| 1 | 1 | Supply,Installation ,testing &commissioning of 20kVA UPS with following major specifications: [Make : APC / EMERSON / VERTIV / NUMERIC / SWITCHING AVO/ ABB/Powerone] | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 1.01 | TECHNOLOGY :Should be digitally controlled, IGBT based double conversion On-line VFI according to IEC62040-3 specification, Inverter and Rectifier both should be IGBT based. Isolation Transformer (Delta to Star connected) should be provided on the Inverter output ,outside of the UPS for modular UPS system. Output Neutral with Ground voltage should be <1 V \nNominal power : 20KVA Active power : 18KW In/Out phase Configuration : Three/Three, Three/Single Neutral : Neutral passing through \nOuput wave form on mains run : Pure Sinusoidal Bypass type : Static and electro-mechanical \nTransfer time : Zero | BI01010001010000000000000515BI0100001113 | | |
|---|
| 3 | 1.02 | INPUT :\nPhase : 3 Phase 4 Wires and Ground\nRated Voltage : 380/400/415Vac \nWorking Voltage Range: 320~478Vac \nFrequency Range : 45-55Hz at 50Hz/54-66Hz at 60Hz (auto sensing)\nPower Factor : =0.99\nCurrent THDi : =3%(100% linear load) \nBypass Voltage Range : \nMax.voltage: 220Vac: +25%(optional +10%,+15%,+20% )\n 230Vac: +20%(optional +10%,+15%)\n 240Vac: +15%(optional +10% )\n Min. voltage: -45% (optional -20%, -30%)\n Frequency protection range: ±10%\n | BI01010001010000000000000515BI0100001114 | | |
|---|
| 4 | 1.03 | OUTPUT : \nPhase : 3 Phase 4 Wires and Ground\nRated Voltage : 380/400/415Vac \nPower Factor : 0.9\nVoltage Regulation: ±1%\nFrequency Utility Mode: ±1%, ±2%, ±4%, ±5%, ±10% of the rated frequency(optional)\n Battery Mode : (50/60±0.2%)Hz\nCrest Factor : 3:1\nTHD : =2% with linear load\n =5% with non linear load Overload : \n110% for 1 Hr., 125% for 10 mins., 150% for 1 min.\nMinimum efficiency : Should be > 90% at full load\n | BI01010001010000000000000515BI0100001115 | | |
|---|
| 5 | 1.04 | BATTERY : Type & Voltage : SMF & 12V\nMinimum VAH required : 31200 VAH or, to satisfy the condition of 60 min run at full load whichever is higher. \nMinimum Backup time : 60 min at full load condition\nMake : Exide Power Safe / Amaron Quanta\nCharging cycle : Automatic float cum boost charging capability with settable float & boost charging voltages & current levels and boots charger timer.\n | BI01010001010000000000000515BI0100001116 | | |
|---|
| 6 | 1.05 | GENERAL FEATURES \nNoise level@1m : 46 dBA \nWorking temperature range : from 0 deg.C to 40 deg.C\nStorage temperature range : from-20 deg.C to + 50 deg.C (Excluded batteries)\nRelative Humidity range : 20-95% with out condensation\nProtection Degree : IP 21 CONFIGURATION AND MANAGEMENT : Technology Rectifier/Booster : IGBT\nCommunication interface : 2 serial port RS 232, SNMP Enabled. Slots for communication interface for SNMP \nInput/Output connection : 3P+N+PE Connectors on omega bar | BI01010001010000000000000515BI0100001117 | | |
|---|
| 7 | 1.06 | Normal Protection : Input, output, rectifier input, battery fuse, bypass fuse, short circuit etc. Thermal on system, rectifier, bypass and inverter. Protection against prolonged battery discharge | BI01010001010000000000000515BI0100001118 | | |
|---|
| 8 | 1.07 | METERING,ALARM : \n Audio alarm : Mains fail, Battery low pre-alarm, inverter trip etc.\nMetering : (i) input & output (a) Current:-RMS Value,peak value crest factor (b) Voltage:- ph-N RMS Value,ph-ph RMS value,bypass line (c) voltage (for input) Power:- Nominal power (VA), Active power(W),power factor, frequency\n(ii) Battery : voltage, current , capacity, history data, residual capacity, charging status\n(iii)Bypass : Enabling, Forced, DIP Speed, ECo Mode (iv) Miscellaneous : internal Temperature, DC bus voltage\nINDICATION/DISPLAY : Mains:- on/Fail/High/Low/Single Phasing,\nDC:- on/high,battery:-low pre-alarm/low trip,inverter:-on/trip,by-pass,intervention, overheats overloads,battery intervention,total discharge etc. | | 1 | Item |
|---|
| 9 | 1.08 | N.B : \n1. The OEM/Manufacturer should comply standard certification, it must be submitted during the uploading of tender documents or latest by prior to issuance of LOA failing which the bid may be cancelled and appropriate action leading to debbarment may be taken in due course.\n 2.The work shall be completed in all respect and shall be free from all kinds of defects/deficiencies/damages in equipment, materials, components and other auxiliaries and workmanship from any cause whatsoever for a period of Three years warrenty or, total replacement in case of major defects or fault for both the battery and UPS from the date of commisioning of the UPS. | | | |
|---|