Survey By Total Station & Preparation Of Detailed Project Report (Dpr) Of Multi Village (Pumping) Water Supply Schemes As Per Government Guidelines Along With The Hydraulics Design Of Prop Oosed Network, Pipe Line, Source Work, Rising Main, Gravity Ma
Tender Overview
Project Description
Survey By Total Station & Preparation Of Detailed Project Report (Dpr) Of Multi Village (Pumping) Water Supply Schemes As Per Government Guidelines Along With The Hydraulics Design Of Proposed Network, Pipe Line, Source Work, Rising Main, Gravity Main, Rcc Reservoirs, Building Structures, Preparation Of Unit Cost Estimates, Design & Detailed Drawing In Auto Cad Software Of All Works As Per Direction Of Engineer In Charge And Including Details Of Existing Water Supply Network/Structures, The Consultants Will Submit Soft Copy Of Dpr Along With Hard Copy And Five Sets Of Drawings In Hard And Soft Copy The Assigned Task Shall Include All Activities To Get Technical And Administrative/Financial Approval From The Competent Authority Up To The Level Of Government Of Uttarakhand.
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Offline submission at the designated office.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender