| 1 | 1.01 | Preparation of scaffolding above Economiser Hopper for inspection & attending of Economiser Lower Bank Coil | work1 | 1 | Nos. |
|---|
| 2 | 2.01 | Cleaning of Ash in Dead Chamber, Penthouse, Cat House | work2 | 2 | Nos. |
|---|
| 3 | 3.01 | Preparation & Operation of Skyclimber in Furnace | work3 | 2 | Nos. |
|---|
| 4 | 4.01 | Inspection and repairs of doors/windows & peep holes of Boiler | work4 | 5 | Nos. |
|---|
| 5 | 5 | Cleaning & Repair of Windbox | | | |
|---|
| 6 | 5.01 | Repair of Windbox by patching | work6 | 100 | RM |
|---|
| 7 | 5.02 | Dismanteling of Steel Structures/Installation of new steel plate | work7 | 1 | MT |
|---|
| 8 | 6.01 | Rectification, Replacement & Refixing of protection sleeve (shielding) in various areas of Boiler tubes | work8 | 500 | Nos. |
|---|
| 9 | 7 | WELDING OF HP JOINTS OF BOILER TUBES | | | |
|---|
| 10 | 7.01 | Replacement of W/W burner panel tubes | work10 | 10 | Nos. |
|---|
| 11 | 7.02 | Waterwall tubes, Screen tubes, Hanger tubes, Rear arch tubes etc. | work11 | 100 | Nos. |
|---|
| 12 | 7.03 | Economiser tubes/ LTSH tubes | work12 | 150 | Nos. |
|---|
| 13 | 7.04 | Platen Superheater tubes | work13 | 30 | Nos. |
|---|
| 14 | 7.05 | Divisional Superheater tubes | work14 | 30 | Nos. |
|---|
| 15 | 7.06 | Economiser Support tubes | work15 | 40 | Nos. |
|---|
| 16 | 7.07 | LTSH Support tubes | work16 | 40 | Nos. |
|---|
| 17 | 7.08 | Superheater Steam cooled spacer tubes | work17 | 40 | Nos. |
|---|
| 18 | 7.09 | Reheater (Front Assembly) tubes | work18 | 30 | Nos. |
|---|
| 19 | 7.1 | Reheater (Rear Assembly) tubes | work19 | 30 | Nos. |
|---|
| 20 | 7.11 | Reheater cross over tubes | work20 | 10 | Nos. |
|---|
| 21 | 7.12 | Reheater Steam cooled spacer tubes. | work21 | 10 | Nos. |
|---|
| 22 | 7.13 | Lower/Upper corner transition tubes | work22 | 10 | Nos. |
|---|
| 23 | 7.14 | Roof tubes | work23 | 10 | Nos. |
|---|
| 24 | 8 | Alignment of tubes of SH Divisional Panel | work24 | 10 | Nos. |
|---|
| 25 | 9 | Alignment of tubes of Platen Superheater | work25 | 5 | Nos. |
|---|
| 26 | 10 | Algnment of Reheater | work26 | 20 | Nos. |
|---|
| 27 | 11 | Alignment of Economiser tubes | work27 | 30 | Nos. |
|---|
| 28 | 12 | Alignment of LTSH coils | work28 | 30 | Nos. |
|---|
| 29 | 13 | Peparation of HP tube bends | work29 | 50 | Nos. |
|---|
| 30 | 14 | Welding of Fins | work30 | 300 | RMtr. |
|---|
| 31 | 15 | Pad Welding of Thinned tubes (50mm to 150mm) | work31 | 500 | Nos. |
|---|
| 32 | 16 | APPLICATION OF REFRACTORY AT VARIOUS LOCATION OF BOILER | | | |
|---|
| 33 | 16.01 | Pent house, Door & Windows Etc. Grade 'C' | work33 | 2 | MT |
|---|
| 34 | 16.02 | Coal Burner Grade 'A' | work34 | 1 | MT |
|---|
| 35 | 17 | Re- enforcement of Welding Joints | work35 | 300 | Nos. |
|---|
| 36 | 18 | Replacement of Valves (Welded type)/Steam Traps | | | |
|---|
| 37 | 18.01 | 10mm to 50 mm | work37 | 15 | Nos. |
|---|
| 38 | 19 | Complete Servicing /Gland packing of HP Valves | | | |
|---|
| 39 | 19.01 | 50mm to 100 mm | work39 | 50 | Nos. |
|---|
| 40 | 19.02 | 100mm to 200 mm & above | work40 | 20 | Nos. |
|---|
| 41 | 20 | Repair & Refixing of seal platesof water wall S-Panel at Trough seal | work41 | 12 | Nos. |
|---|
| 42 | 21 | Complete Servicing of Spring Loaded Safety Valves/ERV | | | |
|---|
| 43 | 21.01 | Boiler Drum | work43 | 6 | Nos. |
|---|
| 44 | 21.02 | Main Steam line/ CRH LINE/HRH LINE/SOOT BLOWER LINE Safety Valve | work44 | 5 | Nos. |
|---|
| 45 | 22 | Complete External Cleaning of Boiler from Top to Bottom | work45 | 2 | LS |
|---|
| 46 | 23 | Hydraulic Test | work46 | 4 | Nos. |
|---|
| 47 | 24 | Servicing of Main Steam Stop Valve | work47 | 2 | Nos. |
|---|
| 48 | 25 | Safety Valve setting ( Tightining/Loosening) | work48 | 6 | Nos. |
|---|
| 49 | 26 | Assistance for Pressure setting of steam of Wall Blower/LRSB | work49 | 2 | LS |
|---|
| 50 | 27 | SERVICING OF SECONDARY AIR DAMPERS | work50 | 160 | Nos. |
|---|
| 51 | 28 | REPAIR OF PENT HOUSE | | | |
|---|
| 52 | 28.01 | Repair of Pent House by patching | work52 | 100 | RM |
|---|
| 53 | 28.02 | Dismanteling of Steel Structures/Installation of new steel plate | work53 | 1 | MT |
|---|
| 54 | 29 | REPAIR OF DEAD CHAMBER | | | |
|---|
| 55 | 29.01 | Repair of DEAD CHAMBER by patching | work55 | 150 | RM |
|---|
| 56 | 29.02 | Dismanteling of Steel Structures/Installation of new steel plate | work56 | 1 | MT |
|---|
| 57 | 30 | Preparation of Scaffolding in Bottom Ash Hopper Area | work57 | 2 | LS |
|---|
| 58 | 31 | Preparation of Scaffolding in Boiler Horizontal Pass ( Including Goosneck Part, Screen Tubes , TT Coil etc.) | work58 | 2 | LS |
|---|
| 59 | 32 | DP Test | work59 | 1000 | Running Inch |
|---|
| 60 | 33 | Repair/Refixing/fixing of SS Wire Mesh inside Bottom Ash Hopper | work60 | 100 | M2 ( Sq. Metre) |
|---|
| 61 | 34 | Fabrication & Erection Work of Platform & Approach ( As & where required in Boiler) | work61 | 10 | MT |
|---|
| 62 | 35 | Idling Charges (per month) | work62 | 12 | Month |
|---|