Micro Sprinklar System Of 2 Ha Capacity ( 2 Nos ) Micro Sprinklar System Of 5 Ha Capacity ( 4 Nos ) Installation Of Solar Photovoltaic System Of 2 Hp Capacity ( 4 Nos ) And Installation Of Solar Photovoltaic System Of 3 Hp ( 1 No ) At Fo, Ramnagar Jamuna Bundh Watershed at mouza- Dhanku-West Bengal

Water Resources Department-WRD has published Micro Sprinklar System Of 2 Ha Capacity ( 2 Nos ) Micro Sprinklar System Of 5 Ha Capacity ( 4 Nos ) Installation Of Solar Photovoltaic System Of 2 Hp Capacity ( 4 Nos ) And Installation Of Solar Photovoltaic System Of 3 Hp ( 1 No ) At Fo. Submission Date for this Tender is 10-02-2021. Irrigation System Tenders in Ramnagar Jamuna Bundh Watershed at mouza- Dhanku West Bengal. Bidders can get complete Tender details and download the document.




Tender Notice

26788361
Micro Sprinklar System Of 2 Ha Capacity ( 2 Nos ) Micro Sprinklar System Of 5 Ha Capacity ( 4 Nos ) Installation Of Solar Photovoltaic System Of 2 Hp Capacity ( 4 Nos ) And Installation Of Solar Photovoltaic System Of 3 Hp ( 1 No ) At Fo
Open Tender
Indian
West Bengal
Ramnagar Jamuna Bundh Watershed at mouza- Dhanku
10-02-2021

Tender Details

Micro Sprinklar System Of 2 Ha Capacity ( 2 Nos ) Micro Sprinklar System Of 5 Ha Capacity ( 4 Nos ) Installation Of Solar Photovoltaic System Of 2 Hp Capacity ( 4 Nos ) And Installation Of Solar Photovoltaic System Of 3 Hp ( 1 No ) At For Ramnagar

Key Value

Document Fees
Refer document
EMD
INR 100153.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Micro sprinklar system of 2 Ha capacity ( 2 nos ) , Micro sprinklar system of 5 Ha capacity ( 4 nos ) , Installation of Solar Photovoltaic system of 2 HP Capacity ( 4 nos ) and Installation of Solar Photovoltaic system of 3 HP (1 No ) at for Ramnagar Jamuna Bundh Watershed at mouza- Dhankunia , JL no 141, plot no- 577/688; GP –Simlapal Block – Simlapal under Bankura (A-I) Division under Matir Shristi Programme.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Drilling work 4 Nos Drilling of borehole by direct rotary rig through any kind of soil or rock down to required depth by using not more than 320 mm dia. drill bit including arrangement of water for the bore hole all complete.\nN.B. :- (a) For Siliguri Sub-Divn./ Alipurduar Sub-Division/Malbazar Sub-Division/ Chopra Block (under Uttar Dinajpur District)/ Birbhum District/ Purulia District/ Bankura District / Paschim Midnapore District (except Ghatal, Daspur-I and II Block), the above rates shall be enhanced by 10%. (a) 0 mtr to 30 mtr. ( 4- N0s.) BI01010001010000000000000515BI0100001113 120 meter
2 2 (b) 30 mtr to 60 mtr ( 4- N0s.) BI01010001010000000000000515BI0100001114 120 Metre
3 3 (c) 60 mtr to 90 mtr ( 4- N0s.) BI01010001010000000000000515BI0100001115 120 Metre
4 4 (d) 90 mtr to 120 mtr ( 4- N0s.) BI01010001010000000000000515BI0100001116 120 Metre
5 5 (e) 120 mtr to 150 mtr ( 4- N0s.) BI01010001010000000000000515BI0100001117 120 Metre
6 6 Electrologging of bore hole of different dia tubewell for locating water bearing strata and saline aquifer, if any, after conducting relevant geophysical tests. All test reports and compiled data sheets should be submitted to Engineer-in-Charge (Cost is inclusive of all materials, labour & compilation of data sheets. The work should be done as per direction of Engineer-in-charge including compilation of data.)\n BI01010001010000000000000515BI0100001118 4 Complete depth of the well drilled
7 7 Supply of PVC pipes & fittings Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I).\n(A) PVC Pipes- 150 mm dia BI01010001010000000000000515BI0100001119 552 Metre
8 8 Supplying PVC strainer of approved make with adapter conforming to I.S.12818 specifications.\nv) 150 mm dia. , 7.5 mm thick BI01010001010000000000000515BI0100001120 48 Metre
9 9 Labour charges for lowering of pipe, strainers, blank pipe etc. and fitting, fixing the same including cutting, threading where necessary complete including bucket washing and other incidental works in this connection.\n(iii) 150 mm dia. G.I. Housing pipe.\nN.B. :- For lowering of PVC-U pipe rates for the item No. 3(iii) are to be reduced by 25% BI01010001010000000000000515BI0100001121 600 Metre
10 10 (a)Supplying, fitting, fixing including fabrication (IS -2800 Part -I with latest amendments) with required materials as directed by the Engineer-in-charge and lowering in position etc.(ii) M.S. Centre guide (consisting of 3 nos., 6 mm thick, 50 mm wide, not less than 600 mm long and 125 mm rise of arch) of approved quality.\n BI01010001010000000000000515BI0100001122 20 Each
11 11 Supplying, fitting and fixing including supplying of suitable joining compound for fixing in position, threading, if necessary etc. all complete.\n(c) 150 mm dia G.I. threaded top cap fixed in position. BI01010001010000000000000515BI0100001123 4 Each
12 12 Supply of PVC pipes & fittings Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I).\n(K) End Plug BI01010001010000000000000515BI0100001125 4 Each
13 13 Supply of gravel for use as pack in tube well of 2 mm to 4 mm. size (as per IS: 4097) and gravel treatment of tubewell including screening, washing, cleaning etc. of the gravels at the site, all complete as per direction of the Engineer-in-Charge. BI01010001010000000000000515BI0100001126 148 Cum
14 14 Supplying, fitting and fixing in position G.I. pipes of best quality make for underground works with all necessary accessories,specials viz.socket, bend, tee, union, cross, elbow, nipple, short piece etc.including cost of all materials,jointing materials ,cutting pipes,making threads,cutting trenches upto 1.5 metre below surface in all sorts of soil and refilling the same as directed with two coats of painting on G.I. pipes and specials with bituminous paint complete in all respect. (Payment will be made on the centre line measurement of the total pipe line including all specials No separate payment will be made for accessories, specials.Payment for painting will be made seperately) BI01010001010000000000000515BI0100001127 320 Metre
15 15 Development of tubewell with high velocity jetting tool combined with adequate capacity Air-compressor and carrying out yield test, as per prescribed method with report suggesting placement of pump (type + yield) after obtaining sediment and colour free water as per direction of the Engineer-in-Charge, including arranging, installing all equipments and testing instruments as required at site and dismantling the same after successful completion of tests, all complete.\nFor 150mm N.B/D.N slotted / screen pipes upto 15 metre length 4 Each
16 16 Ordinary cement concreting ( mix 1:1.5:3) of size 1.0 m x 1.0 m x 0.15 m & placing & fixing 150 mm dia. UPVC Pipe around the Tube well with graded stone chips (20mm nominal size, River Bazree ) including shuttering and reinforcement( 10 mm dia. @ 150 mm c/c) all complete at site as per direction of Engineer-in-Charge .\n 4 Each
17 17 MICRO SPRINKLER FOR 2 HA & 5HA PVC pipe 90 mm x 04 kgf/cm2 600 Metre
18 18 PVCpipe 75 mm x 04 kgf/cm2 2180 Metre
19 19 PVC pipe 63 mm x 04 kgf/cm2 150 Metre
20 20 PVC/PE Tube 20 mm Class-II 44000 Metre
21 21 MI Spr 16 to 110 lph 8800 No
22 22 Stake for Sprinkler Set 8800 No
23 23 PVC Control Valve 90 mm 8 No
24 24 PVC Control Valve 75 mm 17 No
25 25 PVC Control Valve 63 mm 3 No
26 26 Flush Valve 75 mm 24 No
27 27 Flush Valve 63 mm 1 No
28 28 PVC AIR RELEASE VALVE MINI1 " 5 No
29 29 PVC Non Return Valve 63 mm 5 No
30 30 BUTTERFLY VALVE C.I. 65 MM -2.5” 5 No
31 31 Metal Screen Filter 30 m3/hr 2.5'' 5 No
32 32 G.I. BYPASS&ARV M/F 2.5"X1.5"X1" 1 No
33 33 G.I. BYPASS & ARV M/F 2"X1.5"X1" 4 No
34 34 Ventury Assembly Complete 2’’ Plastic 5 No
35 35 Fittings and Accessories @5 % 1 Item
36 36 INSTALLATION OF SPV MODULE AND PUMP FOR SPRINKLER OPERATION (2 HP) Solar Module: Supply, transport, installation and commissioning of MNRE (Ministry of Renewable Energy,Govt. of India)/ IEC approved Solar Module of multicrystaline cell with min. efficiency of 15% and fill factor more than 70%, laminated between sheet of -Ethylene Vinyl Acetate (EVA) and high transmissivity 3.2 mm tempered glass, framed in anodized aluminium frame .The power output of individual PVmodules used in the PV array, under STC,should be a minimum of 300 Watt peak,with adequate provision for measurement tolerances. Modules supplied with the Spv system should have certificate as per IEC61215 specification or equivalent National or International standards. Modules must qualify to IEC61730 part I and part II for safety qualification testing and Salt Mist Corrosion. Testing as per IEC61701/IS 61701.and havingwarranty for output wattage, which should not be less than 90% at the end of 10 years and 80 % at the end of 25 years. Necessary Test Certificate should be provided.a) For 2 HP Off-grid Solar Water Pumping System (with Surface pump-motor set) - 2400 Wp with 300 SPVPanel. 9600 wp
37 37 Module Mounting Structure (For 2HP,3HP and 5HP SolarWater Pumping System): Supply, transport, installation of weather proof manualtracking structure madeof MS channels,anglesand pipes etc. duly IS marked channels and angles (IS 808 ) to hold SPV Module with MS heavy duty pipes not less than dia 125mm as per IS1239 and plates of IS 226. Structure like Canopy supported with a RCC column is to be installed to limit land requirement with a height of placementof panel for free human movement and natural air cooling will be happening to get the maximum efficiency from the modules.This structure to be designed considering all the possible loads on the solar panels and on suitable size is to be protected with minimum 80 micron galvanisation and provided with dual axis manual tracking arrangement three times in a day and seasonal tilting are to be provided to face the sun optimally. The weight of the Module Mounting Structure having 4 Module structure of 320/325 wp panels should not be less than 145 Kg, 6 Module structure of 320/325wp panels should not be less than 191Kg and 8 Module structure of 300 wp panels should not be less than 263 Kg. 840 wp
38 38 Foundation of Module Mounting Structure: Suitable and stable Reinforced Cement Concrete foundation for dual axis manual tracking SPV Module structure as per approved drawing. b) 4/6 module structure 4 Each
39 39 Power conditioning unit including MPPT, Data logger and IP54 enclosure:\nSupply , transport , installation and commissioning of IP S4 protected enclosured Inverter Unit qualifying IEC 61683-Efficiency measurement and IEC 600682-Environment Standard , safety standard suitable for 3 Phase A.C. motor, IGBT based high voltage switching inverter with MPPT technology, to take care of the variation of Sun light and will be suitably mounted inside the metal enclosure. Inverter should have protection against Dry run, Overcurrent, Under current, Overvoltage, Undervoltage, Short circuit etc. Systemshould be able to run at low sunshine and minimum 7 to 8 hours a day run should be possible during normal sunshinecondition. Inverter should have option to auto start for any short trip off due to low light/ cloudy situation exceptfor dry run. Inverter should be provided with a display to show the various parameter by the user such as Voltage, Current, Solar panel DC voltage, Inverter IGBT temperature, Out put AC voltage, Output frequency, Pump flow (direct or calculated method), Irradiation etc. The system should be capable to store the data at a set Interval and transfer it in a pendrive through USB port. It should also monitor and save total run time, total water pumped etc. There should be provision for interfacing GPRS based data transmission. for 2 HP capacity pump set 4 Set
40 40 Cable and Accessories:\nSupplying, fitting and fixings of UV rated Copper Cable laid inside HDPE conduit and other accessories as per followings with necessary connection with the Solar PV Module, MPPTetc.\nI. 4.0 Sq mm single core multi studs - 10 Mtrs (Minimum)\nII. 6.0 Sq mm single core multi studs -5 Mtrs (Minimum)\nIII. Lugs,HDPE Pipe,Flexible Pipe, Saddle, Cable tie etc.a) For 2 Hp Structure 4 Each
41 41 Earthing : Earthing with 50 mm dia GI pipe 3.64 mm thick x 3.04 Mts. long and 1 x 4 SWGGI (Hot Dip) wire (4 Mts. long), 13 mm dia x 80 mm long GI bolts, double nuts, double washers incl. S& F 15 mm dia GI pipe protection (1 Mt. long) to be filled with bitumen partly under the ground level and partly above ground level driven to an average depth of 3.65 Mts. below the ground level as below: By lSI-Medium GI pipe including excavation of soil for installation of Earth Electrode and filling & ramming and connecting to individual structure to earth electrode including S&F 20 mm x 3 mm galvanised (Hot Dip) MS flat on wall/floor with GI saddles as required and connection to equipments incl. drilling holes, with bolts, nuts, washers etc complete. 4 Set
42 42 Lightning protection (Pole mounted): Lightningprotection with 3" X1.5" G.I pipe of 4 mts height with base flange in proper RCC foundation and S & F Lightning Conductor Air Terminal madeof 20 mm dia 1000 mm long GI pipe (lSI Medium) having five discharge prongs of 4 SWG GI (Hot Dip) wire at top duly soldered with 7/16 stranded GI (Hot Dip) wire and 85 mrn dia 6 mmthick GI baseplate at bottom Incl. necessaryholes etc. Earthing with 65 mm dia GI pipe (Medium) 3.0 Mts. long and 1 x 19/10 stranded GI (Hot Dip) wire (4 Mts. long), 20 mm dia x 125 mm long galvanized bolt, double nuts, double washers including socketing at both ends of stranded GI (Hot Dip) wire by crimping sockets/ thimbles and S& F40 mm dla GI pipe (lSI-Medium) protection (3 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level to an average depth of 3.65 Mts. (Provision of one lightning protection for each structure).Supply and installation of 3 phase electromotor pump set suitable for Solar operation covering 5 years warranty for the following conditions including loading, unloading, transportation etc. 4 Each
43 43 a) 2 HP surface mounted Monoblock Pump-motor set suitable for operation in 3 phase 200V series VFD 2.78 Lps discharge at 29 mts. total head suitable for 1.75 Ha/3 Ha CCA Sprinkler operation with foot valve, required quantity of flexible suction pipe, clamps,bend and all other accessories complete. 4 Set
44 44 Testing and commissioning of scheme after completion of all work. 4 Each
45 45 Comprehensive maintenance charges for 4 years beyond 1 year warranty period (which cover monthly inspection, Yearly training to WUA, to attend breakdown within 3 days and to keep the scheme in operation without lapse of time).a) For 2 HP surface pump 9600 wp
46 46 Insurance @ 2% for Item No. 1, 4 and 8 covering a period of 5 years. 4 Item
47 47 INSTALLATION OF SPV MODULE AND PUMP FOR SPRINKLER OPERATION (3 HP) Solar Module: Supply, transport, installation and commissioning of MNRE (Ministry of Renewable Energy,Govt. of India)/ IEC approved Solar Module of multicrystaline cell with min. efficiency of 15% and fill factor more than 70%, laminated between sheet of -Ethylene Vinyl Acetate (EVA) and high transmissivity 3.2 mm tempered glass, framed in anodized aluminium frame .The power output of individual PVmodules used in the PV array, under STC,should be a minimum of 300 Watt peak,with adequate provision for measurement tolerances. Modules supplied with the Spv system should have certificate as per IEC61215 specification or equivalent National or International standards. Modules must qualify to IEC61730 part I and part II for safety qualification testing and Salt Mist Corrosion. Testing as per IEC61701/IS 61701.and havingwarranty for output wattage, which should not be less than 90% at the end of 10 years and 80 % at the end of 25 years. Necessary Test Certificate should be provided.b) For 3 HP Off-grid Solar Water Pumping System (with Surface pump-motor set) - 3200/3250 Wp with 320/325 SPVPanel. 3200 Wp
48 48 Module Mounting Structure (For 2HP,3HP and 5HP SolarWater Pumping System): Supply, transport, installation of weather proof manualtracking structure madeof MS channels,anglesand pipes etc. duly IS marked channels and angles (IS 808 ) to hold SPV Module with MS heavy duty pipes not less than dia 125mm as per IS1239 and plates of IS 226. Structure like Canopy supported with a RCC column is to be installed to limit land requirement with a height of placementof panel for free human movement and natural air cooling will be happening to get the maximum efficiency from the modules.This structure to be designed considering all the possible loads on the solar panels and on suitable size is to be protected with minimum 80 micron galvanisation and provided with dual axis manual tracking arrangement three times in a day and seasonal tilting are to be provided to face the sun optimally. The weight of the Module Mounting Structure having 4 Module structure of 320/325 wp panels should not be less than 145 Kg, 6 Module structure of 320/325wp panels should not be less than 191Kg and 8 Module structure of 300 wp panels should not be less than 263 Kg. (One 4 panel+One 6 panel structure) 405 Kg
49 49 Foundation of Module Mounting Structure: Suitable and stable Reinforced Cement Concrete foundation for dual axis manual tracking SPV Module structure as per approved drawing.c) For 4 /6 module structure having a maximum capacity of 1950 Wp 2 Each
50 50 Power conditioning unit including MPPT, Data logger and IP54 enclosure:\nSupply , transport , installation and commissioning of IP S4 protected enclosured Inverter Unit qualifying IEC 61683-Efficiency measurement and IEC 600682-Environment Standard , safety standard suitable for 3 Phase A.C. motor, IGBT based high voltage switching inverter with MPPT technology, to take care of the variation of Sun light and will be suitably mounted inside the metal enclosure. Inverter should have protection against Dry run, Overcurrent, Under current, Overvoltage, Undervoltage, Short circuit etc. Systemshould be able to run at low sunshine and minimum 7 to 8 hours a day run should be possible during normal sunshinecondition. Inverter should have option to auto start for any short trip off due to low light/ cloudy situation exceptfor dry run. Inverter should be provided with a display to show the various parameter by the user such as Voltage, Current, Solar panel DC voltage, Inverter IGBT temperature, Out put AC voltage, Output frequency, Pump flow (direct or calculated method), Irradiation etc. The system should be capable to store the data at a set Interval and transfer it in a pendrive through USB port. It should also monitor and save total run time, total water pumped etc. There should be provision for interfacing GPRS based data transmission.b) For 3 Hp capacity Pump-motor set 1 Set
51 51 Cable and Accessories:\nSupplying, fitting and fixings of UV rated Copper Cable laid inside HDPE conduit and other accessories as per followings with necessary connection with the Solar PV Module, MPPTetc.\nI. 4.0 Sq mm single core multi studs - 10 Mtrs (Minimum)\nII. 6.0 Sq mm single core multi studs -5 Mtrs (Minimum)\nIII. Lugs,HDPE Pipe,Flexible Pipe, Saddle, Cable tie etc.a) For 3 Hp Structure 2 Each
52 52 Earthing : Earthing with 50 mm dia GI pipe 3.64 mm thick x 3.04 Mts. long and 1 x 4 SWGGI (Hot Dip) wire (4 Mts. long), 13 mm dia x 80 mm long GI bolts, double nuts, double washers incl. S& F 15 mm dia GI pipe protection (1 Mt. long) to be filled with bitumen partly under the ground level and partly above ground level driven to an average depth of 3.65 Mts. below the ground level as below: By lSI-Medium GI pipe including excavation of soil for installation of Earth Electrode and filling & ramming and connecting to individual structure to earth electrode including S&F 20 mm x 3 mm galvanised (Hot Dip) MS flat on wall/floor with GI saddles as required and connection to equipments incl. drilling holes, with bolts, nuts, washers etc complete. 2 Each Set
53 53 Lightning protection (Pole mounted): Lightningprotection with 3" X1.5" G.I pipe of 4 mts height with base flange in proper RCC foundation and S & F Lightning Conductor Air Terminal madeof 20 mm dia 1000 mm long GI pipe (lSI Medium) having five discharge prongs of 4 SWG GI (Hot Dip) wire at top duly soldered with 7/16 stranded GI (Hot Dip) wire and 85 mrn dia 6 mmthick GI baseplate at bottom Incl. necessaryholes etc. Earthing with 65 mm dia GI pipe (Medium) 3.0 Mts. long and 1 x 19/10 stranded GI (Hot Dip) wire (4 Mts. long), 20 mm dia x 125 mm long galvanized bolt, double nuts, double washers including socketing at both ends of stranded GI (Hot Dip) wire by crimping sockets/ thimbles and S& F40 mm dla GI pipe (lSI-Medium) protection (3 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level to an average depth of 3.65 Mts. (Provision of one lightning protection for each structure).Supply and installation of 3 phase electromotor pump set suitable for Solar operation covering 5 years warranty for the following conditions including loading, unloading, transportation etc. 2 Each
54 54 a) 3 Hp surface mountedMonoblock Pump Motor set suitable for operation in 3 phase 200V series VFD having discharge at required head as below: i) Surface pump motor-set with discharge of 7.14 lps 1 Set
55 55 Testing and commissioning of scheme after completion of all work. 1 Item
56 56 Comprehensive maintenance charges for 4 years beyond 1 year warranty period (which cover monthly inspection, Yearly training to WUA, to attend breakdown within 3 days and to keep the scheme in operation without lapse of time).b) For 3 HP surface pump 3200 Wp
57 57 Insurance @ 2% for covering a period of 5 years. 1 Item
58 58 Add GST @12.00% 4426859 *.12 = 531223.08 1 Item
59 59 Add CESS @1 % of Total of item no 1 to 68= Rs 4958082.87 x .01= Rs 49580.82 1 i
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail