Set 0 . 3 M & 0 . 75 Long , Erection Of Distribution Transformer Structure Complete , Excavation Of Structure Pole Pits 0 . 9 X 0 . 9 X 1 . 83 Mtr , Transporting Of Pole To Pit Location 2 Nos . , Erection Of Poles 2 Nos , Excavation Of Stay Pit 4 Nos , Erection Of Stay Set ( 4 Sets ) , Mass Concreting ( Cement:Sand:Jelly Supplied By The Contractor ) 2 Nos . , Erection Of 22 Kv Ab Switch , Ttransformer Structure Earthing 10Ft Depth - 3 Nos Of Pipe Through Earth Tubes , Erection Of Top Channel , Bed Channel [2 Nos Channel] Erection , Cross With Stud For Bed Channel Erection , Erection Of Belting Angle / Hg Fuse Angle , Erection Of Hg Fuse Set , Erection Of Ht Las With Jumpering And Earthing , Erection Of Lt Las With Jumbering And Earthing , Erection Of Jumpering [Ht Side] , Transformer Wiring In Lt Side Including Jumpering Bus Bar Etc . , Erection Lt Open Type Fuse Unit Arrangement Single , Erection Lt Open Type Fuse Unit Arrangement Double , Painting Of Stru . Complete Excluding Dt [Two Coat Of Red Oxide] All Metal Parts ( Excluding Cost Of Paint ) . , Painting Of Stru . Complete Excluding Dt [One Coat Alu Paint , Excluding Cost Of Paint ) , Colour Washing Of 2 Numbers Structure Pole [Excluding Cost Of Distember / Snowsem] , Painting Name Of Ss At Seating Channel Including Paint . , Painting Of Dt Alone [Excluding Painting] With Red Oxide And Double Coating Of Aluminium Paint . , Dt Metering Arrangement ( Without Materials ) , Erection Of Distribution Transformer /Dismantling Of Dt , Upto 100 Kva , Above 100 Kva And Upto 250 Kva , 500 Kva , Colour Washing Of Rcc / Psc Poles , Numbering Of Poles Including Cost Of Paint / Loc [Black Background And Yellow Letters] , Painting Of Sc Details In The Meter Board / Agl Boxes / Hut Scs Including Paint . , Service Connection , Transporting Of Required Materials From Road Side To Work Spot And Erection Of Street Light Fixture Including Wiring Clamping Of Pipe Aerial Board Assembling , Transporting Of Required Materials From Road Side To Work Spot And Erection Of 250 W S . V . Lamp / Mercury Lamp/Led Yard Light Fitting Including Wiring , Clamping Of Pipe , Serial Board Assembling Etc . , Fixing Of Street Light Fitting With 2 Cfl/ 4 Cfl , Provision Of St . Lt . Switching Arrangements Including Fixing Meters , Wiring , Service Board Etc . , Erection Of Hut Service Connection Complete With / Without Meter Including Transport Of 5Materials From Section Store To Work Spot , Erection/Dismantling Of Metering Set 11 Kv / 22 Kv/33 Kv , Fabrication Works . , Labour Charges For Alteration Of Back Clamp / Stay Clamp To Suitable For Works . , Providing Of Holes . , All Size Angles / Channel Upto 5/8 , All Size Angles / Channel Above 5/8 , Slot Holes In Flat / Angles / Channel Upto 3/4 , Slot Holes In Flat / Angles / Channel Above 3/4 , Fabrication Of Centre Support Only For Dt Structure , Cutting Of Rs Joist / Angles / Ms Channels , Welding Of Rs Joist / Angles / Ms Channels , General , Set Right The Leaning Pole In Both Ht & Lt [ Pin Point ] Location , Set Right The Leaning Pole In Both Ht & Lt [ Cut Point ] Location , Resagging Of Lines For All Sizes Cut Point Location , Converting Pin Point Into Cut Point Ht Lines , Converting Pin Point Into Cut Point Lt Lines , Clearing Tree Branches Of Coconut Tree , Clearing Tree Branches Of Neem , Tamarind , Country Tree Etc . , , Releasing And Erection 1 Ph Sc Wire [During Conductor Or Support Change] , Releasing And Erection 3 Ph Sc Wire [During Conductor Or Support Change] , Destruction Of Pole Concerting At Site . , Retrieving Grill From Detoriated Pole [Grill Separate From Damaged Pole] , Re Earthing Of Structure Completely Including Earthpipe Changing If Any 3Nos Earth Pipe , Re Examination Of Dt Earthing ( Digging , Inspection And Making Connection In Between Extg . 3Nos Earth Pipe ) , Guarding Arrangement :- , Cradle Guarding Including Earthing And Earth Pit Excavation [Railway & P&T Crossing ] , Flat Guarding With 4 Wire , Split Netural Guarding , Loading And Unloading : , Loading Of 7 . 5 Mtr / 8 . 0 Mtr Rcc / Psc/ Metal Pole [Per Pole ] , Loading Of [ 9 . 14 Mtr ] 9 . 0 Mtr Poles Rcc /Psc Pole / Metal Pole [ Per Pole ] , Unloading Of Psc / Rcc / Metal Poles , Transporting From Road Side To Workspot , Transport 7 . 5 Mtrs / 8 . 00 Mtrs Of Poles Including R . S . Joist And Rail Poles Upto 1 . 0 Km , Transport 7 . 5 Mtrs / 8 . 00 Mtrs Of Poles Including R . S . Joist And Rail Poles Above Additional 1 . 0 Km Or Part Thereof [ Certified By Aee ] , Transport Of 9 . 0 Mtr And Above Poles Including R . S . Joist And Rail Poles Upto 1 . 0 Km , Transport Of 9 . 0 Mtr And Above Poles Including R . S . Joist And Rail Poles Upto Above Additional 1 . 0 Km Or Part Thereof , Transport Of Line Ma
BOQ
| Name of Work: Supply of 11 KV AB Switches with 11KV PT Insulator | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Supply of 11 KV AB Switches with 11KV PT Insulator | |||
| 2 | 1.01 | 0.6KVA UPS | |||
| 3 | 1.02 | f 11 KV AB Switches with 11KV PT Insulator | Item 1 | 60 | Nos |
| 4 | 2 | Pole pit for 9.0M and 9.14 M PSC/RCC / all metal poles (each pit) 1.25 x 0.6 x 1.83 mtr | |||
| 5 | 2.01 | Ordinary soil | Item 3 | 1 | Pit |
| 6 | 2.02 | Semi rocky soil | Item 4 | 1 | Pit |
| 7 | 2.03 | Heavy rocky soil where blasting/ cheseling required [specific approval should be obtained from concerned EE] | Item 5 | 1 | Pit |
| 8 | 3 | Stay pit | |||
| 9 | 3.01 | in ordinary soil [0.95 x 0.6 x 1.2m] | Item 6 | 1 | Pit |
| 10 | 3.02 | semi rocky soil | Item 7 | 1 | Pit |
| 11 | 3.03 | Stay pit in heavy rocky soil where blasting/ cheseling reqiured [specific approval should be obtained from concerned EE] | Item 8 | 1 | Pit |
| 12 | 4 | Erection of poles & stays (Including refilling of excavated earth) | |||
| 13 | 4.01 | Erection of 7.5m / 8.0m poles [RCC / PSC] | Item 9 | 1 | Pit |
| 14 | 4.02 | Erection of 9.00m / 9.14m RCC / PSC/Rail pole, Tubular pole and all Metal Poles | Item 10 | 1 | E |
| 15 | 5 | Stay set | |||
| 16 | 5.01 | Erection stay set complete | Item 11 | 1 | Pit |
| 17 | 5.02 | Stay erection without rod and pit | Item 12 | 1 | Set |
| 18 | 5.03 | Replacement of stay rod only. (Including stay pit excavation & refilling & erection) | Item 13 | 1 | Pit |
| 19 | 5.04 | Replacement of guy shackle only in existing stay | Item 14 | 1 | E |
| 20 | 6 | Erection of LINE MATERIALS | |||
| 21 | 6.01 | Fixing of LT 1 ph \"X\" Arm | Item 15 | 1 | Pit |
| 22 | 6.02 | Fixing of LT/HT TI Fitting | Item 16 | 1 | Pit |
| 23 | 6.03 | Fixing of LT 3 ph \"X\" Arm | Item 17 | 1 | E |
| 24 | 6.04 | Fixing of 3[1/2]' ' V ` X ' arm | Item 18 | 1 | E |
| 25 | 6.05 | Fixing of 4[1/2]' V ` X ' arm | Item 19 | 1 | E |
| 26 | 6.06 | Fixing of 5' V X arm | Item 20 | 1 | E |
| 27 | 6.07 | Fixing of tapping channel / guarding \"X\" arm | Item 21 | 1 | E |
| 28 | 6.08 | Providing of line spacers in LT lines 1 phase | Item 22 | 1 | E |
| 29 | 6.09 | Providing of line spacers in LT lines 3 phase | Item 23 | 1 | E |
| 30 | 6.1 | Erection of AB Switch with PT insulator & Jumpering complete | Item 24 | 1 | Set |
| 31 | 6.11 | Erection of centre rotating Switch AB Switch complete | Item 25 | 1 | Set |
| 32 | 7 | FIXING OF HT PIN INSULATOR / STRAIN DISC | |||
| 33 | 7.01 | 11 KV Pin insulator with pin | Item 26 | 1 | Pit |
| 34 | 7.02 | 11 KV strain disc / polymer disc with hardware | Item 27 | 1 | Pit |
| 35 | 7.03 | 22 KV Pin insulator with pin | Item 28 | 1 | E |
| 36 | 7.04 | 22 KV Strain disc / polymer disc with hardware | Item 29 | 1 | E |
| 37 | 7.05 | 33 KV Pin insulator with pin | Item 30 | 1 | Pit |
| 38 | 7.06 | 33 KV Pin Strain disc/polymer disc with hardware | Item 31 | 1 | Pit |
| 39 | 7.07 | Fixing of LT Pin insulator with pin | Item 32 | 1 | E |
| 40 | 7.08 | LT Shakle with hardware | Item 33 | 1 | E |
| 41 | 7.09 | Fixing of Aluminium knob | Item 34 | 1 | E |
| 42 | 8 | Paving Stringing and sagging of conductor including binding of pin and proper tight [including transport of condutor from Road side to work spot] per run | |||
| 43 | 8.01 | Upto 7/2.59 mm ACSR, 7/2.50 AAAC including PVC cable upto 25 sqmm | Item 35 | 1 | Pit |
| 44 | 8.02 | ACSR 7/3.35mm & 7/ 3.15 AAAC including PVC cable above 25 sqmm | Item 36 | 1 | km |
| 45 | 8.03 | ACSR 7/4.09 mm | Item 37 | 1 | Pit |
| 46 | 8.04 | Above 7/4.09 mm ACSR & DOG conductor | Item 38 | 1 | km |
| 47 | 9 | Earthing wiring and connection including transporting of earth pipe and excavation of pit] | |||
| 48 | 9.01 | Transformer structure earthing 10ft depth - 3 nos of pipe through Tubes | Item 39 | 1 | Pit |
| 49 | 9.02 | DP earthing including all works [double side earthing] | Item 40 | 1 | E |
| 50 | 9.03 | Erection of 4th Earth pipe including earthing | Item 41 | 1 | E |
| 51 | 9.04 | Earthing of poles | Item 42 | 1 | E |
| 52 | 9.05 | Earth pit masonary work 3 nos earth pits or using 3 nos concrete tub. | Item 43 | 1 | Set |
| 53 | 9.06 | Replacement of detoriated earth pipe per location | Item 44 | 1 | E |
| 54 | 10 | Concreting with Mixture 1:3:6 [including All materials]. | |||
| 55 | 10.01 | Mass Concreting for centre support for 2 feet including all materials | Item 45 | 1 | Pit |
| 56 | 10.02 | Mass concreting for pole0.6x0.6x1.25M.with coping | Item 46 | 1 | Loc |
| 57 | 10.03 | Sleeve concreting for pole 0.6 m x 0.6m x 0.3 m with coping | Item 47 | 1 | Loc |
| 58 | 10.04 | Sleeve concreting for stay set 0.3 m & 0.75 long | Item 48 | 1 | Loc |
| 59 | 11 | Erection of Distribution Transformer Structure Complete | |||
| 60 | 11.01 | Excavation of structure pole Pits 0.9 X 0.9 X 1.83 Mtr | Item 49 | 1 | Pit |
| 61 | 11.02 | Transporting of pole to pit location 2 Nos. | Item 50 | 1 | 2Nos |
| 62 | 11.03 | Erection of poles 2 Nos | Item 51 | 1 | 2Nos |
| 63 | 11.04 | Excavation of stay pit 4 Nos | Item 52 | 1 | 4Nos |
| 64 | 11.05 | Erection of stay set (4 sets) | Item 53 | 1 | 4Nos |
| 65 | 11.06 | Mass concreting (Cement:Sand:Jelly supplied by the contractor) 2 Nos. | Item 54 | 1 | 2Nos |
| 66 | 11.07 | Erection of 22 KV AB Switch | Item 55 | 1 | E |
| 67 | 11.08 | Ttransformer structure earthing 10ft depth - 3 nos of pipe through Earth Tubes | Item 56 | 1 | Pit |
| 68 | 11.09 | Erection of Top Channel | Item 57 | 1 | E |
| 69 | 11.1 | Bed Channel [2 nos channel] Erection | Item 58 | 1 | Set |
| 70 | 11.11 | Cross with stud for bed channel Erection | Item 59 | 1 | Pit |
| 71 | 11.12 | Erection of belting angle / HG fuse angle | Item 60 | 1 | Set |
| 72 | 11.13 | Erection of HG fuse Set | Item 61 | 1 | Pit |
| 73 | 11.14 | Erection of HT LAS with jumpering and earthing | Item 62 | 1 | Set |
| 74 | 11.15 | Erection of LT LAS with jumbering and earthing | Item 63 | 1 | Set |
| 75 | 11.16 | Erection of Jumpering [HT Side] | Item 64 | 1 | Set |
| 76 | 11.17 | Transformer wiring in LT side including Jumpering Bus bar etc. | Item 65 | 1 | Set |
| 77 | 11.18 | Erection LT open type fuse unit arrangement single | Item 66 | 1 | Set |
| 78 | 11.19 | Erection LT open type fuse unit arrangement Double | Item 67 | 1 | Pit |
| 79 | 11.2 | Painting of stru. Complete excluding DT [two coat of red oxide] all metal parts(excluding cost of paint). | Item 68 | 1 | E |
| 80 | 11.21 | Painting of stru. Complete excluding DT [one coat Alu paint, excluding cost of paint) | Item 69 | 1 | E |
| 81 | 11.22 | Colour washing of 2 numbers structure pole [excluding cost of distember / snowsem] | Item 70 | 1 | E |
| 82 | 11.23 | Painting name of SS at seating channel including paint. | Item 71 | 1 | E |
| 83 | 11.24 | Painting of DT alone [excluding painting] with red oxide and double coating of aluminium paint. | Item 72 | 1 | E |
| 84 | 11.25 | DT metering arrangement (without materials) | Item 73 | 1 | E |
| 85 | 12 | Erection of distribution Transformer /dismantling of DT | |||
| 86 | 12.01 | Upto 100 KVA | Item 74 | 1 | Pit |
| 87 | 12.02 | above 100 KVA and Upto 250 KVA | Item 75 | 1 | E |
| 88 | 12.03 | 500 KVA | Item 76 | 1 | E |
| 89 | 12.04 | Colour washing of RCC / PSC poles | Item 77 | 1 | E |
| 90 | 12.05 | Numbering of poles including cost of paint / loc [black background and yellow letters] | Item 78 | 1 | E |
| 91 | 12.06 | Painting of SC details in the meter board / Agl boxes / Hut SCs including paint. | Item 79 | 1 | Pit |
| 92 | 13 | SERVICE CONNECTION | |||
| 93 | 13.01 | Transporting of required materials from road side to work spot and erection of street light fixture including wiring Clamping of pipe aerial board assembling | Item 80 | 1 | Pit |
| 94 | 13.02 | Transporting of required materials from road side to work spot and erection of 250 W S.V. lamp / Mercury lamp/LED Yard Light Fitting including wiring, clamping of pipe, serial board assembling etc. | Item 81 | 1 | Pit |
| 95 | 13.03 | Fixing of street light fitting with 2 CFL/ 4 CFL | Item 82 | 1 | Pit |
| 96 | 13.04 | Provision of St. Lt. switching arrangements including fixing meters, wiring, service board etc. | Item 83 | 1 | Pit |
| 97 | 13.05 | Erection of hut service connection complete with / without meter including transport of 5materials from section store to work spot | Item 84 | 1 | Pit |
| 98 | 13.06 | Erection/dismantling of metering set 11 KV / 22 KV/33 KV | Item 85 | 1 | Pit |
| 99 | 14 | Fabrication Works. | |||
| 100 | 14.01 | Labour charges for alteration of back clamp / stay clamp to suitable for works. | Item 86 | 1 | Pit |
| 101 | 15 | Providing of Holes. | |||
| 102 | 15.01 | All size angles / channel upto 5/8\" | Item 87 | 1 | Pit |
| 103 | 15.02 | All size angles / channel above 5/8\" | Item 88 | 1 | Pit |
| 104 | 15.03 | Slot holes in flat / angles / channel upto 3/4\" | Item 89 | 1 | Pit |
| 105 | 15.04 | Slot holes in flat / angles / channel above 3/4\" | Item 90 | 1 | Pit |
| 106 | 15.05 | Fabrication of centre support only for DT structure | Item 91 | 1 | Pit |
| 107 | 15.06 | Cutting of RS Joist / Angles / MS Channels | Item 92 | 1 | Pit |
| 108 | 15.07 | Welding of RS Joist / Angles / MS Channels | Item 93 | 1 | Pit |
| 109 | 16 | GENERAL | |||
| 110 | 16.01 | Set right the leaning pole in both HT & LT [ pin point ] location | Item 94 | 1 | Pit |
| 111 | 16.02 | Set right the leaning pole in both HT & LT [ cut point ] location | Item 95 | 1 | Pit |
| 112 | 16.03 | Resagging of lines for all sizes cut point location | Item 96 | 1 | km |
| 113 | 16.04 | Converting pin point into cut point HT lines | Item 97 | 1 | Loc |
| 114 | 16.05 | Converting pin point into cut point LT lines | Item 98 | 1 | Loc |
| 115 | 16.06 | Clearing tree branches of coconut tree | Item 99 | 1 | Per tree |
| 116 | 16.07 | Clearing tree branches of Neem, tamarind, country tree etc., | Item 100 | 1 | per tree |
| 117 | 16.08 | Releasing and erection 1 ph SC wire [during conductor or support change] | Item 101 | 1 | E |
| 118 | 16.09 | Releasing and erection 3 ph SC wire [during conductor or support change] | Item 102 | 1 | E |
| 119 | 16.1 | Destruction of pole concerting at site. | Item 103 | 1 | Loc |
| 120 | 16.11 | Retrieving grill from detoriated pole [grill separate from damaged pole] | Item 104 | 1 | E |
| 121 | 16.12 | Re earthing of structure completely including earthpipe changing if any 3nos earth pipe | Item 105 | 1 | E |
| 122 | 16.13 | Re examination of DT earthing ( Digging , inspection and making connection in between extg. 3nos Earth pipe ) | Item 106 | 1 | E |
| 123 | 17 | Guarding Arrangement :- | |||
| 124 | 17.01 | Cradle guarding including earthing and earth pit excavation [railway & P&T crossing ] | Item 107 | 1 | Pit |
| 125 | 17.02 | Flat guarding with 4 wire | Item 108 | 1 | Span |
| 126 | 17.03 | Split Netural Guarding | Item 109 | 1 | Span |
| 127 | 18 | LOADING AND UNLOADING : | |||
| 128 | 18.01 | Loading of 7.5 Mtr / 8.0 Mtr RCC / PSC/ Metal Pole [per pole ] | Item 110 | 1 | Pit |
| 129 | 18.02 | Loading of [ 9.14 mtr ] 9.0 mtr poles RCC /PSC Pole / Metal Pole [ per pole ] | Item 111 | 1 | Pit |
| 130 | 18.03 | Unloading of PSC / RCC / Metal Poles | Item 112 | 1 | Pit |
| 131 | 19 | TRANSPORTING FROM ROAD SIDE TO WORKSPOT | |||
| 132 | 19.01 | Transport 7.5 mtrs / 8.00 mtrs of poles including R.S.Joist and Rail Poles Upto 1.0 Km | Item 113 | 1 | km |
| 133 | 19.02 | Transport 7.5 mtrs / 8.00 mtrs of poles including R.S.Joist and Rail Poles above additional 1.0 Km or part thereof [ certified by AEE ] | ltem114 | 1 | km |
| 134 | 19.03 | Transport of 9.0 mtr and above poles including R.S. Joist and Rail poles upto 1.0 Km | ltem115 | 1 | km |
| 135 | 19.04 | Transport of 9.0 mtr and above poles including R.S. Joist and Rail poles upto above additional 1.0 Km or part thereof | ltem116 | 1 | km |
| 136 | 20 | TRANSPORT OF LINE MATERIALS | |||
| 137 | 20.01 | Transport of line Materials [ minimum 1 MT ] from sub stores to section pocket store or near to work spot at road side by using private vehicle or vice versa excluding loading and unloading Upto 8 kms | Item 117 | 1 | MT |
| 138 | 20.02 | Transport of line Materials [ minimum 1 MT ] from sub stores to section pocket store or near to work spot at road side by using private vehicle or vice versa excluding loading and unloading above 8 Kms and for every addl. 1 KM | ltem118 | 1 | MT |
| 139 | 21 | TRANSPORT OF EQUIPEMENTS | |||
| 140 | 21.01 | Transporting of Distribution Transformer/Metering set by using private vehicle load of one No.Minimum Up to 30 Km | ltem218 | 1 | Trip |
| 141 | 21.02 | .Transporting of Distribution Transformer/Metering set by using private vehicle load of one No.Minimum above 30 Km for every addl .1 KM | ltem120 | 1 | Trip |
| 142 | 22 | DISMANTLING WORKS | |||
| 143 | 22.01 | Dismantling of 7.5m / 8.0m poles [RCC / PSC] | ltem121 | 1 | Pit |
| 144 | 22.02 | Dismantling of 9.00m / 9.14m RCC / PSC/Rail pole, Tubular pole and all metal poles | ltem122 | 1 | E |
| 145 | 22.03 | Dismantling stay set complete | ltem123 | 1 | Set |
| 146 | 22.04 | Dismantling of LT 1 ph \"X\" Arm / LT/HT TI Fitting | ltem124 | 1 | E |
| 147 | 22.05 | Dismantling of LT/HT TI Fitting | ltem125 | 1 | E |
| 148 | 22.06 | Dismantling of LT 3 ph \"X\" Arm | ltem126 | 1 | E |
| 149 | 22.07 | Dismantling of 3[1/2]' V ` X ' arm | ltem127 | 1 | E |
| 150 | 22.08 | Dismantling of Tapping channel and Guarding X Arm | ltem128 | 1 | E |
| 151 | 22.09 | Dismantling of 11 KV strain disc/polymer disc with hardware | ltem129 | 1 | E |
| 152 | 22.1 | Dismantling of 22 KV Pin insulator with pin | ltem130 | 1 | E |
| 153 | 22.11 | Dismantling of 22 KV Strain disc with hardware | ltem131 | 1 | E |
| 154 | 22.12 | Dismantling of 33 KV Pin insulator with pin | ltem132 | 1 | E |
| 155 | 22.13 | Dismantling of 33 KV Strain disc with hardware | ltem133 | 1 | E |
| 156 | 22.14 | Dismantling of LT Pin insulator with pin | ltem134 | 1 | E |
| 157 | 22.15 | Dismantling of LT Shackle with hardware | ltem135 | 1 | E |
| 158 | 22.16 | Dismantling of Aluminium knob | ltem136 | 1 | E |
| 159 | 22.17 | Dismantling of Conductor 7/2.59 mm ACSR, 7/2.50 AAAC including PVC cable upto 25 sqmm | ltem137 | 1 | Km |
| 160 | 22.18 | Dismantling of Conductor ACSR 7/3.35mm & 7/ 3.15 AAAC including PVC cable above 25 sqmm | ltem138 | 1 | Km |
| 161 | 22.19 | Dismantling of Conductor ACSR 7/4.09 mm | ltem139 | 1 | Km |
| 162 | 23 | SINGLE PHASE METER &3 PHASE METER | |||
| 163 | 23.01 | Fixing of single phase meter | ltem140 | 1 | E |
| 164 | 23.02 | Fixing of 3 phase meter | ltem141 | 1 | E |
| 165 | 23.03 | Dismantling of single phase meter | ltem142 | 1 | E |
| 166 | 23.04 | Dismantling of 3 phase meter | ltem143 | 1 | E |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
Completed